Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2330     Entry time: Monday, June 20, 2022, 11:00
Author: Frank Song 
Category: North Hot-Cell 
Type: Repair 
Module: TM2 
Target/Number: SiC#42 
Subject: Failed Sic#42 electrical measurement at NHC 

 An electrical check was done at NHC, see attachment pls.

Attachment 1: Failed_Sic#42_electrical_measurement_at_NHC.jpg  643 kB  | Show | Hide all
ELOG V2.9.2-2455