  86   Wednesday, March 09, 2016, 17:09 Ron KuramotoCyclotronDevelopmentEX4N new housing installationThe new EX4N housing assembly drawing TEC0071
(unfinished) was installed and connected
to the EX4 tank side port flange over a 3
 dspage07994143927104268192.pdfExtr_4N_Final_instalation_-_gimbal-pipe-valve.docxIMG_1886.JPG 
  51   Wednesday, January 28, 2015, 14:33 Travis CaveCyclotronStandard OperationDay two of in tank workAll copper blocker removed from the cyclotron
and first radiation survey done. Shields
start tomorrow.
  
  52   Thursday, January 29, 2015, 14:53 Travis CaveCyclotronStandard OperationDay three of in tank workOver 50% of the shields are in some 700's
left and the monitor box covers.
  
  50   Tuesday, January 27, 2015, 14:40 Travis CaveCyclotronStandard OperationDay one of in tank workDay one of RH in tank work for the cyclotron
(shields and blockers stuff like that) many
pictures were taken.
  
  53   Friday, January 30, 2015, 15:02 Travis CaveCyclotronStandard OperationDay four of in tank workAll shields, ladders and pothole covers
are in. One rad survey left to do.
  
  54   Monday, February 02, 2015, 14:28 Travis CaveCyclotronStandard OperationDay five of in tank workFinal Radiation Survey done. All in tank
work completed bridge removed from the tank.
  
  77   Wednesday, February 03, 2016, 08:16 Dan McDonaldCyclotronStandard OperationCyclotron lid up Lid up procedure Started at  12:00pm.
Initial numbers. # 1-47,2-49,3-45,4-47,5-47,6-47,7-49,8-45,9-50,10-50,11-51,12-49.
After a number of unsuccessful attempts at
 lid_up_2016.pdf 
  45   Friday, July 04, 2014, 07:21 Dan McDonaldElevation JackStandard OperationCyclotron lid down July-2- 2014Cyclotron lid down was successfully completed
on July 2 2014. Lid went partially down before
jack nine had to be jogged to catch up to
  
  105   Tuesday, January 16, 2018, 13:43 Travis CaveCyclotronStandard OperationCyclotron in tank work All cyclotron in tank work has been
completed.
  
  117   Wednesday, February 05, 2020, 12:37 Adam NewsomeCyclotronDevelopmentCyclotron Vacuum Cleaning Tool - Initial TestThe vacuum cleaning tool (TRH1366, vacuum
cleaning configuration) was tested in the
cyclotron tank. The following test were performed:
 IMG_20200205_093927.jpg 
  118   Wednesday, February 05, 2020, 12:44 Adam NewsomeCyclotronDevelopmentCyclotron Small Object Retrival Tool - Intial TestThe small object retrieval tool was tested
in the cyclotron tank for the first time.
At this time, there are no known accessible
 IMG_20200205_112703.jpg 
  133   Wednesday, May 05, 2021, 12:20 Adam NewsomeInfrastructureDevelopmentCyclotron RH Control Room: Outlets InstalledThe following outlets were installed by
Electrical Services Group in order to facilitate
upgrading power supplies for Cyclotron Remote
  
  123   Thursday, July 16, 2020, 11:57 Adam NewsomeCyclotronDevelopmentCyclotron Mockup: Orbital Position Pendant UpgradeThe pendant used for controlling the orbital
motion of the bridge mockup was upgraded.
Features of the new pendant include:
 Before.jpgAfter.jpg 
  21   Monday, March 18, 2013, 15:12 Isaac EarleCyclotronMaintenanceCyclotron Magnet Face Gap MeasurementsMeasurements of the cyclotron magnet face
gap were taken on March 15, 2013 at two locations
around the tank with the cyclotron lid in
 8x 
  44   Wednesday, July 02, 2014, 16:46 Grant MinorElevation JackStandard OperationCyclotron Lid-Up Report for 27 June 2014The cyclotron lid was raised on June 27th,
2014.  Start time was 1:05pm end time
was 2:17pm (good!) Dan McDonald collected
  
  28   Thursday, January 23, 2014, 18:47 Grant MinorElevation JackStandard OperationCyclotron Lid-Up Report - 22 Jan 2014Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron
 6x 
  64   Thursday, March 26, 2015, 15:48 Grant MinorElevation JackStandard OperationCyclotron Lid-Up 26 March 2015Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid
  
  41   Monday, March 03, 2014, 15:07 Grant MinorElevation JackStandard OperationCyclotron Lid-Down Report Monday 3-March-2014The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on
  
  103   Monday, January 08, 2018, 09:04 Maico Dalla Valle / Jason KapalkaCyclotronStandard OperationCyclotron Lid UpRemote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
 Cyclotron_Elevation_Maintenance_Rotation_Record_20180223.xlsx 
  68   Thursday, April 16, 2015, 15:26 Grant MinorElevation JackMaintenanceCyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015   Cyclotron_Elevating_System_Maintenance_Rotation_Record_16Apr2015.pdf 