Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-Beamlines  Not logged in ELOG logo
Message ID: 6     Entry time: Thursday, March 01, 2012, 16:01
Author: Keith C Ng 
Category: Primary Beamlines 
Type: Repair 
Subject: 2C Rad Hard Valve Replacement 

4" indium flanges at the 2C rad hard valve were cleaned of the remaining indium by C. Ballard. Both upstream and down stream flanges were done, ready for installation of new valve.

ELOG V2.9.2-2455