  101   Tuesday, March 14, 2017, 17:28 Jason KapalkaCyclotronMaintenanceLower resonator removal simulation exerciceA simulated removal of a lower resonator from
the Cyclotron tank was attempted by the RH
group using the 
  
  112   Tuesday, January 22, 2019, 07:18 Dan McDonaldElevation JackMaintenanceStation 11-12 jack swap and hoist plate instalPrior to commencing work on jacking stations
we installed a wall mounted come along plate
as per Jason kapalkas instructions  
  
  113   Wednesday, September 04, 2019, 15:29 Adam NewsomeTrolleyMaintenanceConnector faceplate and tubing upgradeTool Trolley: 
The connector faceplate was replaced
with a new version to allow for more space
  
  122   Sunday, April 05, 2020, 13:24 Dan McDonaldElevation JackMaintenanceElevating system station swap 2019-2020Station 11-12 where swapped for station
13-14 during 2018-2019 shutdown. Once lock
out and motor disconnect was complete we
  
  126   Wednesday, January 13, 2021, 11:35 Adam NewsomeShieldingMaintenanceShadow Shields Inspection - 2021 ShutdownAll shadow shields which are remotely placed
inside the cyclotron during shutdown were
inspected by Adam Newsome and Chris Peterson
  
  129   Friday, February 26, 2021, 08:29 Adam NewsomeTrolleys servicedMaintenanceFirst Turn Radial Flag (FTRF) Jig - Pneumatic UpgradeOld fittings and broken pneumatic tubing
on the FTRF jig have been replaced with new
push-connect fittings and polyurethane tubing.
 PXL_20210216_202019350.jpg 
  130   Friday, February 26, 2021, 13:00 Adam NewsomeTrolleys servicedMaintenanceLower Resonator Trolley - Radial Drive Failure IssueOn Feb. 24 while practising a training
exercise, the lower resonator trolley unexpectedly
experienced a radial drive failure. The trolley
  
  146   Thursday, October 06, 2022, 17:15 Adam NewsomeElevation JackMaintenancePreventative Maintenance: MCC-E elevating system motor contactorsUnder work permit C2022-10-04-1,
the motor contactors for jack motors 1 through
12 were replaced. The contactors showed signs
 Elevating_System_Motor_Contactors_2022-10-06.png 
  150   Friday, February 03, 2023, 08:27 Eric LaheElevation JackMaintenanceElevating System Jack Inspection  Annual Jack Inspection: The annual
elevation system inspection has been completed
(Jan 31,2023).
 Elevation_System_Checklist_-_Jan312023.xlsx 
  157   Thursday, September 14, 2023, 13:51 Adam NewsomeTrolleyMaintenanceLift Trolley: upgrades to camera tilt mechanismThe two camera tilt mechanisms on the lift
trolley have been upgraded. Upgrades include:
For the individual camera:
 PXL_20230914_193143524.jpg 
  158   Friday, September 15, 2023, 10:15 Adam NewsomeTrolleyMaintenanceLift Trolley: mirror actuation mechanism repair/upgradeThe mirror actuation mechanism was observed
to be "sticky" during 2023 winter
shutdown - it occasionally did not function
 PXL_20230915_164811247.jpg 
  161   Tuesday, November 14, 2023, 12:38 Nadia JorgensonService BridgeMaintenanceBridge Orbit Counter Work in 2023 All the bearings on both
the upper and lower wheel were replace to
  
  162   Tuesday, January 23, 2024, 14:03 Adam NewsomeElevation JackMaintenanceInspection of elevating system motor contactsMotor contactors for the cyclotron elevating
system jacks were inspected on 2025-01-23
by Joel Semilla under work permit C2024-01-19-1.
 Elev_Motor_1.jpgElev_Motor_2.jpg 
  163   Wednesday, January 31, 2024, 11:39 Adam NewsomeElevation JackMaintenanceJack station 11: synchro replacedBecause of observed noise on the synchro
at jack station 11 during recent shutdown
lid up/down operations, the synchro at this
  
  164   Wednesday, January 31, 2024, 15:06 Eric LaheElevation JackMaintenanceElevating System - Annual Station Swap 2023-2024 The annual elevating system maintenance
for the 2023-2024 shutdown following Document-220322, 
Work done after electrical lockout
  
  166   Thursday, February 08, 2024, 08:50 Adam NewsomeElevation JackMaintenanceElevating system - station 10 motor contactor issueIt was observed during lid up operation
on 2024-02-08, approximately halfway through
raising the lid, that the motor contactor
  
  175   Tuesday, May 14, 2024, 10:53 Riley SykesCarrierMaintenanceCarrier underrail wheels maintenance All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set.
  
  176   Thursday, May 16, 2024, 12:33 Riley SykesService BridgeMaintenanceCenter Post Bearing Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES
  
  177   Friday, May 31, 2024, 08:57 Riley SykesCarrierMaintenanceCarrier Drive motor/gear reducer Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder
  
  178   Friday, May 31, 2024, 11:28 Riley SykesService BridgeMaintenanceOutrigger mechanical inspection Both outriggers were inspected and
were found to be mechanically sound. No damage