  900   Thursday, September 23, 2021, 07:16 Aaron Schmidt       Pump down empty chamber & rebootThursday, September 23, 2021, 07:15: Roughing.
Waterline loop installed.

Monday, September 27, 2021,
  
  901   Monday, October 04, 2021, 15:38 Aaron Schmidt LP-IG-LISITETM4 42132-7In progressConditioning UC#35 IG-LIS HSMonday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08:
TP1B on. 
 UC#35.docx 
  902   Wednesday, October 06, 2021, 11:56 Aaron Schmidt       Pump down empty chamberWednesday, October 06, 2021, 11:56: Roughing.

Thursday, October 14, 2021,
09:07: Venting.
  
  903   Thursday, October 14, 2021, 10:13 Aaron Schmidt LP-SISITWTM2 44378-22In progressConditioning UC#36 HSTube / TGHT only.
Thursday, October 14, 2021, 10:11:
Roughing.
 UC#36.docx 
  904   Wednesday, October 20, 2021, 15:01 Aaron Schmidt       Pump down empty chamberWednesday, October 20, 2021, 15:01: Roughing.   
  905   Thursday, November 04, 2021, 11:55 Fernando Maldonado      DoneOpening vacuum chamber for thesis pictures :pThursday, November 04, 2021, 11:54: Venting
water loop removed
Thursday, November 04, 2021, 13:39:
  
  907   Tuesday, November 16, 2021, 13:45 Aaron Schmidt       Pump down empty chamberTuesday, November 16, 2021, 13:44: Roughing.
Water loop installed. Lock out tag removed.
  
  908   Tuesday, December 21, 2021, 13:34 Aaron Schmidt LP-SIS  44691-844378-6In progressSalts test HS & Holiday ShutdownLP-SIS modified w/ 2 holes on the center
block to accept a pair of Ta tubes that are
run to the coil PS.
  
  909   Tuesday, January 04, 2022, 13:00 Aaron Schmidt       Post water leak December 30th, 2021: Water poured
down around Isac test stand and probes lab
  
  910   Wednesday, January 05, 2022, 15:12 Carla Babcock       Modifications to test stand for mass marker testsConnection of TBHT negative to HV common
removed (R4 in circuit diagram). Labelled
and put in MRO bucket.
  
  911   Wednesday, January 12, 2022, 16:12 Carla Babcock       Ramp up of the mass marker targetWednesday, January 12, 2022, 16:08 : HV
ramped to 30kV, EZL=15kV, EE=-1.5kV
Ramping up to 250A on TGHT, 200A
 133CssettingsJan132022.PNG23NasettingsJan132022.PNG23NasettingsJan172022-source.PNG23NasettingsJan172022-beamline.PNG 
  912   Monday, February 28, 2022, 08:08 Aaron Schmidt LP-SIS     Mass marker / Coil-Tube target Test #2Installed & roughing Friday. 
Monday, February 28, 2022, 08:07:
Turbopump TP1B on.
  
  913   Monday, March 21, 2022, 13:59 Carla Babcock       3rd mass marker test3rd version of the mass marker target has
been installed. This one is further back
on the heat shield, and has a longer ceramic
  
  914   Monday, April 04, 2022, 20:44 Carla Babcock       Change from 9-pin connectors to 5-pin connectorsSwapped the old 9pin connectors out and
replaced with 2 5-pin connectors, same as
on the modules.
 5pin_pinout_April42022.png 
  915   Monday, April 04, 2022, 20:56 Carla Babcock       wiring reverted for cathode-bias FEBIADWiring which was changed to run the mass
marker tests has been reverted:

    anode bias cable connected
  
  918   Monday, April 11, 2022, 14:52 Aaron Schmidt      Problems/SolutionsTP6 controller Monday, April 11, 2022, 13:58: Controller
for TP6 is dead. Literally smokes if you
try to use it.
  
  919   Wednesday, April 13, 2022, 07:46 Aaron Schmidt      Problems/SolutionsWater leakWednesday, April 13, 2022, 07:38: Appears
to have a water leak. Vacuum @ 8.48e-06T.
All power / sources shut off. (Had already
  
  920   Wednesday, April 20, 2022, 13:42 Aaron Schmidt       Vent Beamline halfAurelia to do a visual test later.
Wednesday, April 20, 2022, 13:41:
IG6 Off. TP6 & TP2 off.
  
  921   Thursday, April 21, 2022, 13:38 Aaron Schmidt      Problems/SolutionsLeak checkshttps://elog.triumf.ca/TIS/Test-Stand/919
Vacuum Group LD#1
(A) Top feed through fittings upgraded
  
  922   Monday, May 02, 2022, 14:10 Aaron Schmidt P2N-SIS     Empty Chamber PS test.No P2N is loaded. Testing the power supplies.
Tuesday, May 03, 2022, 10:07
In the past few days, the ITS has
  