  Lab Maintenance, all entries  Not logged in ELOG logo
IDdown Date Author Status Test Subject Text Attachments
  64   Monday, December 16, 2024, 12:15 Aaron SchmidtCompleted Q4 - 2024 Ball Mill Calibration & Inspection  Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2024_Ball_Mill_Calibration&_Inspection.png 
  63   Thursday, November 21, 2024, 11:48 Aaron Schmidt  Change glove on Ar Glove box (2) Thursday, November 21, 2024, 11:46:
2 Glovebox gloves were changed. The far right
glove & the far left glove. 
  
  62   Tuesday, October 15, 2024, 09:21 Darwin Ortiz RosalesFixed Hotlab glovebox catalyst regenerationTuesday, October 15, 2024, 09:22 
The glovebox catalyst was regenerated. 
No issues.  Removed TCE and PVB from
  
  61   Thursday, August 01, 2024, 15:03 Darwin Ortiz Rosales   Ultrasonicator in Cold Lab:  The ultrasonicator
cooling lines and their operation was checked. 
The functionality of the probe and operation
  
  60   Thursday, August 01, 2024, 15:01 Darwin Ortiz Rosales  EVAP1 and EVAP2 Inspection and MaintenanceThursday, August 01, 2024, 14:56
EVAP1:  Checked seal and no
visible deterioration was observed. 
  
  59   Thursday, July 11, 2024, 13:40 Aaron Schmidt  Q2 - 2024 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q2_-2024_Ball_Mill_Calibration_&_inspection.jfifQ2_-_2024_Clean_up.jfif 
  58   Thursday, June 20, 2024, 13:33 Darwin Ortiz RosalesFixed Glovebox inspection ISAC1 B1 L06 Thursday, June 20, 2024, 13:28
All lines, pump, blower, were
  
  57   Monday, April 15, 2024, 10:52 Aaron SchmidtFixed Ar Glove box RP swapped. Monday, April 15, 2024, 10:50: The
old IDP15 RP was not pumping the antechamber
down properly. An exchange IDP15 pump is
  
  56   Wednesday, March 27, 2024, 13:42 Keyur Chauhan  Actinide Mass Balance Calibration ISAC-I B1 Hot Lab ISAC-1
B1 Hot Lab actinide mass balance calibration
 Actinide_Mass_Balance_-_27_Mar_2024.pdf 
  55   Tuesday, March 12, 2024, 15:21 Darwin Ortiz RosalesFixed Glovebox regeneration and O2 sensor replacement(B1 L06, Hotlab)Tuesday, March 12, 2024, 15:21
Hotlab ISAC1 B1 


Normal
0
  
  54   Friday, February 09, 2024, 11:01 Aaron Schmidt  Laser cutter inspection Friday, February 09, 2024, 11:01:
Epilog laser cutter operates. OK
  
  53   Friday, January 19, 2024, 10:20 Darwin Ortiz RosalesFixed Glovebox regeneration (B1 L06, Hotlab)Friday, January 19, 2024, 10:19 
This is a belated entry.  The
regeneration was performed successfully on
  
  52   Friday, January 19, 2024, 10:18 Darwin Ortiz RosalesFixed Inspection of Glovebox inside B1 L06 (hotlab)Friday, January 19, 2024, 10:10 
This is a belated entry.  The
inspection was performed on December 19,
  
  51   Tuesday, December 12, 2023, 13:12 Aaron Schmidt  Q4 - 2023 Ball Mill Calibration & Inspection    Fritsch   
  50   Thursday, November 30, 2023, 10:03 Aaron SchmidtFixed Ar Glove box - Blower / solenoid fix On November 10th / 11th a site wide
power outage occured. Once power was restored,
the Ar glove box had intermittent issues
  
  49   Tuesday, August 01, 2023, 12:31 Darwin Ortiz Rosales  Evap1 and Evap2 Inspection and MaintenanceEvap1:  Cleaned and checked seals. 
Oil level could not be clearly determined,
but are consulting with pump group to check.
  
