ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
923
|
Thursday, May 05, 2022, 14:43 |
Aaron Schmidt | | P2N-SIS | | | 45241-1 | 45240-1 | In progress | P2N assembly conditioning. | Thursday, May 05, 2022, 14:43: Roughing.
Open BV1B
Thursday, May 05, 2022, 14:46: Upper |
|
924
|
Monday, May 09, 2022, 10:08 |
Luca Egoriti | | P2N-SIS | ITE | TM4 | | | In progress | P2N heating test | Beginning of May:
The cabling on the top of the test
stand was changed to adapt for P2N testing. |
|
925
|
Tuesday, May 10, 2022, 10:09 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 45241-1 | 45240-1 | In progress | P2N assembly conditioning - 2 | Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed |
|
926
|
Wednesday, May 11, 2022, 10:05 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | | P2N assembly conditioning - 3 | Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on |
|
927
|
Thursday, May 12, 2022, 10:50 |
Aaron Schmidt | | P2N-SIS | ITE | TM4 | 44812-2 | 45240-1 | In progress | P2N assembly conditioning - 4 | PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing. |
|
929
|
Friday, May 27, 2022, 07:19 |
Fernando Maldonado | | | | | | | Done | FEBIAD parameter scan web-app and brief description (with links) | A web-app for systematic FEBIAD parametrizations
has been develop and now includes the
ISAC Test Stand (ITS) : |
|
933
|
Monday, June 20, 2022, 11:49 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Monday, June 20, 2022, 11:49: Water line
loop installed. Roughing.
Thursday, June 23, 2022, |
|
935
|
Thursday, June 30, 2022, 13:50 |
Aaron Schmidt | | | | | | | | Pump down empty chamber | Thursday, June 30, 2022, 13:46: Roughing.
Thursday, July 07, 2022,
15:00: Venting. |
|
936
|
Thursday, July 07, 2022, 16:52 |
Aaron Schmidt | | LP-IG-LIS | ITW | TM2 | | 42132-3 | In progress | Conditioning UC#39 assembly | No UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing. |
|
937
|
Sunday, July 10, 2022, 22:19 |
Aaron Schmidt | | | | | | | Problems/Solutions | TP2 Trip / TMS:RP2 issue | Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps |
|
938
|
Monday, July 11, 2022, 09:17 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Monday, July 11, 2022, 09:15: Roughing. |
|
939
|
Tuesday, August 30, 2022, 13:58 |
Aaron Schmidt | | | | | 44062-7 | 44378-25 | In progress | Conditioning UC#40 assembly | Conditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only). |
|
941
|
Thursday, September 29, 2022, 13:50 |
Aaron Schmidt | | | | | | | In progress | Pump down empty chamber | Water loop installed.
Thursday, September 29, 2022, 13:50:
Roughing |
|
943
|
Wednesday, October 19, 2022, 12:16 |
Aaron Schmidt | | | | | | | | Test Stand controls changed | genepicsas.triumf.ca
x11 enabled.
Then use login credentials. |
|
945
|
Tuesday, November 15, 2022, 15:32 |
Sam Gupta | | | | | | | | ATTS tantalum Bracket Heating test | Heated up sample 01 for the second time
and measured the temperature with increasing
current. Used pyrometre to measure temperature |
|
946
|
Wednesday, November 16, 2022, 13:28 |
Aaron Schmidt | | | | | | | Problems/Solutions | TSG:TP1A Replaced | See elog 944
Wednesday, November 16, 2022, 13:23:
TP1 A replaced |
|
947
|
Wednesday, November 23, 2022, 13:52 |
Aaron Schmidt | | | | | | 44378-14 | In progress | FEBIAD Coil Tests | Sam G. & Navid N.
Work Permit# C2022-11-23--1
Wednesday, November 23, 2022, 13:51 |
|
948
|
Monday, December 05, 2022, 15:41 |
Aaron Schmidt | | | | | | | | Source tray insulator replacement | Monday, December 05, 2022, 15:38:
Source Tray TGHT & TBHT insulators replaced.
Torqued @ 75 in-lbs. (Reference image |
7x |
949
|
Tuesday, December 06, 2022, 11:20 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Tests | Thermocouples installed:
O - O
O - Anode |
|
950
|
Tuesday, December 13, 2022, 16:12 |
Aaron Schmidt | | HP-FEBIAD-CTL | | | 43104-2 | 45235-12 | In progress | New anode routed FEBIAD Test - 2 | Thermocouples installed (X):
O - O
O - Anode |
|