Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2482     Entry time: Tuesday, August 29, 2023, 09:28
Author: Frank Song 
Category: ITW 
Type: Repair 
Module: TM2 
Target/Number: Nb#11 
Subject: Module Connection 

 Module was connected yesterday and all turbo pumps are running at their top speed. 

Attachment 1: TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf  98 kB  | Show | Hide all
ELOG V2.9.2-2455