  Test-Stand, Page 5 of 53  Not logged in ELOG logo
ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject
  680   Wednesday, August 22, 2018, 15:20 Aaron Schmidt LP-SIS  41177-3  Voltage Tests (Ta Target)

 Wires reconfigured / set 

Wednesday, August 22, 2018, 13:10: Roughing. 

Wednesday, August 22, 2018, 15:18: Turbo Pumps on.


Thursday, August 23, 2018, 08:16: RGA On.

Thursday, August 23, 2018, 08:39: Power on. Waterlines opened. No response on RGA, Vacuum ok @7.25e-06T


Monday, August 27, 2018, 09:50: Venting.

Monday, August 27, 2018, 10:59: Ta foil removed from one end plate. Roughing.

Monday, August 27, 2018, 11:29: Turbo pumps started.

Monday, August 27, 2018, 11:36: Ion gauge on. Both Turbo pumps at speed.


Tuesday, August 28, 2018, 08:27: Power on

Tuesday, August 28, 2018, 08:30: Waterlines opened. Vacuum ok @ 9.31e-07T. No response on RGA.

Wednesday, August 29, 2018, 11:34: Epics crashed. See added elog.


Friday, August 31, 2018, 10:07: Voltage tests are complete. Results to be uploaded later.

RGA crashed. Unable to re-connect. Manually turned it off.

Friday, August 31, 2018, 10:14: Ion gauge & turbo pumps off.

Friday, August 31, 2018, 11:27: Venting.

 

  683   Friday, August 31, 2018, 12:27 Aaron SchmidtnSiC#1LP-SISITWTM243044-142752-4In progressConditioning nSiC#1

Friday, August 31, 2018, 12:27: Roughing.

Friday, August 31, 2018, 13:19: Turbo pumps started.


Wednesday, September 05, 2018, 11:03: RGA on.

***NOTE***

P (kW) = A*V

TGHT at 475/7.84V, temp at 1550 C (3.72 kW - Max operating target heating power)

Note:  To condition the nanoSiC, it is better to keep TBHT at 0A and ramp up TGHT to 475A while monitoring the vacuum.  Then step up TBHT; any increase in vacuum would indicate a local evaporation of nanoSiC close to the ionizer. 

Settings as per John Wongs instructions and found in https://elog.triumf.ca/TIS/Evaporator_2/414

DO NOT EXCEED 400A


Thursday, September 06, 2018, 07:23: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T

Thursday, September 06, 2018, 07:25: Power/sources on.

Thursday, September 06, 2018, 07:30: Auto-ramping TGHT to 250 A @ 2A per min

Thursday, September 06, 2018, 07:38: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.

Thursday, September 06, 2018, 07:39: IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.6 3.85
 TBHT 26.8 3.12
 COIL + EE 25.4 4.99
 TGHT  25.5 5.64

Thursday, September 06, 2018, 07:43: Optics set.

Thursday, September 06, 2018, 08:25: Vacuum @ 1.05e-06T. TGHT @ 105 A. Rate increments based on Vacuum. Minor out gassing.

Thursday, September 06, 2018, 08:51: Vacuum @ 9.13e-07T. TGHT @ 150 A. Rate increments back to 2A.

Thursday, September 06, 2018, 10:13: Vacuum @ 6.62e-07T. TGHT @ 250 A / 2.171 V.

Thursday, September 06, 2018, 11:11: Auto-ramping TGHT to 400 A @ 2A per min.

Thursday, September 06, 2018, 11:51: Vacuum @ 1.05e-06T. TGHT @ 315 A. Rate increments based on Vacuum. Minor out gassing.

Thursday, September 06, 2018, 13:44: Auto-ramping TGHT to 450 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 358 A. Rate increments based on Vacuum. Out gassing.

Thursday, September 06, 2018, 14:34: Auto-ramping TGHT to 400 A @ 2A per min. Vacuum @ 1.05e-06T. TGHT @ 383 A. Rate increments based on Vacuum. Out gassing.


Friday, September 07, 2018, 06:24: Auto-ramping TGHT to 450 A @ 2A per min. TGHT VOL @ 4.200 V

Friday, September 07, 2018, 06:50: TGHT @ 450 A. Vacuum @ 9.13e-07T. TGHT VOL @ 4.933 V

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.6 3.85
 TBHT 26.8 3.12
 COIL + EE 25.5 4.99
 TGHT 27.0 5.64

Friday, September 07, 2018, 06:55: Auto-ramping TBHT to 150 A @ 2A per min.

Friday, September 07, 2018, 08:12: TBHT @ 150 A. Vacuum @ 9.57e-07T. TGHT VOL @ 1.470 V

Friday, September 07, 2018, 08:15: Auto-ramping TBHT to 230 A @ 2A per min.

