512
|
Thursday, June 09, 2016, 14:56 |
Aaron Schmidt | | LP-SIS | | | | | | TUBE ONLY | Thursday, June 09, 2016, 14:50: Begin roughing.
Thursday, June 09, 2016, 15:34: Turbo
pumps started. |
|
514
|
Tuesday, June 14, 2016, 10:46 |
Aaron Schmidt | | LP-SIS | | | | | | TUBE ONLY - NO PLASMA ELECTRODE | Tuesday, June 14, 2016, 10:46: Begin roughing.
Tuesday, June 14, 2016, 11:16: Turbo
pumps started. |
|
515
|
Thursday, June 16, 2016, 14:34 |
Aaron Schmidt | | LP-SIS | | | | | | TUBE ONLY (3) | Thursday, June 16, 2016, 14:33: Roughing.
Plasma Electrode re-attached. Salts replaced.
Thursday, June 16, 2016, 15:12: Turbo |
|
547
|
Tuesday, October 18, 2016, 13:29 |
Aaron Schmidt | Ta#50 | LP-SIS | ITE | TM4 | 41790-5 | 41751-1 | In progress | Conditioning Ta#50 | Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started. |
9x |
549
|
Thursday, October 27, 2016, 13:37 |
Aaron Schmidt | UC#18 | LP-SIS | ITW | TM2 | | 41751-3 | In progress | Conditioning Heat shield for UC#18 | Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started. |
|
574
|
Friday, March 24, 2017, 14:43 |
Aaron Schmidt | Ta#51 | LP-SIS | ITW | TM2 | 41790-4 | 41751-5 | In progress | Conditioning Ta#51 | Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on. |
9x |
592
|
Friday, June 09, 2017, 13:28 |
Aaron Schmidt | Ta#52 | LP-SIS | ITE | TM4 | 42218-14 | 41751-8 | In progress | Conditioning Ta#52 | Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on. |
8x |
595
|
Thursday, July 06, 2017, 13:16 |
Aaron Schmidt | Ta#55 | LP-SIS | | | 42218-11 | 42738-2 | In progress | Conditioning Ta spare for Ta#52 | Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo
pumps started. |
10x |
602
|
Tuesday, August 15, 2017, 08:41 |
Aaron Schmidt | Ta#55 | LP-SIS | | | 42218-11 | 42738-2 | In progress | TBHT sight in test | Heat TGHT to 580 A & TGHT to
200 A for view port test.
Tuesday, August 15, 2017, 08:40: |
|
615
|
Friday, December 01, 2017, 14:31 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | Silver plated bolts test / Outgas TS | Chamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT. |
|
617
|
Tuesday, December 12, 2017, 08:32 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Pump down w/ possible outgas | Check achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in. |
|
618
|
Wednesday, December 20, 2017, 09:11 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Holiday Shut Down | Power/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07: |
|
623
|
Friday, January 26, 2018, 13:59 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 1 | Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06: |
|
624
|
Monday, January 29, 2018, 10:07 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Power outage / HV test 2 | HV test 2 cancelled. 9:38: BIAS/EZL/EE
@ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) |
|
625
|
Tuesday, January 30, 2018, 06:51 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 3 | Tuesday, January 30, 2018, 06:50: BIAS
/ EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: |
|
627
|
Wednesday, January 31, 2018, 12:58 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | HV test 4 | Wednesday, January 31, 2018, 12:53: Power/sources
on.
Wednesday, January 31, 2018, 12:58: |
|
648
|
Tuesday, March 13, 2018, 06:00 |
Aaron Schmidt | UC#22 | LP-SIS | ITE | TM4 | | | In progress | Conditioning Heat Shield for UC#22 | Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started. |
|
658
|
Wednesday, April 25, 2018, 09:50 |
Aaron Schmidt | Ta (test) | LP-SIS | | | 41177-3 | | In progress | Ta test and window change | Window changed on view port. Ta target
prepared for Aurelia's tests.
***Note*** No Ta window foils |
|
676
|
Friday, July 27, 2018, 14:44 |
Aaron Schmidt | UC#24 | LP-SIS | ITE | TM4 | 41177-3 | 42752-6 | In progress | Conditioning Heat Shield for UC#24 & voltage test prep | 4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing |
|
678
|
Tuesday, August 14, 2018, 11:03 |
Aaron Schmidt | | LP-SIS | | | 41177-3 | 42752-6 | | Voltage Tests (Ta target) | Tuesday, August 14, 2018, 10:55: Auto ramping
TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03: |
|
|