30
|
Monday, January 27, 2014, 14:42 |
Travis Cave | Shielding | Standard Operation | shields and radiation survey | The cyclotron radiation survey was aborted
due to the orbit not working recording the
numbers correctly. One shield has been in |
|
31
|
Tuesday, January 28, 2014, 14:59 |
Travis Cave | Shielding | Standard Operation | shields | 200's, 400's, 500's, 600's, and a pallet
of 700's have been installed |
|
33
|
Thursday, January 30, 2014, 13:47 |
Travis Cave | Cyclotron | Standard Operation | shields | All shields, pothole covers, and ladders
have been installed into the cyclotron. |
|
38
|
Tuesday, February 25, 2014, 15:00 |
Travis Cave | Shielding | Standard Operation | shields | Started on the removal of shields. |
|
39
|
Wednesday, February 26, 2014, 14:55 |
Travis Cave | Shielding | Standard Operation | shields | More shields have been removed from the
cyclotron only 16 remain. I was also noted
that the lift trolley is making an odd noise |
|
40
|
Monday, March 03, 2014, 13:09 |
Travis Cave | Cyclotron | Standard Operation | shields | all shields, porthole covers and ladder
out and copper blockers in. Some conmination
was found on the pads of the ladders (about |
|
78
|
Friday, February 05, 2016, 14:55 |
Travis Cave | Shielding | Standard Operation | shadow shields | all 200, 400, 500, 600, and some 700 series
of shield are in. |
|
80
|
Tuesday, February 09, 2016, 14:48 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All shadow shields have been installed.
Ladders, the pothole covers and the second
rad survey will be done tomorrow. |
|
81
|
Wednesday, February 10, 2016, 14:53 |
Travis Cave | Cyclotron | Standard Operation | shadow shields | All cyclotron in tank work is completed. |
|
79
|
Friday, February 05, 2016, 14:57 |
Travis Cave | Service Bridge | Maintenance | outrigger problem | outrigger 1 had a power failure, bridge
was removed power restored and outrigger
parked, outrigger will be looked at once |
|
24
|
Monday, September 30, 2013, 14:02 |
Travis Cave | Service Bridge | Maintenance | new festooning | The festooning and bearings for the festooning
cars for both outriggers has been replaced
and it is in working order. |
|
139
|
Monday, March 21, 2022, 13:14 |
Adam Newsome | Trolley | Repair | Video Trolley Mk 1 - Radial Limit Switch Replacement | An issue was observed in which radial motion
on the Video Trolley Mk 1 did not respond
to commands. After troubleshooting, it was |
|
4
|
Friday, February 17, 2012, 15:07 |
Don Jackson | Trolley | Repair | Video Trolley Failed in Cyclotron Tank | All control to the video trolley was lost
during remote photographing of components
in the cyclotron. The control system and |
|
147
|
Friday, January 27, 2023, 12:12 |
Adam Newsome | Infrastructure | Development | Vault crane - inspection, remote pendant installation | The vault crane annual inspection was completed
by Tom Kauss.
|
|
131
|
Thursday, April 01, 2021, 13:47 |
Adam Newsome | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door has been closed and
seal inflated. The operation was performed
with no issue. |
|
144
|
Tuesday, May 10, 2022, 11:31 |
Nadia Jorgenson | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door
has been closed and seal inflated. The operation |
|
153
|
Wednesday, April 26, 2023, 11:19 |
Adam Newsome | Cyclotron | Standard Operation | Vault Shield Door Closed | The vault shield door has been closed and
seal inflated. The operation was performed
with no issue. |
|
119
|
Wednesday, February 05, 2020, 15:04 |
Adam Newsome | Trolley | Repair | Upper resonator trolley: cylinders for Ex 2C tasks | [B]Cylinder 4[/B] on the upper resonator trolley
was not fully functional when removing Ex
2C during 2020 shutdown. It worked occasionally. |
|
135
|
Tuesday, August 31, 2021, 14:28 |
Adam Newsome | Trolleys serviced | Development | Upper Resonator Trolley - Finger Cylinders Replaced | The two support fingers on the upper resonator
trolley were bent due to excessive loading
during cylinder toggling. |
|
180
|
Monday, June 03, 2024, 14:29 |
Riley Sykes | Trolleys serviced | Maintenance | Upper Resonator Trolley | 24 Month, 60 month
service completed. Bearings for drive motor |
|