Friday, September 07, 2018, 09:55: TBHT @ 230 A. Vacuum @ 9.97e-07T. TGHT VOL @ 1.520 V

Friday, September 07, 2018, 11:00: EZL to 13.5 kV

Friday, September 07, 2018, 15:12: Auto-cooling @ 2 A per min.


Monday, September 10, 2018, 08:15: RGA off.

Monday, September 10, 2018, 08:20:BIAS / EZL / EE @ 0. Sources off.

Monday, September 10, 2018, 08:23: IV4 closed / reset. Ion gauge off. Turbo pumps off.

  684   Wednesday, September 12, 2018, 11:19 Aaron SchmidtTa#57LP-SISITETM441177-342752-6In progressConditioning Ta#57

Wednesday, September 12, 2018, 11:06: Roughing. Help req'd. Doors wouldn't seal.

Wednesday, September 12, 2018, 11:52: Turbo pumps started. 

Wednesday, September 12, 2018, 12:40: Ion gauge on.


Thursday, September 13, 2018, 07:30: Waterlines opened. No response on RGA. Vacuum ok @ 5.5e-07T

Thursday, September 13, 2018, 07:33: Power/sources on.

Thursday, September 13, 2018, 07:37: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min

Thursday, September 13, 2018, 07:42: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.

Thursday, September 13, 2018, 07:43: IV4 opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.6 4.02
 TBHT 24.4 3.10
 COIL + EE 24.4 5.13
 TGHT  24.6 5.77

Thursday, September 13, 2018, 07:44: Optics set.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 24.6 3.13
 COIL + EE 24.4 5.16
 TGHT  26.5 5.82

Thursday, September 13, 2018, 13:56: Vacuum @ 9.97e-07T.


Friday, September 14, 2018, 09:55:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.5 4.02
 TBHT 24.6 3.13
 COIL + EE 24.4 5.16
 TGHT  26.5 5.82

Friday, September 14, 2018, 09:55:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 33.7 3.99
 TBHT 24.6 3.11
 COIL + EE 24.6 5.12
 TGHT  26.5 5.83

Friday, September 14, 2018, 14:41: Auto-cooling @ 2 A per min.


Monday, September 17, 2018, 09:15: HV to 0. RGA off, IV4 closed & reset

Monday, September 17, 2018, 09:20: Sources off. Turbo pumps & Ion gauge off. Power off.

Monday, September 17, 2018, 09:23: Waterlines purged.

 

  685   Monday, September 17, 2018, 11:52 Aaron SchmidtUC#25LP-SISITWTM2 42752-9In progressConditioning Heat Shield for UC#25

Monday, September 17, 2018, 11:47: Roughing*. Doors not sealing, help acq'd 

Monday, September 17, 2018, 11:51: Roughing. Doors sealed

Monday, September 17, 2018, 12:30: Turbo pumps started.

Monday, September 17, 2018, 14:09: RGA on.


Tuesday, September 18, 2018, 09:01: Waterlines opened. No response on RGA. Vacuum ok @ 5.92e-07T.

Tuesday, September 18, 2018, 09:02: Power on

Tuesday, September 18, 2018, 09:05: Sources on.

Tuesday, September 18, 2018, 09:08: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.8 4.02
 TBHT 24.4 3.11
 COIL + EE 24.6 5.15
 TGHT  24.6 5.79

 


Wednesday, September 19, 2018, 08:14: Vacuum @ 7.73e-07T.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 34.8 4.02
 TBHT 24.7 3.10
 COIL + EE 24.9 5.13
 TGHT  26.8 5.77

 Wednesday, September 19, 2018, 14:30: Auto-cooling @ 2A per min.


Friday, September 21, 2018, 07:52: Power / Sources off.

Friday, September 21, 2018, 07:53: RGA off. Ion Gauge off. Turbo pumps off.

Friday, September 21, 2018, 07:56: Waterlines purged. TS locked out.

 

 

  717   Monday, April 15, 2019, 14:42 Aaron Schmidt LP-SIS   42972-1DoneConditioning UC#27 HS & test FS#3

New coil lines installed for P2N testing later.

Monday, April 15, 2019, 14:15: Roughing.

Monday, April 15, 2019, 14:49: Turbo pumps on.


Tuesday, April 16, 2019, 08:20: RGA on.

Gradually open each line. Wait 5 minutes & monitor the response.

Tuesday, April 16, 2019, 08:30: Open Return & Supply main valves.

Tuesday, April 16, 2019, 08:32: Open FS#5. Vacuum @ 4.29e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:37: Vacuum @ 4.37e-06T

Tuesday, April 16, 2019, 08:38: Open FS#4. Vacuum @ 4.37e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:43 Vacuum @ 4.29e-06T

Tuesday, April 16, 2019, 08:44 Open FS#3. Vacuum @ 4.29e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:49: Vacuum @ 4.26e-06T.

Tuesday, April 16, 2019, 08:50: Open FS#2. Vacuum @ 4.29e-06T. No response on RGA (water).

