Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 114     Entry time: Friday, March 16, 2018, 13:39
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: t2 m9 port inspection 

Video imaged T2 port post blank off removal, looks roughly the same as last year. Knife edge looks clean.

Attached composite photo of flange face, ring is a stand off to maintain focus distance to camera. Also attached partial composite image of 2017 video inspection.

Attachment 1: 2018_t2m9flangeinspection2.jpg  3.464 MB  | Show | Hide all
Attachment 2: 2017_t2m9flangeinspection.jpg  1.664 MB  | Show | Hide all
ELOG V2.9.2-2455