Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 116     Entry time: Monday, March 26, 2018, 15:57
Author: Keith C Ng 
Category: M9 
Type: Maintenance 
Subject: t2 m9 laser tracker alignment 

Removed all Leica tracker targets from M9 pit, I will proceed with blanking off T2 exit port sometime this week. Alignment group has taken possession of their laser equipment and the target jigs.

ELOG V2.9.2-2455