Tuesday, April 16, 2019, 08:57: Vacuum @ 4.29e-06T.


Wednesday, April 17, 2019, 08:30: Power/sources on. Vacuum @ 2.46e-06T.

Wednesday, April 17, 2019, 10:30: Auto-ramping TGHT  to 150 @ 2A per min. Vacuum limit increased to 3.000e-06T.

Wednesday, April 17, 2019, 11:53: Auto-ramping TGHT  to 300 @ 2A per min. Vacuum @ 2.50e-06T.

Wednesday, April 17, 2019, 13:10: Auto-ramping TGHT  to 350 @ 2A per min. Vacuum @ 2.95e-06T.


Thursday, April 18, 2019, 07:23: Auto-ramping TGHT  to 575 @ 2A per min. Vacuum @ 2.40e-06T.


Tuesday, April 23, 2019, 06:45: Auto-Cooling TGHT @ 2A per min. Vacuum @ 9.22e-07T. 

Tuesday, April 23, 2019, 08:29: RGA error. Shut off RGA.

Tuesday, April 23, 2019, 11:34: Power/sources off.

Tuesday, April 23, 2019, 11:37: IG1 off. Turbos off.

Tuesday, April 23, 2019, 12:53: Venting.

  718   Tuesday, April 23, 2019, 14:39 Aaron Schmidt LP-SIS   42752-8DoneConditioning UC#28 HS

Tuesday, April 23, 2019, 14:39: Roughing.

Tuesday, April 23, 2019, 15:09: Turbo pumps started.

Tuesday, April 23, 2019, 15:18: Ion gauge on. 


Wednesday, April 24, 2019, 07:33: RGA on.

Wednesday, April 24, 2019, 07:37: Waterlines opened. Vacuum ok @ 7.99e-07T. No response on RGA

Wednesday, April 24, 2019, 07:41: Power / sources on.

Wednesday, April 24, 2019, 07:43: Auto-ramping TGHT  to 575 @ 2A per min. Vacuum limit remains at 3.000e-06T.


Thursday, April 25, 2019, 14:07: Auto-cooling @ 2 A per min.


Friday, April 26, 2019, 07:53: sources off.

Friday, April 26, 2019, 07:55: RGA off. Power off.

Friday, April 26, 2019, 07:57: Turbos off.

Friday, April 26, 2019, 08:00: HS waterlines purged.

  719   Friday, April 26, 2019, 13:45 Aaron SchmidtTa#58LP-SISITETM243044-442972-7In progressConditioning Ta#58 HS

Friday, April 26, 2019, 13:43: Roughing.

Friday, April 26, 2019, 14:12: Turbo pumps on.

Friday, April 26, 2019, 14:58: RGA on.


Monday, May 06, 2019, 07:05: RGA restarted.

Monday, May 06, 2019, 07:10: Waterlines opened. Vacuum ok @ 5.13e-07T. No response on the RGA.

Monday, May 06, 2019, 07:16: Power / sources on.

Monday, May 06, 2019, 07:20: Optics set.

Monday, May 06, 2019, 07:23: Auto-ramping TGHT / TBHT to 575 / 200 A @ 2A per min.

Monday, May 06, 2019, 07:28: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.

Monday, May 06, 2019, 07:39: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, May 06, 2019, 07:57: Reset DaqPro. Ref data sheet.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.8 5.52
 TBHT 25.7

7.93

 COIL + EE 25.6 1.92
 TGHT  25.70 6.29

 Monday, May 06, 2019, 09:07: TBHT at 200A ok. Halt auto ramp. Set TBHT. Cont'd auto-ramping TGHT / TBHT to 575 / 230 A @ 2A per min.

Monday, May 06, 2019, 09:47: RGA restarted. Updates?

RGA timed out around 10:30.

Monday, May 06, 2019, 11:00: RGA error. Initial communications errors, would not connect. Restarted the computer and allowed updates to take effect. EM7 error displayed.

Monday, May 06, 2019, 11:27: RGA restarted.

Monday, May 06, 2019, 13:10: EZL to 14.3 kV

Monday, May 06, 2019, 14:48 :

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.4 7.78
 TBHT 27.0

10.30

 COIL + EE 26.8 3.01
 TGHT  27.1 7.09

 


Tuesday, May 07, 2019, 07:26: Noticed a discrepancy on the mass scan. The mass peaks appear to have moved further along the mass / q. They are identical to what we used to see on previous scans, just further down the line. A calibration / scaling may be appropriate.

Element Mass Mass/q Beam Current
Lithium 6.941 7.508 1.04401e-10
Sodium 22.9897 27.556 9.85687e-10
Mass 27 (Al) 26.9815 32.2943 2.97834e-08
Potassium 39.0983 46.3293 7.49146e-10
  (peak 2) 47.6191 1.568e-10
Rubidium 85.4678 100.355 2.79327e-10
  (peak 2) 102.904 1.04431e-10
Cesium 132.9055 156.6 8.6103e-10
  (peak 2) 162.532 2.4408e-10

The discrepancy appears to get larger the further we move along the masses.

