Message ID: 20     Entry time: Monday, January 14, 2013, 16:36
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Maintenance 
Subject: 1AVA8 valve o ring replacement 

continued with o ring replacement, replaced all relevant o ring seals on valve (valve body seal and actuator arm dynamic seals).

- valve re installed and services reconnected.

- valve cycled and checked; valve, limit switches ok.

- started T1 roughing pump at 15:25, will pump over night.

- RH setup and tools still on beam line, valve area not yet covered.