Message ID: 894     Entry time: Tuesday, April 21, 2015, 17:14
Author: Isaac Earle 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UC#12 
Subject: UC#12 Installed in TM1 

On Friday April 17th, UC#12 target was installed in TM1.  One of the copper water lines was bent slightly as the target was lifted into the module which caused ~15 minute delay due to difficulty getting the VCR nut threads to engage.  Other than this the install went smoothly.

During replacement of the containment box panel two of the threaded holes were found to be stripped.  One on the top at the center, the other in the bottom right corner.  These two holes were left without fasteners (see attached photo).  It is unknown at this time whether these holes were already stripped, or if they were stripped during this installation.

Attachment 1: IMG_4836.JPG  3.849 MB  | Show | Hide all
Attachment 2: IMG_4833.JPG  3.623 MB  | Show | Hide all