Tuesday, May 07, 2019, 07:39: Auto-cooling @ 2 A per min to TGHT / TBHT @ 350 / 0 A. Check around 9:20am.

Tuesday, May 07, 2019, 09:30: Auto-cooled to TGHT / TBHT @ 350 / 0 A.

Tuesday, May 07, 2019, 11:06: Auto-cooling @ 2A per min.

Tuesday, May 07, 2019, 11:09: Auto-cooling @ 4A per min.

Tuesday, May 07, 2019, 12:51: Power / sources off. IV4 closed / reset. RGA off.

Tuesday, May 07, 2019, 12:54: Turbo pumps off.

Tuesday, May 07, 2019, 14:00: Venting.

  721   Tuesday, May 07, 2019, 13:16 Aaron SchmidtTa#58LP-SISITETM243044-4 In progress9-pin connection configuration (Using Ta#58)

Ref:

https://elog.triumf.ca/TIS/Test-Stand/679

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

Pins connected source tray side: 1, 4, 5, 6

ST 9-pin                       HV rack

Pin to L TGHT - 1 - Black / COM / 5

Pin to R TGHT - 6 - Red / 9

Pin to L TBHT - 4 - Black / COM / 2

Pin to R TBHT - 5 - Red / 1

Tuesday, May 07, 2019, 15:20: Roughing.

Turbo pumps switched on w/ Ion gauge around 4pm.


Wednesday, May 08, 2019, 08:05: Multi-meters tested & connected.

Wednesday, May 08, 2019, 08:09: Power / sources on.

Wednesday, May 08, 2019, 08:13: RGA on

Wednesday, May 08, 2019, 08:14: Auto-ramping TGHT / TBHT to 575 (580) / 230 A @ 2A per min.

Wednesday, May 08, 2019, 08:30: Voltage reading off on TBHT? Connection to source tray side is wrong.

Wednesday, May 08, 2019, 08:40: Halt auto ramping. Manually tap down TBHT / TGHT

Wednesday, May 08, 2019, 08:42: Sources /  RGA off.

Wednesday, May 08, 2019, 08:43: Turbo pumps off.

Wednesday, May 08, 2019, 10:40: Roughing.

Wednesday, May 08, 2019, 11:01: Turbo pumps on.

Wednesday, May 08, 2019, 13:10: Power / sources on. Vacuum @ 4.37e-06T

Wednesday, May 08, 2019, 13:19: Auto-ramping TGHT to 575 (580) A @ 2A per min. However, the vacuum is not quite ready. Increment value set to 3.000e-06T to ramp. Once the vacuum is reached, the heaters will start to ramp automatically.

Wednesday, May 08, 2019, 14:23: Auto-ramping ongoing successfully. TGHT @ 32A +. Vacuum @ 2.66e-06T


Thursday, May 09, 2019, 07:05: Auto-ramping TGHT to 575 (580) A @ 2A per min from 400 A.


Monday, May 13, 2019, 08:00: TSG:TP1A appears to have tripped over the weekend. (Around 7pm Saturday)

Closed IV4 / reset. Reset TP1A. Reset BV1A.  Turn on TP1A.

Monday, May 13, 2019, 08:32: TBHT & TGHT switched back on.

Ramped down around 10 PM.


Tuesday, May 14, 2019, 07:10: Power / RGA off.

Tuesday, May 14, 2019, 07:12: IV4 closed, Ion gauge & turbo pumps off.

Tuesday, May 14, 2019, 08:35: Waterlines purged. Venting.

  722   Tuesday, May 14, 2019, 10:22 Aaron SchmidtZrC#8LP-SISITETM243044-542972-3In progressConditioning ZrC#8 HS

Tuesday, May 14, 2019, 10:21: Roughing

Tuesday, May 14, 2019, 10:51: Turbo pumps on.

Tuesday, May 14, 2019, 11:05: Ion gauge, RGA on.


Wednesday, May 15, 2019, 08:42: Waterlines opened. Vacuum Ok @ 6.45e-07T. No response on RGA.

Wednesday, May 15, 2019, 08:58: Power / sources on.

Wednesday, May 15, 2019, 09:00: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.

Wednesday, May 15, 2019, 09:02: Optics set. IV4 open.

Wednesday, May 15, 2019, 09:09: BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV.

Wednesday, May 15, 2019, 09:10:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.34 5.24
 TBHT 26.28

8.23

 COIL + EE 26.11 2.18
 TGHT  26.21 6.44

Wednesday, May 15, 2019, 10:39: Abort auto-ramp. Significant out gassing note. Vacuum @3.12e-06T

TGHT /  TBHT @ 77 A. Hold until stable again. Effect noted similar to ZrC#7 ( https://elog.triumf.ca/TIS/Test-Stand/450 ). Resume Auto ramp in 1 hour to TGHT / TBHT 350 / 150 A.