  48   Friday, June 30, 2023, 12:21 Aaron Schmidt  Q2 - 2023 Ball Mill Calibration & Inspection   Fritsch  Q2_-_2023_Ball_Mill_Calibration_&_Inspection.png 
  47   Tuesday, June 20, 2023, 15:11 Darwin Ortiz RosalesFixed Inspection ISAC 1 B1 L06 GloveboxOn Monday June 19th, the Glove box was
inspected.  Gas lines, solenoids, pump,
argon usage, state of gloves and gas levels
  
  46   Tuesday, April 18, 2023, 17:40 Keyur ChauhanFixed1Actinide Mass Balance CalibrationISAC-1 B1 Hot Lab
actinide mass balance calibration was carried
out on April 18, 2023, at 10:40 a.m. with
 Actinide_Mass_Balance_-_18_Apr_2023.pdf 
  45   Thursday, February 02, 2023, 10:30 Aaron Schmidt  Eyewash & Shower Station OK Thursday, February 02, 2023, 10:14:
Cold Lab Eyewash & shower station ran.
Ok.
  
  44   Friday, December 16, 2022, 07:36 Aaron Schmidt  Q4 - 2022 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2022_Ball_Mill_Calibration&_Inspection.png 
  43   Tuesday, July 12, 2022, 11:08 Aaron Schmidt  Q2 - 2022 Ball Mill Calibration & Inspection Fritsch
Pulverisette 5 Ball Mill status:
 20220712_110411.jpg 
  42   Thursday, April 07, 2022, 12:21 Aaron SchmidtFixed Ar glove box roughing pump.Thursday, April 07, 2022, 12:00: While
preparing to remove LaC, the roughing pump
(1) stopped operating. It didn't appear to
  
  41   Thursday, April 07, 2022, 12:00 Aaron SchmidtUnder Process Ar Glove box issue & LaC removal. Thursday, April 07, 2022, 11:55:
It was noticed on Wednesday that
the glove box was not regulating pressure
  
  40   Thursday, January 20, 2022, 13:38 Carla Babcock  Testing of spare FUG bias supplyTomislav and John Chow tested the spare
bias supply located in the rack of the electrical
services room. This is a FUG HCN 1400 M-60000,
  
  39   Tuesday, December 07, 2021, 09:23 Aaron Schmidt  Q4 - 2021 Ball Mill Calibration & Inspection  Tuesday, December 07, 2021, 09:23:
SN 05.6010 / 03005: Inspected.
 Q4_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  38   Tuesday, August 03, 2021, 10:34 Aaron Schmidt  Q2 - 2021 Ball Mill Calibration & Inspection      Q2_-_2021_Ball_Mill_Calibration_&_Inspection.pdf 
  37   Tuesday, February 09, 2021, 06:56 Aaron Schmidt  Planned power outage.Tuesday, February 09, 2021, 06:53: Evaporator
2 off. Evaporator 1 ok, Fume hoods ok. Ar
glove box off. Ready for planned power outage.
  
  36   Friday, December 04, 2020, 12:58 Aaron Schmidt  Q4 - 2020 Ball Mill Calibration & Inspection     Q4_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  35   Wednesday, September 16, 2020, 10:42 Aaron Schmidt  Ball Mill troubleshoot. Odd noises reported. Darwin &
Marla. "Like a rock caught in a
fan"
  
  34   Wednesday, August 05, 2020, 19:50 Darwin Ortiz RosalesFixed1Hot Lab Glove Box RegenerationWednesday, August 05, 2020, 19:34
On Friday July 31 a regeneration
of the glovebox was started.
  
