  28   Thursday, January 23, 2014, 18:47 Grant MinorElevation JackStandard OperationCyclotron Lid-Up Report - 22 Jan 2014Yesterday Grant Minor (me), Maico Dalla
Valle, Dan Louie, and Arthur Leung worked
with Operations to perform the Cyclotron
 6x 
  64   Thursday, March 26, 2015, 15:48 Grant MinorElevation JackStandard OperationCyclotron Lid-Up 26 March 2015Lid was raised today (2nd time during 2015
shutdown) for additional inflector work.
Dan and Maico report that the lid
  
  41   Monday, March 03, 2014, 15:07 Grant MinorElevation JackStandard OperationCyclotron Lid-Down Report Monday 3-March-2014The Cyclotron Lid Down was successfully
completed today on Work Permit C2014-03-03-6.
The system only tripped twice on
  
  103   Monday, January 08, 2018, 09:04 Maico Dalla Valle / Jason KapalkaCyclotronStandard OperationCyclotron Lid UpRemote Handing is ready for January, 8 2018
Cyclotron lid up. Elevating system service
has been completed.
 Cyclotron_Elevation_Maintenance_Rotation_Record_20180223.xlsx 
  68   Thursday, April 16, 2015, 15:26 Grant MinorElevation JackMaintenanceCyclotron Elevating System Maintenance Rotation Record - Updated 16 Apr 2015   Cyclotron_Elevating_System_Maintenance_Rotation_Record_16Apr2015.pdf 
  143   Tuesday, May 10, 2022, 11:30 Nadia JorgensonCyclotronRepairCracked Festooning Rail Bushing Removed We removed the left bushing that
is around the air cylinder on the festooning
rail, right outside the cyclotron. It was
 Festooning_Bushing_Cracked.jpg 
  29   Friday, January 24, 2014, 14:10 Travis CaveCyclotronStandard OperationCopper blockersThe copper blockers have been removed from
the cyclotron and placed into the coffins.
  
  66   Friday, March 27, 2015, 11:25 Travis CaveCyclotronStandard OperationCopper BlockersCopper Blockers have been removed from
the cyclotron and one ladder has been installed.
  
  169   Monday, February 26, 2024, 11:52 Adam NewsomeCyclotronRepairControls issue - CAMAC power supplyAn issue was encountered on 2024-02-23
when attempting to operate the lift trolley.
  
  61   Tuesday, March 10, 2015, 10:24 chad fisherElevation JackMaintenanceContaminated equipment updateThe harness, carabineer, and shock packed
used during the ISAC hot cell swipe have
been checked seperately by Mike and he has
  
  113   Wednesday, September 04, 2019, 15:29 Adam NewsomeTrolleyMaintenanceConnector faceplate and tubing upgradeTool Trolley: 
The connector faceplate was replaced
with a new version to allow for more space
  
  88   Thursday, April 07, 2016, 11:04 Travis CaveCyclotronStandard OperationClosed the shield doorThe shield door on the B2 level of the
RH building has been closed.
  
  60   Monday, March 09, 2015, 11:55 chad fisherElevation JackMaintenanceChecking for contamination on fall arrest equip.Fall equipment from the lockers in the
RH shop have been checked for contamination
and the lockers themselves have been swiped.
  
  176   Thursday, May 16, 2024, 12:33 Riley SykesService BridgeMaintenanceCenter Post Bearing Center post bearing on service bridge
inspected, turned freely by hand and regreased
with Molub-Alloy 777-1 ES
  
  175   Tuesday, May 14, 2024, 10:53 Riley SykesCarrierMaintenanceCarrier underrail wheels maintenance All 4 Under rail wheels serviced
and cleaned. All Timken bearings repacked
with grease. No defects in any bearing set.
  
  177   Friday, May 31, 2024, 08:57 Riley SykesCarrierMaintenanceCarrier Drive motor/gear reducer Motor/Gearbox unit removed from carrier
and fully inspected and serviced. Oil changed
on May 29th using Mobil 600 W Super Cylinder
  
  69   Tuesday, July 28, 2015, 11:47 Dan McDonaldTrolleyMaintenanceCamera trolley serviceServiced the Camera trolley this morning
as per Mike Gallops service outline.
  
  96   Friday, March 03, 2017, 13:30 Jason KapalkaCyclotronStandard OperationCP continuity testPerformed continuity test at Cyclotron center
post with RH and Operations group members
using the service bridge, 
  
  43   Monday, April 28, 2014, 10:20 Dan McDonaldService BridgeMaintenanceBridge orbit reduction boxNoticed oil leaking out of reduction box,
scan and swipe, disconnect e motor and all
related cables from bridge, remove motor
  
  161   Tuesday, November 14, 2023, 12:38 Nadia JorgensonService BridgeMaintenanceBridge Orbit Counter Work in 2023 All the bearings on both
the upper and lower wheel were replace to
  