Wednesday, May 15, 2019, 11:54: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.

Wednesday, May 15, 2019, 14:47: TGHT / TBHT @ 146 / 146 A. Ramping to 350 / 150 A overnight. 


Thursday, May 16, 2019, 07:30: Restarted RGA.

Thursday, May 16, 2019, 07:54: Mass scan taken albeit still ramping. TGHT / TBHT @ 280 / 150 A.

Thursday, May 16, 2019, 09:10: Ramping aborted @ TGHT / TBHT @ 285 (287.6) / 150 A. Allow for further out gassing.

Thursday, May 16, 2019, 13:22: Vacuum limit increased to 2.0e-06T. Vacuum @ 7.86E-07T.

Thursday, May 16, 2019, 13:23: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2A per min.


Tuesday, May 21, 2019, 07:03: Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.

Tuesday, May 21, 2019, 12:30: TGHT Stopped at 557.2A. Readout at 578. Moved readout to 557. Readback @ 557.2A.


Wednesday, May 22, 2019, 07:09: TGHT was at voltage limit. The limit was increased. Auto-ramping TGHT / TBHT to 578 (580) / 230 A @ 2A per min.

Wednesday, May 22, 2019, 07:32: TGHT 579.9 A / 8.051 V. 

Wednesday, May 22, 2019, 13:45: Masscorr calibration confirmed.

Wednesday, May 22, 2019, 13:51: Auto-cooling @ 2A per min.


Thursday, May 23, 2019, 13:27: Sources / Power off. RGA off.

Thursday, May 23, 2019, 13:31: IV4 Closed. Turbo pumps off.

  726   Monday, June 03, 2019, 11:35 Aaron Schmidt LP-SIS TM4395530-342752-5Problems/SolutionsTGHT PS Failed.

Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT

The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.

Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.

PS model: Xantrex XPR 10-600

Message lights on the front of the power supply:

OTP - INT - OVP - SNS Triggered.

Front Panel Display, Status Annunciators
1. AC: The AC input is out of range and has
caused the output of
the supply to be
shut down (red)
2. OTP: The internal Over Temperature
Protection threshold has been exceeded,
disabling the supply output until the sensor
s cool to within the normal operating
temperature range (red)
3. INT: The external shutdo
wn line has been asserted, disabling the output of the
supply (green)
4. OVP: The output Over Voltage Prot
ection threshold have been exceeded,
latching the supply output off (red)
5. SNS: The remote sense line protection
circuit has been activated, latching the
supply output off (red)
6. ON: The supply output
is enabled (green)
7. OFF: The supply output
has been disabled (green)
8. LCL: The supply is in
Local control mode (green)
9. RMT: The supply is in Remote program mode (green)
10. CV: The supply is operating in
Constant Voltage mode (green)
11. CC: The supply is operating in
Constant Current mode (green)

Thursday, June 13, 2019, 14:05: ELOG 732 - PS replaced.

  758   Monday, September 23, 2019, 13:30 Aaron SchmidtTa#59LP-SISITETM244062-542752-10In progressConditioning Ta#59 Assy

Monday, September 23, 2019, 13:28: Roughing.

Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.

Monday, September 23, 2019, 14:20: Turbo pumps started.

Monday, September 23, 2019, 14:27: Ion gauge on.


Tuesday, September 24, 2019, 08:04: RGA on.

Tuesday, September 24, 2019, 08:07: Waterlines opened. No response on RGA. Vacuum ok @ 1.52e-06T.

Tuesday, September 24, 2019, 08:12: Power / sources on.

Tuesday, September 24, 2019, 08:16: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.

Tuesday, September 24, 2019, 08:19: IV4 opened. Initial attempt to open IV4 unsuccessful - Timed out. Reset.

Tuesday, September 24, 2019, 08:20: IV4 Opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.33 5.00
 TBHT 28.19

7.75

 COIL + EE 28.08 2.13
 TGHT  28.18 6.15

Tuesday, September 24, 2019, 08:28: BIAS / EE / EZL @ 27 / -1.5 / 13 kV. Spark*

Tuesday, September 24, 2019, 08:30: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, September 24, 2019, 09:07: Optics set.

Tuesday, September 24, 2019, 10:45: Clusters of sparks noted. Especially around 10:20.

Tuesday, September 24, 2019, 10:58: RGA reset.

Tuesday, September 24, 2019, 11:05  Sparks ongoing. spaced from 1 minutes apart to 15 minutes apart. The TBHT insulator is glowing blue on the left right side again.

Tuesday, September 24, 2019, 11:06: Abort Target heating.

Tuesday, September 24, 2019, 11:12: BIAS to 23 KV. Blue glow less pronounced /  almost gone.

Tuesday, September 24, 2019, 11:15: BIAS to 30 KV. Blue glow remains.