  33   Monday, July 13, 2020, 11:23 Aaron Schmidt  Q2 - 2020 Ball mill inspection  Fritsch  Q2_-_2020_Ball_Mill_Calibration_&_Inspection.pdf 
  32   Monday, July 13, 2020, 11:07 Aaron Schmidt  Eye wash temp Temp was noted to be high @ 50 deg
C.
Adjusted the regulators to 35 deg
  
  31   Friday, April 24, 2020, 16:27 Anders Mjos  Lab check in


   
        
            
 20200422_154045506_iOS.jpg 
  30   Wednesday, April 08, 2020, 11:40 Anders Mjos  Lab check inChecked in on the labs and other equipment
yesterday. Everything looks ok, including
the glove box Ar supply. Recorded O2 and
  
  29   Monday, January 13, 2020, 13:27 Aaron SchmidtUnder Process Leaking pipe in HC area Monday, January 13, 2020, 10:30:
Leak noted in HC area by Chad to ISAC Ops.
 
 Leak_location.jpg20200113_113443.jpg20200113_120206.jpg 
  28   Wednesday, December 18, 2019, 13:50 Aaron Schmidt  Q4-2019 Ball Mill calibration & inspection Fritsch Pulverisette
5 Ball Mill status:
 Q4_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  27   Friday, September 27, 2019, 13:55 Aaron Schmidt  DI water supply leak outside room 06 - ISAC B1 Friday, September 27, 2019, 13:54: 
There is a pin hole water leak coming
from the DIW supply pipe going into the ISAC
 ISAC_B1_leak_-_1.jpegISAC_B1_leak_-_2.jpegISAC_B1_leak_-_4.jpegISAC_B1_leak_-_5.jpg 
  26   Friday, July 26, 2019, 13:06 Aaron Schmidt  Q2 - 2019 Ball Mill Calibration & Inspection Fritsch Pulverisette
5 Ball Mill status:
SN 05.6010 / 03005: Inspected July
 Q2_-_2019_Ball_Mill_Calibration_&_Inspection.pdf 
  25   Wednesday, April 24, 2019, 10:19 Aaron SchmidtFixed Cold Lab back sink leak 
 Wednesday, April 24, 2019,
10:00:
  
  24   Thursday, March 21, 2019, 07:43 Aaron Schmidt  Argon Glove box repair & link to nuclear ventilationThe Ar glove box issues ( https://elog.triumf.ca/TIS/General/23
) have been fixed.
Quoted from work permit: 
 6x 
  23   Thursday, February 07, 2019, 10:42 Aaron Schmidt  Argon Glove box leak / regeneration failure 
A regeneration of the Ar Glove box
had been performed Monday, 04, Feb, 2019.
 7x 
  22   Monday, April 09, 2018, 15:59 Laura LambertFixed Glove box leak in hot lab Friday, April 06, 2018, 16:21
Over the long weekend ~1000psi was
used up, indicating a leak somewhere in the
 GetImage.jpgGetImage_(1).jpgGetImage_(2).jpgGetImage_(3).jpg 
  21   Wednesday, January 31, 2018, 13:35 Laura Lambert  New lab safety mirrors installed in hot lab Wednesday, January 31, 2018, 13:31
3 x lab safety mirrors have been
installed in the hot lab, now all locations
 IMG_0237.JPGIMG_0239.JPG 
  20   Tuesday, January 23, 2018, 11:58 Laura Lambert  All BeO removed from Labs! Tuesday, January 23, 2018, 11:55
Portable glove box with everything
inside, contaminated beakers, pellets and
  
  19   Wednesday, December 20, 2017, 09:16 Laura Lambert  RETURN and SUPPLY valves CLOSED for xmas break for both evap1 and evap2 Wednesday, December 20, 2017, 09:02
Replaced Argon tank
  
  18   Tuesday, August 08, 2017, 14:55 Laura Lambert  Glove box Alarm Tuesday, August 08, 2017, 14:28
Alarm for glove box went off this
afternoon.
  
