  ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  670   Thursday, June 21, 2018, 16:32 Anders Mjos LP-FEBIAD  41790-942752-5In progressHeating targetThursday, June 21, 2018, 16:30: Short between
ANODE and EE. Do not use until repaired.
Thursday, June 21, 2018, 16:32: Ramping
 TS-2018-06-19-10-30.rgaTS_Source_tray_2018_-_Check_2.docx 
  672   Monday, July 09, 2018, 10:44 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressCoil Test July Monday, July 09, 2018, 10:43: Rouging.
Monday, July 09, 2018, 13:14: Turbo
pumps on.
  
  673   Thursday, July 12, 2018, 08:24 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressPower outage / restartPower outage (07/11/2018 @ approx 21:53)
shut down the test stand.
  
  674   Thursday, July 12, 2018, 10:11 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressCoil Test #5 *** REVIEW Elog entry #673 Power
outage & restart ***
Thursday, July 12, 2018, 10:10: Opened
  
  687   Tuesday, October 02, 2018, 13:39 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps w/ stoppageSilver bolts used on Coil, TGHT, &
TBHT.
End caps in target
 FEBIAD_Coil_Test_6_-_POS_Cathode.docxTS-2018-10-11-10-37.rga 
  688   Monday, October 15, 2018, 14:23 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps Anode / Cathode BIAS PS polarity reversed
by John Chow. PS: Negative
Monday, October 15, 2018, 14:12:
 FEBIAD_Coil_Test_6-2_-_Neg_Cathode.docxTS-2018-10-15-14-15.rga 
  691   Monday, October 22, 2018, 11:07 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps Restarted post power outage.
Water & Turbos on.
Monday, October 22, 2018, 10:55:
 epics-plot-whiteout-181028_1322.PNGepics-whiteout-181028_1322.PNGFEBIAD_COIL_Test_6-3_Caps_in.docxTS-2018-10-22-09-47.rga 
  692   Monday, October 29, 2018, 10:56 Aaron Schmidt LP-FEBIAD  41790-942752-5Problems/SolutionsTS communications issues.Sometime around 00:30 Sunday, October 28,
2018, the ISAC test stand lost communication
to the PLC and shut down abruptly.
  
  693   Monday, October 29, 2018, 11:03 Aaron Schmidt LP-FEBIAD  41790-942752-5DoneTest FEBIAD w/ Silver bolts & sealed end capsRestarting FEBIAD
Monday, October 29, 2018, 10:56:
Restart roughing & Turbo pumps.
  
  760   Friday, September 27, 2019, 11:54 Aaron Schmidt LP-SIS  41790-943515-6 Conditioning UC#(29) HSUsing broken LP-FEBIAD oven. TBHT off.
Friday, September 27, 2019, 11:53:
Roughing.
  
  761   Wednesday, October 02, 2019, 13:42 Aaron Schmidt LP-SIS  41790-943515-9In progressConditioning UC#(30) HSWednesday, October 02, 2019, 13:42: Roughing.
Wednesday, October 02, 2019, 14:13:
Turbo Pumps started.
 UC#30.docx 
  769   Friday, November 01, 2019, 16:01 Fernando Maldonado LP-SIS  41790-9 43515-9 In progressPeek seal tests on UCx#30 HSFriday, November 01, 2019, 15:47: A symbiotic 
peek seal assembly  was installed on
the manipulator grip to verify the temperature
 UC#30-plus-peak-seal.docxTS-2019-11-01-16-22.rgaTS-2019-11-04-16-12.rgaTS-2019-11-05-08-30.rga 
  770   Friday, November 08, 2019, 14:21 Aaron Schmidt LP-SIS  41790-943515-9In progressNitrogen Bottle leak testFriday, November 01, 2019, 14:00: Nitrogen
bottle installed. Purged waterlines HS /
FS#5. Purge done in conjunction with SiC#38
  
  784   Wednesday, February 12, 2020, 11:04 Aaron Schmidt LP-SIS  41790-943515-1In progressConditioning HSUsing a broken LP-FEBIAD oven for out gassing.
Tentative UC#31*
Wednesday, February 12, 2020, 10:57:
 UC#31.docx 
  800   Monday, July 13, 2020, 14:52 Aaron Schmidt LP-FEBIAD  41790-943515-2 UCx HS conditioning. Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo
  
  547   Tuesday, October 18, 2016, 13:29 Aaron SchmidtTa#50LP-SISITETM441790-541751-1In progressConditioning Ta#50Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started.
 9x 
  574   Friday, March 24, 2017, 14:43 Aaron SchmidtTa#51LP-SISITWTM241790-441751-5In progressConditioning Ta#51Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on.
 9x 
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  503   Wednesday, April 13, 2016, 13:03 Aaron Schmidt LP-SIS  41790-239956-8 Testing restraint insulator prototype (2)Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34:
 Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx 
  885   Thursday, July 22, 2021, 17:43 Fernando Maldonado LP-FEBIAD  41790-1044378-5FailedFEBIAD efficiency measurements Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos
  