101
|
Tuesday, March 14, 2017, 17:28 |
Jason Kapalka | Cyclotron | Maintenance | Lower resonator removal simulation exercice | A simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the
|
|
112
|
Tuesday, January 22, 2019, 07:18 |
Dan McDonald | Elevation Jack | Maintenance | Station 11-12 jack swap and hoist plate instal | Prior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions |
|
113
|
Wednesday, September 04, 2019, 15:29 |
Adam Newsome | Trolley | Maintenance | Connector faceplate and tubing upgrade | Tool Trolley:
The connector faceplate was replaced
with a new version to allow for more space |
|
122
|
Sunday, April 05, 2020, 13:24 |
Dan McDonald | Elevation Jack | Maintenance | Elevating system station swap 2019-2020 | Station 11-12 where swapped for station
13-14 during 2018-2019 shutdown. Once lock
out and motor disconnect was complete we |
|
126
|
Wednesday, January 13, 2021, 11:35 |
Adam Newsome | Shielding | Maintenance | Shadow Shields Inspection - 2021 Shutdown | All shadow shields which are remotely placed
inside the cyclotron during shutdown were
inspected by Adam Newsome and Chris Peterson |
|
129
|
Friday, February 26, 2021, 08:29 |
Adam Newsome | Trolleys serviced | Maintenance | First Turn Radial Flag (FTRF) Jig - Pneumatic Upgrade | Old fittings and broken pneumatic tubing
on the FTRF jig have been replaced with new
push-connect fittings and polyurethane tubing. |
|
130
|
Friday, February 26, 2021, 13:00 |
Adam Newsome | Trolleys serviced | Maintenance | Lower Resonator Trolley - Radial Drive Failure Issue | On Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley |
|
146
|
Thursday, October 06, 2022, 17:15 |
Adam Newsome | Elevation Jack | Maintenance | Preventative Maintenance: MCC-E elevating system motor contactors | Under work permit C2022-10-04-1,
the motor contactors for jack motors 1 through
12 were replaced. The contactors showed signs |
|
150
|
Friday, February 03, 2023, 08:27 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System Jack Inspection | Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023). |
|
157
|
Thursday, September 14, 2023, 13:51 |
Adam Newsome | Trolley | Maintenance | Lift Trolley: upgrades to camera tilt mechanism | The two camera tilt mechanisms on the lift
trolley have been upgraded. Upgrades include:
For the individual camera: |
|
158
|
Friday, September 15, 2023, 10:15 |
Adam Newsome | Trolley | Maintenance | Lift Trolley: mirror actuation mechanism repair/upgrade | The mirror actuation mechanism was observed
to be "sticky" during 2023 winter
shutdown - it occasionally did not function |
|
161
|
Tuesday, November 14, 2023, 12:38 |
Nadia Jorgenson | Service Bridge | Maintenance | Bridge Orbit Counter Work in 2023 | All the bearings on both
the upper and lower wheel were replace to |
|
162
|
Tuesday, January 23, 2024, 14:03 |
Adam Newsome | Elevation Jack | Maintenance | Inspection of elevating system motor contacts | Motor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1. |
|
163
|
Wednesday, January 31, 2024, 11:39 |
Adam Newsome | Elevation Jack | Maintenance | Jack station 11: synchro replaced | Because of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this |
|
164
|
Wednesday, January 31, 2024, 15:06 |
Eric Lahe | Elevation Jack | Maintenance | Elevating System - Annual Station Swap 2023-2024 | The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322,
Work done after electrical lockout |
|
166
|
Thursday, February 08, 2024, 08:50 |
Adam Newsome | Elevation Jack | Maintenance | Elevating system - station 10 motor contactor issue | It was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor |
|
175
|
Tuesday, May 14, 2024, 10:53 |
Riley Sykes | Carrier | Maintenance | Carrier underrail wheels maintenance | All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set. |
|
176
|
Thursday, May 16, 2024, 12:33 |
Riley Sykes | Service Bridge | Maintenance | Center Post Bearing | Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES |
|
177
|
Friday, May 31, 2024, 08:57 |
Riley Sykes | Carrier | Maintenance | Carrier Drive motor/gear reducer | Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder |
|
178
|
Friday, May 31, 2024, 11:28 |
Riley Sykes | Service Bridge | Maintenance | Outrigger mechanical inspection | Both outriggers were inspected and
were found to be mechanically sound. No damage
to components or hardware visible, will revisit |
|