Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 22     Entry time: Wednesday, January 16, 2013, 17:03
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Repair 
Subject: 1A triplet repair 

Moved 18' blocks away from triplet area in preparation for uncovering triplet. Plastic laid down up stream of t2 target station for short term storage of 6' layered blocks.

ELOG V2.9.2-2455