  17   Thursday, July 13, 2017, 15:12 Laura LambertUnder Process D.H.W leak in SEM lab Thursday, July 13, 2017, 14:53
Same pipe that had a leak in the
cold lab ~1 month ago now has leak in SEM
 IMG_1713.JPGIMG_1715.JPGIMG_1716.JPGIMG_1719.JPG 
  16   Wednesday, April 05, 2017, 08:22 Aaron SchmidtFixed D.H.W.R LeakWhen: 04/04/17 Between 09:00 & 11:30
Where:
ISAC 1 – Cold Lab
Who: Ron Murray & Aaron
Schmidt
A pin hole leak was found in the
  
  15   Thursday, March 16, 2017, 09:32 Aaron SchmidtFixed D.H.W water pipe replacementFri 03/03/2017 17:00  - A water leak was noticed
on the D.H.W line. Hot water to the Cold
lab was shut down.

Wed 15/03/17 11:00
 DHW_pipe_replacement.docx 
  14   Wednesday, November 26, 2014, 14:01 Laura Lambert       
  13   Friday, March 15, 2013, 13:55 Anders Mjos  Non active water off for a short time (10 - 15 min)ISAC operations called to check that equipment
in the labs were OK for the non active water
to be off for a short time. I gave the OK
  
  12   Tuesday, February 28, 2012, 12:01 John Wong  TIS/RH UsersTuesday, February 28, 2012, 11:31
Hi All,
Hope you all find the TIS/RH elog
  
  11   Thursday, February 23, 2012, 13:38 Anders MjosFixed Water leak in chemistry / cold lab Please see attached file for notes
on the water leak from the cold lab fume
hood Tuesday Feb 21.
 Notes_on_water_leak_ISAC_I.docx 
  10   Thursday, September 08, 2011, 15:41 Anders MjosFixed1Evaporator#1 glovebox repairing

    

       
            
  
  9   Friday, August 19, 2011, 10:04 John WongUnder Process1Evaporator#1 glovebox repairingThe evaporator#1 glovebox is leaking from
the gloves, around the ports, and the base
(possible more places).  It is evident
  
  8   Tuesday, July 19, 2011, 16:26 John WongFixed Planetary Ball Mill moved to Hotlab Tuesday, July 19, 2011, 16:22:  The
planetary ball mill was in the coldlab, and
now it has moved to the hot lab for the purpose
 Screen_shot_2011-07-19_at_4.21.04_PM.png 
  7   Friday, June 24, 2011, 18:00 John WongUnder Process TIS New Users Hi All,
As requested by Pierrer Bricault,
 I have added the following users to
 elog_demo.png 
  6   Tuesday, June 21, 2011, 16:38 John WongFixed Planetary Ball Mill Re-Commisioning Tue Jun 21 16:30:48 2011: 
Re-Cap:  On June 13, 2011, the
milling jar gasket seal partially came out
  
  5   Friday, May 13, 2011, 11:59 John WongFixed Uranium Waste Container Removed from HotlabFri May 13 11:55:37 2011:  The contain
in the uranium waste container was removed
and transferred into a beaker and sealed. 
  
  4   Wednesday, April 13, 2011, 13:54 John Wong  Cloth booties now avaiable for hotlabWed Apr 13 13:53:46 2011

I've setup a box of cloth booties
for entering the hotlab.  They are
washable
  
  3   Tuesday, April 12, 2011, 12:07 John Wong  All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered down

    

       
            
  
  2   Tuesday, April 12, 2011, 12:03 John Wong  Hot Lab Glove Box Regeneration Tue Apr 12 12:00:52 2011:  The hot
lab glove box regeneration was started yesterday
(April 11, 2011).  "Before regeneration,
  
  1   Wednesday, March 30, 2011, 16:47 John Wong  All Fumehood pumps in hot and cold labs tripped off due to MCC-X powered downAll the fumehood pumps in the ISAC-I hot
and cold labs got tripped off when the MCC-X
was powered down (See ISAC WP#2011-03-30-5).
  