Completed uncovering shielding and RH setup over 1A Q14 triplet area, see photo for RH setup.

- D. Preddy disconnected coil #1 thermocouple on Q14 in an attempt to clear ground fault, fault still present.
- Moved three asymmetric steering magnet cables to see if ground fault cleared, no effect.
- D. Preddy will contact D. Louie for power supply issues, will contact RH when job complete.
Radiation survey map here: Jan 18 1A Triplet Area
|