72
|
Wednesday, February 01, 2012, 09:54 |
David Wang | ITW | Maintenance | TM1 | | ITW and TM1 winter shut down vacuum leak check | ITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel, |
|
166
|
Friday, August 31, 2012, 12:10 |
chad fisher | South Hot-Cell | Maintenance | | | Hot Cell Maitenance | Entered south hot cell Wednesday and replaced
the pre-filter air filter as well as the
front two light bulbs. Also removed two bags |
|
200
|
Friday, November 02, 2012, 08:45 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308 have been cleaned and serviced.
There were three F-308's that came back with
some contamination.#13, #15 and #19 were |
|
229
|
Thursday, January 10, 2013, 10:40 |
David Wang | ITW | Maintenance | | | Replaced all high active water system magnetic pedal wheels in ITW and ITE. | I replaced all high active water system
magnetic pedal wheels in ITW and ITE. This
is a preventive maintenance job we planned |
|
243
|
Friday, February 08, 2013, 11:42 |
Grant Minor | ITE | Maintenance | | | TAPC 477 resolved - ISAC elec. room gas cylinder | See attached TAPC 477 documentation. |
|
251
|
Friday, March 01, 2013, 11:35 |
David Wang | ITE | Maintenance | TM4 | | Leak check on ITE and TM4. | The
leak check on TM4 and ITE is done. All primary
vacuum vessel , secondary vacuum vessel |
|
252
|
Wednesday, March 06, 2013, 10:09 |
Travis Cave | ITW | Maintenance | | | module move | ITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station. |
|
253
|
Wednesday, March 06, 2013, 12:50 |
Travis Cave | South Hot-Cell | Maintenance | | | module move | ITW EX1 have been moved back to the west
target station from the south hot cell. |
|
284
|
Wednesday, April 03, 2013, 12:26 |
David Wang | ITE | Maintenance | TM4 | Sic LIS/RFQ | Leak check on ITE TM4. | TM 4 had been leak check in ITE due to
relatively high PNG1 and IG1 readings.All
TM4 primary and secondary vessel air |
|
294
|
Thursday, April 11, 2013, 07:18 |
David Wang | Conditioning Station | Maintenance | TM1 | Ta#29 | helium pressure tested all water lines in TM1 at CS | On April 08th, all water lines in TM1 had
been helium pressure tested(70psi) at conditioning
station. No leak had been found. |
|
305
|
Friday, April 19, 2013, 10:48 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Turbo Pump 2 replaced | Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit. |
|
306
|
Friday, April 19, 2013, 10:48 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Turbo Pump 2 replaced | Turbo Pump 2 has been replaced on
TM3. I got a count of 350 on the sleeve of
my tank suit. |
|
317
|
Tuesday, April 23, 2013, 16:11 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | N/A | Chiller Fault 2 | During Testing it was noticed that
Fault 2 was indicated and one of the compressors
would not run. Fault 2 does not indicate |
|
320
|
Wednesday, April 24, 2013, 10:36 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | The F-308's have been serviced and are
ready to be filled. All inspection records
are stored in docushare. |
|
361
|
Thursday, May 23, 2013, 14:12 |
Bevan Moss | Conditioning Station | Maintenance | | | Primary Circuit Drained and Flushed | Rob Walker has drained the primary
side of the conditioning station. It will
be flushed, filled and chemically treated. |
|
363
|
Monday, May 27, 2013, 10:37 |
Bevan Moss | Conditioning Station | Maintenance | TM4 | | Cooling Systems topped off | Rob walker has flushed and refilled the
primary side of the system (note the water
still looks nasty). This morning the primary |
|
417
|
Wednesday, August 07, 2013, 06:47 |
maicodallavalle | Spent Target Vault | Maintenance | | | F-308 | All the F-308's have been torqued up
and the locks installed. Ready to be moved. |
|
418
|
Wednesday, August 14, 2013, 11:50 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | | module move | TM#3 and its new source tray have been
both moved into the south hot cell. |
|
457
|
Thursday, September 19, 2013, 11:09 |
Travis Cave | South Hot-Cell | Maintenance | TM3 | no target | Electrical check | Electrical check of TM#3 with no target
was performed and it failed. |
|
471
|
Thursday, September 26, 2013, 14:47 |
Bevan Moss | Conditioning Station | Maintenance | TM3 | NiO#2 | Water pumps turned on | The water pumps for the conditioning
station were turned on at ~11:45. It took
longer to start the conditioning station |
|