Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 2431     Entry time: Friday, April 14, 2023, 10:01
Author: Adam Newsome 
Category: Assembly/Bench Test 
Type: Repair 
Module:  
Target/Number:  
Subject: Assaying Turntable Repair 

The spent target assaying turntable was repaired. It was tested today with a load exceeding the maximum it would need to handle during rotation (100 kg). It works as expected and is ready for operation.

ELOG V2.9.2-2455