Logbooks
Lab Maintenance
Evaporator_1
Evaporator_2
Laser cutter
Target Production
Test-Stand
RH-ISAC
RH-Cyclotron
RH-Meson Hall
RH-Beamlines
RH-ARIEL
RH-ISAC
Not logged in
List
Message ID:
2482
Entry time:
Tuesday, August 29, 2023, 09:28
Author:
Frank Song
Category:
ITW
Type:
Repair
Module:
TM2
Target/Number:
Nb#11
Subject:
Module Connection
Module was connected yesterday and all turbo pumps are running at their top speed.
Attachment 1:
TM2_with_Nb#11_connection_in_ITW_2023-08-28.pdf
98 kB
|
Show
|
Hide all
ELOG V2.9.2-2455