Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2417     Entry time: Tuesday, February 14, 2023, 11:36
Author: David Wang 
Category: Assembly/Bench Test 
Type: Repair 
Module:  
Target/Number:  
Subject: Turbo pump BVs o-ring replacement.  

Five of used  internal leaked  TP BVs are serviced and repaired. Internal plunge  o-ring and case o-ring are replaced on all five BVs. Leak checked valves after  . They are ok to be used as spare parts.  The are active parts stored in TH now.

ELOG V2.9.2-2455