Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 57     Entry time: Thursday, December 12, 2013, 14:21
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Repair 
Subject: T2 suck tube active/contaminated water removal 

Removed "suck tube" filled with active/contaminated water from top of 1A beam line blocks to meson extension hall warm cell lab. Highest activity recorded was measured at 22mSv on contact, 2000µSv @ 1/2 m. Tube was bagged and craned over to warm cell lab for temporary storage and will be dealt with at a later date. See work permit 2013-12-12-2 for more details.

ELOG V2.9.2-2455