Tuesday, September 24, 2019, 11:31: Continue auto-ramping @ 2A per min.

Tuesday, September 24, 2019, 11:39. HV off.

Tuesday, September 24, 2019, 11:49: Halt ramp. Auto-cooling @ 4 A per min.

Remove loose wiring / connection from 9-pin area in the back. Ground other loose connections.

Tuesday, September 24, 2019, 13:28: Auto-ramping TGHT / TBHT to 250 / 200 A @ 4A per min.

Tuesday, September 24, 2019, 13:31: HV sources on. Optics on.

Tuesday, September 24, 2019, 13:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, September 24, 2019, 14:32: Auto-ramping TGHT to 280 A @ 4A per min.

Tuesday, September 24, 2019, 14:40: TGHT / TBHT @ 280 /  200 A.


EPICS issues* ? Won't open at the ISAC TS computer.

Wednesday, September 25, 2019, 07:30: Auto-ramping TGHT to 350 A @ 2 A per min. 

Wednesday, September 25, 2019, 07:44:  EPICS Error at my desk as well. Able to restart it and continue ramping.

Wednesday, September 25, 2019, 07:56: EPICS Issue ongoing. Halted ramping @ 290 A on TGHT.

Wednesday, September 25, 2019, 10:44: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min. 

Wednesday, September 25, 2019, 11:57: FM: Sparks have been occurring for the past 20 min with a rate approx of 0.5/min. The TBHT insulator is again  showing a glowing blue. I managed to saw one spark flashing up the TBHT insulator.

Wednesday, September 25, 2019, 12:59: RGA restarted.

Wednesday, September 25, 2019, 13:36: Spark* knocked out TSG:CB1 during RPM6A wire scan. Controls notified.

Wednesday, September 25, 2019, 14:45: After investigation with controls, replacement of the control board to TSG:CB1 likely req'd.


Thursday, September 26, 2019, 06:30: HV off. Prep to remove control board for TSG:CB1. 

Thursday, September 26, 2019, 11:28: The control board to TSG:CB1 was removed and replaced. https://elog.triumf.ca/TIS/Test-Stand/759

Thursday, September 26, 2019, 11:30: All optics & steering operational. Board replacement successful.

Thursday, September 26, 2019, 11:36:  BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Thursday, September 26, 2019, 12:31: Mass, wire, & emittance scans successful

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.23 7.59
 TBHT 26.86

10.02

 COIL + EE 26.65 3.27
 TGHT  26.89 7.29

Thursday, September 26, 2019, 12:33: Auto-cooling to TGHT / TBHT to 530 / 180 @ 4A per min.

Thursday, September 26, 2019, 12:45: TGHT / TBHT @ 530 / 180A. Hold*  

Thursday, September 26, 2019, 13:17: No Sparks*. Auto-cooling to TGHT / to 500 @ 4A per min.

Thursday, September 26, 2019, 13:25: No Sparks*. FC0 'in'.  

Thursday, September 26, 2019, 13:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min. 

Thursday, September 26, 2019, 14:28: Auto-cooling @ 2A per min.


Friday, September 27, 2019, 07:17: HV off.

Friday, September 27, 2019, 07:19: RGA off

Friday, September 27, 2019, 07:21: Close & reset IV4.

Friday, September 27, 2019, 07:23: Power / Sources off. Ion gauge & Turbo pumps off.

Friday, September 27, 2019, 10:29: Venting. Waterlines purged.

  760   Friday, September 27, 2019, 11:54 Aaron Schmidt LP-SIS  41790-943515-6 Conditioning UC#(29) HS

Using broken LP-FEBIAD oven. TBHT off.

Friday, September 27, 2019, 11:53: Roughing.

Friday, September 27, 2019, 13:14: Turbo pumps on.

Friday, September 27, 2019, 13:20: Ion gauge on.

Friday, September 27, 2019, 13:24: RGA on.


Monday, September 30, 2019, 07:30: Waterlines Opened. No response on RGA. Vacuum ok @ 5.39e-07T.

Monday, September 30, 2019, 07:34: Power / Sources on.

Monday, September 30, 2019, 07:35: Auto-ramping TGHT to 580 A @ 2 A per min.


Tuesday, October 01, 2019, 14:29: Auto-Cooling TGHT @ 2A per min.


Wednesday, October 02, 2019, 08:24: Power / sources off.

Wednesday, October 02, 2019, 08:25: RGA off.

Wednesday, October 02, 2019, 08:26: Ion gauge & Turbo pumps off.

Wednesday, October 02, 2019, 12:50: Venting & Waterlines purged.

  761   Wednesday, October 02, 2019, 13:42 Aaron Schmidt LP-SIS  41790-943515-9In progressConditioning UC#(30) HS

Wednesday, October 02, 2019, 13:42: Roughing.

Wednesday, October 02, 2019, 14:13: Turbo Pumps started.

