Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2705     Entry time: Friday, October 11, 2024, 15:59
Author: Aaron Tam 
Category: Facilities 
Type: Repair 
Module:  
Target/Number:  
Subject: ISAC B2 North Hot Cell Phone Fixed 

 Resolution comment / Commentaire de résolution:

     Fixed issue by changing patch cord that was connected to the switch from patch panel.

Emile V

ELOG V2.9.2-2455