Message ID: 118     Entry time: Thursday, March 29, 2018, 15:15
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: t2 m9 port blank off 

Today leak checked the M9 exit port with Edi and we found no leaks. The usual delayed helium response in the M20/Collimator B/ M8(?) area is still persistent, however Edi says the vacuum level at T2 is the same as before.

Shielding should be restored next week.

 