  512   Thursday, June 09, 2016, 14:56 Aaron Schmidt LP-SIS     TUBE ONLYThursday, June 09, 2016, 14:50: Begin roughing.
Thursday, June 09, 2016, 15:34: Turbo
pumps started.
 Tube_only_SIS_test.zip 
  514   Tuesday, June 14, 2016, 10:46 Aaron Schmidt LP-SIS     TUBE ONLY - NO PLASMA ELECTRODETuesday, June 14, 2016, 10:46: Begin roughing.
Tuesday, June 14, 2016, 11:16: Turbo
pumps started.
 Tube_only_SIS_test-all-160615.zip2016-06-13.zip2016-06-15.zipre-em-plots.zip 
  515   Thursday, June 16, 2016, 14:34 Aaron Schmidt LP-SIS     TUBE ONLY (3)Thursday, June 16, 2016, 14:33: Roughing.
Plasma Electrode re-attached. Salts replaced.
Thursday, June 16, 2016, 15:12: Turbo
 Tube_only-full-fernando_test-160617-PE-RPE.zipTube_only-full-fernando_test-160617-WPE.zip 
  547   Tuesday, October 18, 2016, 13:29 Aaron SchmidtTa#50LP-SISITETM441790-541751-1In progressConditioning Ta#50Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started.
 9x 
  549   Thursday, October 27, 2016, 13:37 Aaron SchmidtUC#18LP-SISITWTM2 41751-3In progressConditioning Heat shield for UC#18Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started.
 UC#18_Heat_shield_conditioning.docxTS-2016-10-27-16-00.rga 
  574   Friday, March 24, 2017, 14:43 Aaron SchmidtTa#51LP-SISITWTM241790-441751-5In progressConditioning Ta#51Friday, March 24, 2017, 15:40: Roughing.
Friday, March 24, 2017, 15:59: Turbo
pumps on.
 9x 
  592   Friday, June 09, 2017, 13:28 Aaron SchmidtTa#52LP-SISITETM442218-1441751-8In progressConditioning Ta#52Friday, June 09, 2017, 13:27: Roughing.
Friday, June 09, 2017, 14:09: Turbo
pumps on.
 8x 
  595   Thursday, July 06, 2017, 13:16 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressConditioning Ta spare for Ta#52Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo 
pumps started.
 10x 
  602   Tuesday, August 15, 2017, 08:41 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressTBHT sight in testHeat TGHT to 580 A & TGHT to 
200 A for view port test.
Tuesday, August 15, 2017, 08:40:
  
  615   Friday, December 01, 2017, 14:31 Aaron Schmidt LP-SIS  (Blank)42752-3In progressSilver plated bolts test / Outgas TSChamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT.
 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga 
  617   Tuesday, December 12, 2017, 08:32 Aaron Schmidt LP-SIS  (Blank)42752-3DonePump down w/ possible outgasCheck achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in.
 Empty_Chamber_-_Silver_bolts_removed.docxTS-2017-12-12-09-00.rgaTS-2017-12-13-06-50.rga 
  618   Wednesday, December 20, 2017, 09:11 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHoliday Shut DownPower/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07:
  
  623   Friday, January 26, 2018, 13:59 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 1Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06:
 2018_HV_test_1.docx 
  624   Monday, January 29, 2018, 10:07 Aaron Schmidt LP-SIS  (Blank)42752-3DonePower outage / HV test 2HV test 2 cancelled.  9:38: BIAS/EZL/EE
@ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly)
 2018_HV_test_2.docx 
  625   Tuesday, January 30, 2018, 06:51 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHV test 3Tuesday, January 30, 2018, 06:50: BIAS
/ EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52:
 2018_HV_test_3.docx 
  627   Wednesday, January 31, 2018, 12:58 Aaron Schmidt LP-SIS  (Blank)42752-3In progressHV test 4Wednesday, January 31, 2018, 12:53: Power/sources
on.
Wednesday, January 31, 2018, 12:58:
 2018_HV_test_4.docx 
  648   Tuesday, March 13, 2018, 06:00 Aaron SchmidtUC#22LP-SISITETM4  In progressConditioning Heat Shield for UC#22Tuesday, March 13, 2018, 08:50: Roughing.
Tuesday, March 13, 2018, 09:10: Turbo
Pumps started.
  
  658   Wednesday, April 25, 2018, 09:50 Aaron SchmidtTa (test)LP-SIS  41177-3 In progressTa test and window changeWindow changed on view port. Ta target
prepared for Aurelia's tests.
***Note*** No Ta window foils
 TS-2018-04-25-14-55.rgaTa_target_heating_test_-_Test_stand.docx 
  676   Friday, July 27, 2018, 14:44 Aaron SchmidtUC#24LP-SISITETM441177-342752-6In progressConditioning Heat Shield for UC#24 & voltage test prep4 Kapton wire routed into the 9-pin connector.
Unused pins are grounded on the bracket.
Friday, July 27, 2018, 14:25: Roughing
  
  678   Tuesday, August 14, 2018, 11:03 Aaron Schmidt LP-SIS  41177-342752-6 Voltage Tests (Ta target)Tuesday, August 14, 2018, 10:55: Auto ramping
TGHT @ 6 A per min to 40 A.
Tuesday, August 14, 2018, 11:03:
  