ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
795
|
Tuesday, June 16, 2020, 11:03 |
Aaron Schmidt | Ta#60 | LP-SIS | ITW | TM2 | 44139-13 | 43515-5 | In progress | Conditioning Ta#60 | Tuesday, June 16, 2020, 11:01: Turbo pumps
on.
Wednesday, June 17, 2020, |
|
|
843
|
Monday, February 01, 2021, 08:38 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration | Monday, February 01, 2021, 08:38 : The
anode seems to be shorted but we can still
test the amount of dispersion at the |
|
|
804
|
Tuesday, August 04, 2020, 15:07 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | Tuesday, August 04, 2020, 15:04:
Roughing.
Wednesday, August 05, 2020, |
|
|
806
|
Tuesday, August 11, 2020, 12:04 |
Aaron Schmidt | UCx | LP-SIS | | | 44139-10 | 43515-4 | In progress | UCx HS conditioning with PEEK assembly | HS target leg openings were milled. Short
from previous test by the look of it. TBHT
insulator on source side is cracked. |
|
|
840
|
Thursday, January 21, 2021, 10:10 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Done | Energy spread calibration - SIS with TBHT negatively biased | Thursday, January 21, 2021, 10:05:
Anodeless Negative Bias On Surface Ion
Source, or ANBOSIS (still working on the |
|
|
842
|
Friday, January 29, 2021, 09:13 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | In progress | TS settings ok. | Friday, January 29, 2021, 09:11: CANBUS
controller was replaced. Quick systems check
ok. Sources, HV, & Optics all good. |
|
|
844
|
Thursday, February 04, 2021, 18:48 |
Fernando Maldonado | | LP-SIS | | | 44139-10 | 44378-2 | Problems/Solutions | Energy spread calibration with SIS | The system was vented to make clearance
on the waterlines as a very small continuous
discharge was observed. |
6x |
|
846
|
Monday, February 08, 2021, 09:20 |
Aaron Schmidt | | LP-SIS | | | 44139-10 | 44378-2 | Failed | Energy spread calibration with SIS. No PE | Re-salted. PE removed. EE Cleaned
Monday, February 08, 2021, 09:17:
Roughing. |
|
|
876
|
Monday, June 07, 2021, 13:45 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Ta#62 Conditioning | Monday, June 07, 2021, 13:44: Roughing.
Monday, June 07, 2021, 14:16: TP1B
on. (Tripped shortly after?) |
|
|
879
|
Wednesday, June 09, 2021, 14:31 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | In progress | Install MB1 window & 9 pin for V test. | Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing. |
|
|
880
|
Monday, June 21, 2021, 11:53 |
Aaron Schmidt | Ta#62 | LP-SIS | ITE | TM4 | 44139-10 | 44378-4 | Failed | Ta#62 Conditioning - 2 | Replace 9-pin back to normal grounded setup.
Re-salt Ta#62. (Cu Gaskets in-use on FS#5)
Monday, June 21, 2021, 11:30: Roughing |
|
|
939
|
Tuesday, August 30, 2022, 13:58 |
Aaron Schmidt | | | | | 44062-7 | 44378-25 | In progress | Conditioning UC#40 assembly | Conditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only). |
|
|
758
|
Monday, September 23, 2019, 13:30 |
Aaron Schmidt | Ta#59 | LP-SIS | ITE | TM2 | 44062-5 | 42752-10 | In progress | Conditioning Ta#59 Assy | Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open |
9x |
|
959
|
Thursday, February 02, 2023, 12:44 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-1 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Thursday, February 02, 2023, 12:41: |
|
|
958
|
Tuesday, January 31, 2023, 10:42 |
Aaron Schmidt | | LP-SIS | | | 44062-1-SK | 45235-7 | In progress | Conditioning UC#x assembly | SK Series of LP-SIS targets are for conditioning
only.
Tuesday, January 31, 2023, 10:39: |
|
|
949
|
Tuesday, December 06, 2022, 11:20 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Tests | Thermocouples installed:
O - O
O - Anode |
|
|
950
|
Tuesday, December 13, 2022, 16:12 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 2 | Thermocouples installed (X):
O - O
O - Anode |
|
|
951
|
Friday, December 16, 2022, 10:32 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 3 | Thermocouples installed (X):
O - O
O - Anode |
|
|
777
|
Tuesday, January 21, 2020, 09:38 |
Aaron Schmidt | SiC#40 | LP-SIS | | | 43044-8 | 43515-8 | In progress | Conditioning SiC#40 HS | Was intended for UC#31 - Now used for SiC#40*
PEEK SEAL Test piece attached.
Tuesday, January 21, 2020, 09:34: |
|
|
781
|
Thursday, January 30, 2020, 15:25 |
Aaron Schmidt | C(#1) | LP-SIS | | | 43044-8 | 43515-3 | In progress | Conditioning C(#1) HS | Was for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13: |
|