Wednesday, October 02, 2019, 14:19: Ion gauge on.

Wednesday, October 02, 2019, 14:24: RGA on.


Thursday, October 03, 2019, 07:35: Waterlines opened.  No response on RGA. Vacuum ok @ 7.53e-07T

Thursday, October 03, 2019, 07:37: Power / Sources on.

Thursday, October 03, 2019, 07:38: Auto-ramping TGHT to 580 A @ 2 A per min.


Friday, October 04, 2019, 14:53: Auto-cooling @ 2 A per min. 


Wednesday, October 16, 2019, 10:17: RGA off.

Wednesday, October 16, 2019, 10:19: Power / Sources off. IG1 off. Turbo pumps off.

  769   Friday, November 01, 2019, 16:01 Fernando Maldonado LP-SIS  41790-9 43515-9 In progressPeek seal tests on UCx#30 HS

Friday, November 01, 2019, 15:47: A symbiotic  peek seal assembly  was installed on the manipulator grip to verify the temperature at high voltage and high current.

Friday, November 01, 2019, 15:48: Three  thermocouples added for temperature readings.

Friday, November 01, 2019, 15:47: Roughing

Friday, November 01, 2019, 16:19: Turbos on.

Friday, November 01, 2019, 16:27: IG1 on.

Friday, November 01, 2019, 16:29: RGA on.


AS

Monday, November 04, 2019, 07:41: Waterlines opened. No response on RGA. Vacuum ok @ 3.97e-07T.

Monday, November 04, 2019, 07:44: Power / sources on.

Monday, November 04, 2019, 07:47: Auto-ramping TGHT to 300 A @ 2 A per min.

Monday, November 04, 2019, 10:57: Auto-ramping TGHT to 400 A @ 2 A per min.

FM

Monday, November 04, 2019, 12:11: Auto-ramping TGHT to 500 A @ 2 A per min.

Monday, November 04, 2019, 13:35: Auto-ramping TGHT to 600 A @ 2 A per min.

Monday, November 04, 2019, 14:48: Bias/EE/EZL @ 30/1.5/13 kV.

Monday, November 04, 2019, 15:03: Bias/EE/EZL @ 40/2.0/17 kV.

Monday, November 04, 2019, 15:04: Sparks observed after reaching 40 kV. TMS:TP6 down. Back down to 32 kV.

Monday, November 04, 2019, 15:04:  Bias to 40 kV. One spark only. Seems stable now.

Sparks occurred sparsely. Max time without a spark was 26 minutes.

Monday, November 04, 2019, 16:09: Bias/EE/EZL @ 30/1.5/13 kV.

Monday, November 04, 2019, 16:16: RGA restart.


AS

Tuesday, November 05, 2019, 08:30: RGA Restarted.

Tuesday, November 05, 2019, 08:32: Begin bringing up HV to 35 kV on BIAS.

Tuesday, November 05, 2019, 08:35: BIAS / EE / EZL @ 35 / 1.8 / 15 kV.

Tuesday, November 05, 2019, 08:55: No sparks after 20 minutes. Move up to 40 kV.

Tuesday, November 05, 2019, 08:59: BIAS / EE / EZL @ 40 / 2.0 / 20 kV.

Tuesday, November 05, 2019, 09:34: Audible Spark*. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6. Appears on EZl cur.

Tuesday, November 05, 2019, 09:37: RGA off. Leave it off.

Tuesday, November 05, 2019, 09:38: Audible Spark* but not loud at all. Restart TSG: CB1, VCB1, CBCx2. Reset & restart turbo pump. TMS:TP6.

Tuesday, November 05, 2019, 10:00: BIAS / EE / EZL @ 35 / 1.8 / 17.5 kV.

Tuesday, November 05, 2019, 10:06: BIAS / EE / EZL @ 0 / 0 / 0 kV.

Tuesday, November 05, 2019, 10:07: Auto-cooling TGHT to 500 A @ 4 A per min.


Wednesday, November 13, 2019, 07:29: Turbo pumps & ion gauge off. RGA was already off.


Friday, November 15, 2019, 08:43: Venting.

 

 

  770   Friday, November 08, 2019, 14:21 Aaron Schmidt LP-SIS  41790-943515-9In progressNitrogen Bottle leak test

Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38

4.8 Purity

35-40 PSI pressure.

Successfully purged the line after 5 minutes.


Friday, November 08, 2019, 14:16: Begin FS#5 waterline purge w/ Nitrogen. Purge done in conjunction with UC#30 HS & assy.

4.8 Purity

12-14 PSI line pressure.

2500 PSI bottle pressure.

Full stream for a minute or so, then purged lightly. Drops / mist outgoing.

Friday, November 08, 2019, 14:24: Line Pressure at 10-11 PSI, brought back up to 14 PSI.

