Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 19     Entry time: Friday, January 11, 2013, 15:44
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Maintenance 
Subject: 1AVA8 valve o ring replacement 

Assisted vacuum group with removing 1AVA8:

- uncovered valve area and set up remote handling bridge over valve.

- shut off pneumatic supply to valve to render valve in mid position (shut off valve in 1A tunnel). disconnected electrical services and air supply for valve.

- undid the two captive RH bolts holding top half of valve body. valve body was then removed and bagged. note that gate assembly is free of valve body, body is light enough to lift out by hand.

- valve swiped, 300 to 700 CPM found on removed portion of valve. level inside valve at beam line was 6 mSv. fields at bridge not higher than 400 uSv, see survey map.

work will be continued by vacuum group.

 

ELOG V2.9.2-2455