  778   Tuesday, January 21, 2020, 13:45 Aaron Schmidt      Problems/SolutionsRGA Communications errorTuesday, January 21, 2020, 13:42: The RGA
was unable to connect. Typically connects
on COM4, however it did not register. RGA
  
  781   Thursday, January 30, 2020, 15:25 Aaron SchmidtC(#1)LP-SIS  43044-843515-3In progressConditioning C(#1) HSWas for UC# 32* - Schedule change, now
for C#1
Thursday, January 30, 2020, 15:13:
 C#1_-_Short.docx 
  782   Friday, February 07, 2020, 14:02 Aaron SchmidtC#(1)LP-SIS  43044-843515-3In progressConditioning C#(1) HSWas for UC# 32* - Schedule change, now
for C#1* - Last HS conditioning revealed
a TGHT to HS lid short. Milled the lid back
 C#1_-_2.docx 
  783   Tuesday, February 11, 2020, 14:27 Aaron Schmidt       Pump down empty ChamberTuesday, February 11, 2020, 14:27: UC#32
HS removed.
Tuesday, February 11, 2020, 14:27:
  
  784   Wednesday, February 12, 2020, 11:04 Aaron Schmidt LP-SIS  41790-943515-1In progressConditioning HSUsing a broken LP-FEBIAD oven for out gassing.
Tentative UC#31*
Wednesday, February 12, 2020, 10:57:
 UC#31.docx 
  785   Thursday, February 20, 2020, 11:41 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing Ta#60 (Unconditioned) - Salts in.
Thursday, February 20, 2020, 14:04:
Roughing.
 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx 
  786   Thursday, February 27, 2020, 07:20 Aaron Schmidt       FS#3 - Fitting change outThursday, February 27, 2020, 07:10: Swapped
out an old brass fitting on the supply line
going into FS#3 - Line K. 
  
  787   Monday, March 02, 2020, 14:42 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressFull TS testing w/ HV using Ta#60Monday, March 02, 2020, 14:36: Roughing.
Monday, March 02, 2020, 15:08: Turbo
pumps on.
  
  789   Wednesday, March 11, 2020, 13:31 Aaron SchmidtTa#60LP-SIS  44139-1343515-5In progressTa#60 w/ EE testing - 2Thermocouples installed on EE. Double checked
continuity & used a heat gun.
Wednesday, March 11, 2020, 13:30:
 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx 
  790   Tuesday, March 17, 2020, 11:40 Aaron SchmidtSiC#40HP-SISITWTM242218-843515-8In progressConditioning SiC#40Tuesday, March 17, 2020, 11:37: Roughing.
FS# 3 re-connected. All waterlines
re-opened except FS#5 (HS cooling).
 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx 
  791   Friday, March 27, 2020, 11:30 Aaron Schmidt       Vacuum loss / spike / ShutdownThe ISAC was left with the turbo pumps
and water supplies running. Just the power
supplies off. Monday, March, 23, 2020.
 Mar_27_-_2020_-_Vacuum_Trip.docx 
  793   Tuesday, May 19, 2020, 06:01 Aaron Schmidt     42972-8Problems/SolutionsLeak check / Troubleshoot https://elog.triumf.ca/TIS/Test-Stand/791
 May_19-20_Leak_check_-_FS#3.docxMess_inside_TS_-_1.jpgMess_inside_TS_-_2.jpgBlock_water_leak_visible.jpg 
  794   Wednesday, June 10, 2020, 08:23 Aaron SchmidtC#1LP-SISITWTM243044-843515-3In progressConditioning C#1Salts: 
Li - 10 uL
Na - 10 uL
 7x 
  795   Tuesday, June 16, 2020, 11:03 Aaron SchmidtTa#60LP-SISITWTM244139-1343515-5In progressConditioning Ta#60 Tuesday, June 16, 2020, 11:01: Turbo pumps
on.

Wednesday, June 17, 2020,
 Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt 
  796   Monday, June 22, 2020, 07:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressTest FEBIAD (Fernando)Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
 FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt 
  800   Monday, July 13, 2020, 14:52 Aaron Schmidt LP-FEBIAD  41790-943515-2 UCx HS conditioning. Broken LP-FEBIAD used to out gas.
Monday, July 13, 2020, 14:52: Roughing.
Monday, July 13, 2020, 15:29: Turbo
  
  801   Monday, July 20, 2020, 11:40 Aaron Schmidt(Empty-Test)   44160-143822-2In progressConditioning Test P2NSalts added: 
Cs - 15 uL
Li - 10 uL
 P2N_-_1_-_July-20-22-2020.docx 
  803   Tuesday, July 28, 2020, 13:27 Aaron Schmidt      Problems/SolutionsWater leak on magnet PS Fault: 13334
  
  804   Tuesday, August 04, 2020, 15:07 Aaron SchmidtUCxLP-SIS  44139-1043515-4In progressUCx HS conditioning with PEEK assembly Tuesday, August 04, 2020, 15:04:
Roughing.

Wednesday, August 05, 2020,
 UCx_-_HS_w-PEEK_Assy_-_43515-4.docx 
  805   Wednesday, August 05, 2020, 10:01 Aaron Schmidt      Problems/SolutionsRoughing pump swap out.Wednesday, August 05, 2020, 10:00: TP6
& TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20:
  