1
|
Thursday, June 30, 2011, 16:58 |
John Wong | Primary Beamlines | Repair | blah blah blah | dfdfdfdfdf |
|
6
|
Thursday, March 01, 2012, 16:01 |
Keith C Ng | Primary Beamlines | Repair | 2C Rad Hard Valve Replacement | 4" indium flanges at the 2C rad hard
valve were cleaned of the remaining indium
by C. Ballard. Both upstream and down stream |
|
19
|
Friday, January 11, 2013, 15:44 |
Keith C Ng | Primary Beamlines | Maintenance | 1AVA8 valve o ring replacement | Assisted vacuum group with removing 1AVA8:
- uncovered valve area and set up
remote handling bridge over valve. |
|
20
|
Monday, January 14, 2013, 16:36 |
Keith C Ng | Primary Beamlines | Maintenance | 1AVA8 valve o ring replacement | continued with o ring replacement, replaced
all relevant o ring seals on valve (valve
body seal and actuator arm dynamic seals). |
|
21
|
Tuesday, January 15, 2013, 16:37 |
Keith C Ng | Primary Beamlines | Maintenance | 1AVA8 valve o ring replacement | Job completed today and shielding block
over valve restored.
- He leak checked valve and accessible |
|
22
|
Wednesday, January 16, 2013, 17:03 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair | Moved 18' blocks away from triplet area
in preparation for uncovering triplet. Plastic
laid down up stream of t2 target station |
|
23
|
Friday, January 18, 2013, 14:40 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair | Completed uncovering
shielding and RH setup over 1A Q14 triplet
area, see photo for RH setup. |
|
24
|
Tuesday, January 22, 2013, 16:02 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair | 1.5 day work delay due to plant group unavailable
on the 21st of January. Gardner air compressor
was being moved. |
|
25
|
Wednesday, January 23, 2013, 15:51 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Continued work on finding ground fault
in 1A triplet magnets;
|
|
26
|
Thursday, January 24, 2013, 17:05 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Continued with work on finding ground fault
on 1A triplet;
|
|
27
|
Friday, January 25, 2013, 15:15 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Today: Uncovered 1A triplet cable chase
and reconfigured shielding. D. Preddy will
continue with diagnosing ground fault on |
|
28
|
Monday, January 28, 2013, 16:28 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Rad survey map from last Friday (25 January)
here.
|
6x |
29
|
Tuesday, January 29, 2013, 16:28 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Restored shielding over 1A triplet chase.
Uncovered Q16 and set up RH bridge |
|
30
|
Wednesday, January 30, 2013, 16:46 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Cut and removed asymmetric steering cables
from Q14 and 16, cables are no longer resting
on magnet power bus bars. |
|
31
|
Friday, February 01, 2013, 14:15 |
Keith C Ng | Primary Beamlines | Maintenance | M9 Q1 Q2; storage pit assessment | Uncovered radioactive waste storage pit
to see contents. Assessing viability of moving
contents inside to facilitate storage of |
|
32
|
Monday, February 04, 2013, 16:04 |
Keith C Ng | Primary Beamlines | Repair | 1A triplet repair (ground fault) | Restored 1A triplet shielding and removed
RH shielding.
|
|
33
|
Tuesday, February 05, 2013, 16:12 |
Keith C Ng | Primary Beamlines | Maintenance | 1A triplet repair (ground fault) (Completed) | Today: D. Preddy completed another power
test on 1A Q14, 15, 16 after all iron/steel
shielding was restored. Magnet power and |
|
34
|
Wednesday, February 06, 2013, 16:33 |
Keith C Ng | Primary Beamlines | Maintenance | t2 monolith measurements | Beam lines took measurements of top of
T2 using Leica Total Station. Required no
crane activities over 1A blocks. |
|
52
|
Wednesday, March 20, 2013, 08:59 |
Keith C Ng | Primary Beamlines | Development | T2 M9 off beamline activities | Yesterday:
Did vacuum testing on MK2 8"
indium blank off; installed w/indium on test |
|
57
|
Thursday, December 12, 2013, 14:21 |
Keith C Ng | Primary Beamlines | Repair | T2 suck tube active/contaminated water removal | Removed "suck tube" filled with
active/contaminated water from top of 1A
beam line blocks to meson extension hall |
|