2400 PSI bottle pressure. Water / mist outgoing still.

Friday, November 08, 2019, 14:31: No water appears on line with purge.

Approx 2350 PSI bottle pressure.

Line pressure increased to 40 PSI. No water appeared on the purge line.

Friday, November 08, 2019, 14:34: Purge complete. 14 PSI appears successful.

  777   Tuesday, January 21, 2020, 09:38 Aaron SchmidtSiC#40LP-SIS  43044-843515-8In progressConditioning SiC#40 HS

Was intended for UC#31 - Now used for SiC#40*

PEEK SEAL Test piece attached.

Tuesday, January 21, 2020, 09:34: BV1A open Roughing.

Tuesday, January 21, 2020, 09:38: BV1B open.

Tuesday, January 21, 2020, 10:05: Turbo pumps on.

Tuesday, January 21, 2020, 10:10: Ion gauge on.


Monday, January 27, 2020, 07:07: PS / Sources on. Waterlines already opened.

Monday, January 27, 2020, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Tuesday, January 28, 2020, 14:45: Auto-Cooling @ 2 A per min.


Thursday, January 30, 2020, 11:31: PS / Source off.

Thursday, January 30, 2020, 11:33: IG1 off. Turbos off.

Thursday, January 30, 2020, 13:00: Venting.

  781   Thursday, January 30, 2020, 15:25 Aaron SchmidtC(#1)LP-SIS  43044-843515-3In progressConditioning C(#1) HS

Was for UC# 32* - Schedule change, now for C#1

Thursday, January 30, 2020, 15:13: Roughing.

Thursday, January 30, 2020, 15:46: Turbo pumps on.

 Thursday, January 30, 2020, 15:50: IG1 on.


Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.

Friday, January 31, 2020, 08:16: Power / sources on

Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min. 


Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.


Friday, February 07, 2020, 11:45:

Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd.

  782   Friday, February 07, 2020, 14:02 Aaron SchmidtC#(1)LP-SIS  43044-843515-3In progressConditioning C#(1) HS

Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.

Friday, February 07, 2020, 14:00: Roughing.

Friday, February 07, 2020, 14:33: Turbo pumps on.

Friday, February 07, 2020, 14:38: IG1 on.


Monday, February 10, 2020, 07:39: HS waterlines opened. Vacuum ok @ 4.12e-07T.

Monday, February 10, 2020, 07:41: Power / sources on.

Monday, February 10, 2020, 07:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Monday, February 10, 2020, 13:01: Heating appears ok. No voltage abnormalities or short.

Monday, February 10, 2020, 13:02: Auto-Cooling @ 1 A per min.


Tuesday, February 11, 2020, 06:39: Power / Sources off.

Tuesday, February 11, 2020, 06:40: Waterlines purged. Nitrogen bottle @ 2100 PSI approx.

Tuesday, February 11, 2020, 06:42: IG1 off. Turbo pumps off.

Tuesday, February 11, 2020, 09:59: Venting.

 

  784   Wednesday, February 12, 2020, 11:04 Aaron Schmidt LP-SIS  41790-943515-1In progressConditioning HS

Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*

Wednesday, February 12, 2020, 10:57: Roughing.

Wednesday, February 12, 2020, 11:30: Turbo pumps on.


Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.

Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.

Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.


Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.


Thursday, February 20, 2020, 07:33: PS, sources off, locked out.

Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.

Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.

Thursday, February 20, 2020, 09:22: Venting.

 

  785   Thursday, February 20, 2020, 11:41 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing

 Ta#60 (Unconditioned) - Salts in.

Thursday, February 20, 2020, 14:04: Roughing.

Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).

Thursday, February 20, 2020, 14:43: IG1 on.


Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.

Friday, February 21, 2020, 06:38: Turbo pumps off.

EE Thermocouples req'd.

Friday, February 21, 2020, 11:15: Vented.

9-pin removed. Thermocouples installed.

Friday, February 21, 2020, 13:52: Roughing.

Friday, February 21, 2020, 14:24: Turbo pumps on.


EE Waterline - On

Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T

Wednesday, February 26, 2020, 07:43: Power / sources on.

Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
 250 / 150 20.8 24.0
 350 / 200 22.5

29.7

 450 / 230 20.1 30.9
 580 / 230 14.5 28.8
580 / 230 @ 2:52 pm 6.2 21.6

Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.

Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)

Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.


Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.

Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.

No water/cooling running into EE.

Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.

Thursday, February 27, 2020, 07:28: Power / Sources on.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
0 / 0 22.8 22.9
 50 / 25 22.6 22.7
100 / 50 22.6

22.6

150 / 100 22.2 23.3
200 / 150 22.0 24.9
200 / 150 7am Day 2 21.2 23.9
250 / 200 23.3 29.3
300 / 230 22.4 30.6
350 / 230 19.2 27.7
450 / 230 18.5 29.7
580 / 230 13.4 27.3

Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.

Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.

Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.

Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.


Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.

Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.

Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.

Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.

Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.


Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)

Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off.