Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2481     Entry time: Tuesday, August 29, 2023, 09:07
Author: Frank Song 
Category: ITW 
Type: Repair 
Module: TM2 
Target/Number: Nb#11 
Subject: electrical check 

 TM2 with new target Nb#11 replaced has been electric checked one more time in ITW.

Attachment 1: TM2_with_Nb#11_electical_check_in_ITW_2023-08-28.pdf  114 kB  | Show | Hide all
ELOG V2.9.2-2455