1.5 day work delay due to plant group unavailable on the 21st of January. Gardner air compressor was being moved.
Today:
- Moved bridge off 1AQ14, cleaned and relocated.
- Uncovered 1AQ15, set up bridge over magnets, downstream of 1AQ15. Completed at 14:15.

Radiation survey map here: BL1A Q14 Q15 Uncovered
- Two magnets exposed, fields are higher (1200 uSv/h vs 600 uSv/h). Cover plate still on 1AQ15, see photo.
- Waiting for D. Preddy to complete work.
|