  557   Tuesday, November 26, 2013, 14:10 Travis CaveCraneMaintenance  Thermal relay replacedThe bad thermal motor protection relay
for the crane has been replaced with a new
unit. Crane was tested in pendant(local)
  
  559   Wednesday, November 27, 2013, 15:24 Bevan MossSouth Hot-CellMaintenanceTM3 Wiring Harness Electrical Test Maico removed the containment box
today allow Travis and I to further test
the wiring harness. I disconnected the junction
 IMG_1269.JPG 
  579   Thursday, January 09, 2014, 11:07 chad fisherSouth Hot-CellMaintenance  Field LevelI have managed to reduce the field at the
broken manipulator from 12 mSv/h to 400 uSv/h.
  
  583   Monday, January 20, 2014, 13:40 maicodallavalleSpent Target VaultMaintenance F-308Empty F-308sFour empty F-308s just arrived back at
Triumf. I moved them  from shipping
to the Remote Handling Shop for service and
  
  612   Thursday, March 06, 2014, 06:28 David WangConditioning StationMaintenanceTM1 TM1 had been moved from silo to CSTM1 has been successfully moved from silo
to CS. The CS vacuum system is connected 
to TM1. Turbo pumps on TM1 and CS have been
  
  613   Thursday, March 06, 2014, 06:58 David WangITEMaintenanceTM3 ITE vacuum and leak check on ITE BL2A window flange.ITE and TM3 Turbo pumps have been started
successfully yesterday. The vacuum reading
on all ITE high vacuum gauges are at low
  
  614   Thursday, March 06, 2014, 12:59 David WangConditioning StationMaintenanceTM1 Restart TM1 and CS TPs Restarted TM1 and CS turbo pumps after
the power off. Everything is fine .
  
  638   Friday, April 04, 2014, 14:59 Keith C NgITEMaintenance  measurement of new beam tube sectionR. Kuramoto and A. Laxdal measured the
distance from the 2A tunnel to the tank flange
of ITE. The new fabricated beam pipe with
 wall_to_flange_length.pdf 
  660   Wednesday, May 14, 2014, 19:01 Grant MinorITEMaintenanceTM3 HV short inspection at ITEFriedhelm Ames commented to me that there
appears to be a short between High Voltage
and Ground at TM3 at ITE.
  
  664   Tuesday, May 27, 2014, 09:38 maicodallavalleSpent Target VaultMaintenance F-308 Maintenance F-308 MaintenanceAll the F-308's can back from being certified
at Nordion.  All of the F-308's have
been serviced and are ready to be filled
  
  665   Tuesday, May 27, 2014, 09:42 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceAll of the serviced F-308's have been moved
to the South Hot cell area.
  
  699   Monday, July 07, 2014, 14:45 Grant MinorITEMaintenanceTM3SiC #30FEBIAD gas line checkThere were some problems this morning with
provision of FEBIAD gas to the the target
at ITE.  It was suspected that the gas
 ITE_Febiad_Gas_Line_Check_7July2014_arrows.jpg 
  719   Wednesday, July 30, 2014, 11:51 Travis CaveConditioning StationMaintenance  entrance module moveITE Entrance module has been moved from
the east station to the conditioning station.
  
  766   Thursday, October 16, 2014, 15:40 Anders MjosConditioning StationMaintenance  Chiller unitNOTE: If there is a problem with
the chiller unit (ie Fault 1 or Fault 2),
a power cycle may reset the VFDs for the
 TCS_Cooling_System.pdf 
  767   Friday, October 17, 2014, 13:36 Anders MjosConditioning StationMaintenance  TCS:Chil staging not operationalNOTE: If cooling is required, the
compressors will have to be run manually.
Make sure to switch it off again when the
  
  774   Wednesday, October 22, 2014, 13:05 Anders MjosConditioning StationMaintenance  Controls upgrade on TCS See work
permit for details
  
  804   Monday, December 01, 2014, 12:05 maicodallavalleSpent Target VaultMaintenance  F-308 MaintenanceF-308's have been serviced and are ready
to be filled with spent targets. F-308's
witch were serviced are #6,#13,#15,#16,and
  
  819   Monday, December 15, 2014, 08:50 Anders MjosConditioning StationMaintenanceTM2 TK2 level below 15 in (secondary loop) The level dropped below 15 in over
the weekend. MP2 stopped, but MP3 condtinued
pumping.
  
  820   Monday, December 15, 2014, 09:41 Anders MjosConditioning StationMaintenanceTM2 Water leak found at the isolation transforer

    

       
            
  
  821   Monday, December 15, 2014, 12:53 Anders MjosConditioning StationMaintenanceTM2 TCSTK2 topped up

    

       
            
  