367
|
Monday, May 27, 2013, 16:07 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta #40 | HV conditioning | The HV conditioning reached a maximum
of 44kV today before a spark took out the
canbus card. I will attach the data once |
|
|
368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
|
375
|
Tuesday, June 04, 2013, 15:34 |
Bevan Moss | Conditioning Station | Repair | | | Relay replaced | ESC was called out again to inspect the
chiller as it was showing the same problem
as before. This time when started one fan |
|
|
386
|
Tuesday, June 25, 2013, 14:56 |
Bevan Moss | Conditioning Station | Standard Operation | TM1 | UCx#6 | Roughing Pumps Started | The roughing pumps have been started
on the conditioning station. As it is late
in the day for David he will make the turbo |
|
|
398
|
Friday, July 05, 2013, 10:02 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No source tray | TM3 module move to TCS | TM3 has been moved from the south hot cell
to the conditioning station. David and I
completed the move. All went well. |
|
|
404
|
Monday, July 22, 2013, 15:52 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | No Source Tray | HV testing update | I have fallen behind on the
HV testing that has been completed on TM3.
Data can be found on docushare in the TM3 |
|
|
436
|
Thursday, August 29, 2013, 10:09 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Heat Shield Circuit Leak |
|
|
|
438
|
Thursday, August 29, 2013, 17:16 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair | Today Chad entered the south hot
cell on work permit 2013-08-29-3 to repair
the leaking heat shield line. The heat shield |
|
|
439
|
Friday, August 30, 2013, 10:27 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair |
|
|
|
440
|
Friday, August 30, 2013, 14:55 |
Bevan Moss | South Hot-Cell | Repair | TM3 | N/A | Heat Shield Repair |
|
|
|
441
|
Wednesday, September 04, 2013, 12:21 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Ante-room work | September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and |
|
|
444
|
Friday, September 06, 2013, 16:41 |
Bevan Moss | South Hot-Cell | Development | TM3 | | C-Seal crush investigation | Today Maico completed the new leak
testing tool and blank off. He tested them
with C-seals without springs and all was |
6x |
|
450
|
Wednesday, September 11, 2013, 15:37 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | C-Seal leak checking and repair | This e-log is to cover the work completed
from September 9th until the 11th.
September 9th |
|
|
455
|
Tuesday, September 17, 2013, 14:36 |
Bevan Moss | South Hot-Cell | Standard Operation | TM3 | | Containment Box has been removed | The containment box has been removed.
Tomorrow the wiring harness will be installed. |
|
|
458
|
Thursday, September 19, 2013, 15:56 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities for September 18th and 19th | September 18th
The wiring harness was completed
by Maico and Travis today (see pics) and |
|
|
460
|
Monday, September 23, 2013, 16:10 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Activities Sept 20 - 23 2013 | September 20th
Today was a trying day. When attempting
to make the water line connections for the |
|
|
462
|
Tuesday, September 24, 2013, 14:46 |
Bevan Moss | South Hot-Cell | Repair | | | Right manipulator repair | |
|
|
468
|
Thursday, September 26, 2013, 14:31 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 | September 24
After the manipulator repair
Maico installed the NiO#2 onto the target |
|
|
469
|
Thursday, September 26, 2013, 14:37 |
Bevan Moss | Conditioning Station | Standard Operation | TM3 | NiO#2 | Leak check / Pressure Test |
|
|
|
470
|
Thursday, September 26, 2013, 14:42 |
Bevan Moss | South Hot-Cell | Repair | TM3 | NiO#2 | Activities September 24 - 25 |
|
|