  84   Friday, April 17, 2015, 15:11 Keith C NgM9Developmentm9 t2 alignment jobToday: Restored filler shielding in T2
M9 Q1Q2 hole.
- Blocks marked with beam direction
 6x 
  94   Monday, January 30, 2017, 12:01 Keith C NgM9DevelopmentT2 leak check with vac groupWeek
of Jan 23 to 27:
 
  
  95   Wednesday, February 01, 2017, 15:34 Keith C NgM9DevelopmentT2 M9 SetupFinished setting up work area around T2
M9 front end.
 
 t2m920170201_143714_1032.jpg 
  96   Friday, February 03, 2017, 14:57 Keith C NgM9DevelopmentRemoving shield blocks and leak check results.Removed temporary shielding blocks from
M9 hole and placed in temporary bunker. Capped
with 18' shielding block. Blank off ready
 t2m920170203_140114_0604.jpgt2m920170203_120314_0686.jpgLocal_leak_check_Jan_27_2017.pdf 
  97   Tuesday, February 07, 2017, 15:36 Keith C NgM9Developmentt2 m9 job - Removed blank off from t2 m9 port,
had to pry off with screw driver via spring
ears. Clean removal it seems.
 20170207_rh_shutdown_log.pdf 
  98   Thursday, February 09, 2017, 16:14 Keith C NgM9Developmentt2 m9 alignmentPrepared m9 and b1 flanges for accepting
their target jigs. The target jigs need to
be reset by alignment group, 15" was
 20170209_t2m9alignment_P1030588.JPG20170209_t2m9alignment_P1030586.JPG 
  99   Friday, February 10, 2017, 15:53 Keith C NgM9Developmentt2 m9 jobInstalled all jigs and Alignment group
did their shoots successfully. Used individual
pins on the 15" target jig and worked
 20170210_t2m9alignment_P1030604.JPG 
  100   Tuesday, February 14, 2017, 16:08 Keith C NgM9DevelopmentT2 M9 2015 vs 2017 comparisonAttached a quick comparison of M9 exit
port flanges WRT indium remnants: looks roughly
the same. Will attempt to install blanking
 20170214_t2m9alignmentflangecomparison.pdf 
  101   Wednesday, February 15, 2017, 15:36 Keith C NgM9Developmentt2 m9 blank offInstalled the blank off on the T2
M9 exit port:
 20170215_shutdown_log_photos.pdf 
  102   Friday, February 17, 2017, 13:33 Keith C NgM9DevelopmentT2 M9 vacuumLeak checked the blank off at T2 M9 exit
port with Dimo Y. and Edi D.V. (Vac Group)
and they confirm it is leak tight. Blank
  
  103   Monday, February 20, 2017, 15:58 Keith C NgM9Developmentt2 m9 job wrap upRestored shielding to T2 M9 void, blocks
seem more crooked compared to previous years.
 20170220_t2m9alignment_P1030616.JPG20170220_t2m9alignment_P1030621.JPG 
  112   Tuesday, March 13, 2018, 15:36 Keith C NgM9Standard Operationm9 alignment workSet up shielding canyon for M9 laser tracker
job.
 dms.jpg 
  113   Thursday, March 15, 2018, 15:48 Keith C NgM9Maintenancem9 t2 alignment jobBlank off removed this morning, video recorded
the T2 flange,B1 flange and B1 vacuum box
interior. Blank off is 150 uSv/h @ .5m, 3
  
  114   Friday, March 16, 2018, 13:39 Keith C NgM9Maintenancet2 m9 port inspectionVideo imaged T2 port post blank off removal,
looks roughly the same as last year. Knife
edge looks clean.
 2018_t2m9flangeinspection2.jpg2017_t2m9flangeinspection.jpg 
  115   Wednesday, March 21, 2018, 15:22 Keith C NgM9Repairt2 m9 laser tracker jigsInstalled the remaining laser tracker jigs
for beam lines. No issues. Made sure 8"
target the mounting poles did not interfere
 20180321_t2m9_P1030966.JPG20180321_t2m9_P1030967.JPG20180321_t2m9_P1030968.JPG 
  116   Monday, March 26, 2018, 15:57 Keith C NgM9Maintenancet2 m9 laser tracker alignmentRemoved all Leica tracker targets from
M9 pit, I will proceed with blanking off
T2 exit port sometime this week. Alignment
  
  117   Tuesday, March 27, 2018, 15:08 Keith C NgM9Standard Operationt2 m9 port blank off1.
Blank off installed 11:40      with Dan McDonald,
east spring ear looks 'deeper" than
 20180327_t2m9_P1030978.JPG20180327_t2m9_P1030979.JPG 
  118   Thursday, March 29, 2018, 15:15 Keith C NgM9Maintenancet2 m9 port blank offToday leak checked the M9 exit port with
Edi and we found no leaks. The usual delayed
helium response in the M20/Collimator B/
  
  121   Tuesday, June 11, 2019, 14:56 Keith C NgM9DevelopmentM9 B1 seal notes from 1988 Found original installation notes
for the initial installation of M9 Q1Q2 generation
2 in 1988.
 m9_b1_seal_deans_notes_page_1.pdfM9_B1_seal_Deans_Notes_Page_2.pdf 
  124   Monday, February 24, 2020, 15:13 Keith C NgM9Repairm9 q1q2 repair laser tracker shootBeamlines
shot the position of the M9 T2 port and B1
flange for setting the M9 test stand flanges
 20200224_m9project_P1040686.JPG20200224_m9project_P1040688.JPG 