  Test-Stand, Page 5 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Source Station Module Target Oven W.O#down Heat Shield W.O# Status Subject Text Attachments
  795   Tuesday, June 16, 2020, 11:03 Aaron SchmidtTa#60LP-SISITWTM244139-1343515-5In progressConditioning Ta#60 Tuesday, June 16, 2020, 11:01: Turbo pumps
on.

Wednesday, June 17, 2020,
 Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt 
  843   Monday, February 01, 2021, 08:38 Fernando Maldonado LP-SIS  44139-10 44378-2 FailedEnergy spread calibrationMonday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the  amount of dispersion at the
 ESC_-_Jan_29_start.docxESC_-__Feb_3_start.docxER-580-230-30kV-m7.txtEr-580-230-30kV-m133.txt 
  804   Tuesday, August 04, 2020, 15:07 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assembly Tuesday, August 04, 2020, 15:04:
Roughing.

Wednesday, August 05, 2020,
 UCx_-_HS_w-PEEK_Assy_-_43515-4.docx 
  806   Tuesday, August 11, 2020, 12:04 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assemblyHS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked.
  
  840   Thursday, January 21, 2021, 10:10 Fernando Maldonado LP-SIS  44139-1044378-2DoneEnergy spread calibration - SIS with TBHT negatively biased Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion 
Source, or ANBOSIS (still working on the
  
  842   Friday, January 29, 2021, 09:13 Aaron Schmidt LP-SIS  44139-1044378-2In progressTS settings ok.Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good.
  
  844   Thursday, February 04, 2021, 18:48 Fernando Maldonado LP-SIS  44139-10 44378-2 Problems/SolutionsEnergy spread calibration with SISThe system was vented to  make clearance
on the waterlines as a very small continuous
discharge was observed.
 6x 
  846   Monday, February 08, 2021, 09:20 Aaron Schmidt LP-SIS  44139-1044378-2FailedEnergy spread calibration with SIS. No PERe-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing.
 ESC_-_Feb_8_Start.docx 
  876   Monday, June 07, 2021, 13:45 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressTa#62 ConditioningMonday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?)
 Ta#62_Conditioning_-_1.docx 
  879   Wednesday, June 09, 2021, 14:31 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressInstall MB1 window & 9 pin for V test.Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing.
 Ta#62_voltage_tests.docx 
  880   Monday, June 21, 2021, 11:53 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4FailedTa#62 Conditioning - 2Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing
 Ta#62_Conditioning_-_2.docx 
  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assemblyConditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only).
  
  758   Monday, September 23, 2019, 13:30 Aaron SchmidtTa#59LP-SISITETM244062-542752-10In progressConditioning Ta#59 AssyMonday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open
 9x 
  959   Thursday, February 02, 2023, 12:44 Aaron Schmidt LP-SIS  44062-1-SK 45235-1In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41:
  
  958   Tuesday, January 31, 2023, 10:42 Aaron Schmidt LP-SIS  44062-1-SK45235-7In progressConditioning UC#x assemblySK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39:
  
  949   Tuesday, December 06, 2022, 11:20 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD TestsThermocouples installed:
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_1.docxITS_FEBIAD_measurements_12-2022_Test_1.xlsx 
  950   Tuesday, December 13, 2022, 16:12 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 2Thermocouples installed (X):
O - O
O - Anode
 Re-routed_Anode_FEBIAD_12-2022_Test_2.docx 
  951   Friday, December 16, 2022, 10:32 Aaron Schmidt HP-FEBIAD-CTL  43104-245235-12In progressNew anode routed FEBIAD Test - 3Thermocouples installed (X):
O - O
O - Anode
  
  777   Tuesday, January 21, 2020, 09:38 Aaron SchmidtSiC#40LP-SIS  43044-843515-8In progressConditioning SiC#40 HSWas intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34:
 SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga 
  781   Thursday, January 30, 2020, 15:25 Aaron SchmidtC(#1)LP-SIS  43044-843515-3In progressConditioning C(#1) HSWas for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13:
 C#1_-_Short.docx 