Entry  Friday, November 08, 2019, 14:21, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-9, In progress, Nitrogen Bottle leak test 

Friday, November 01, 2019, 14:00: Nitrogen bottle installed. Purged waterlines HS / FS#5. Purge done in conjunction with SiC#38

4.8 Purity

35-40 PSI pressure.

Successfully purged the line after 5 minutes.


Friday, November 08, 2019, 14:16: Begin FS#5 waterline purge w/ Nitrogen. Purge done in conjunction with UC#30 HS & assy.

4.8 Purity

12-14 PSI line pressure.

2500 PSI bottle pressure.

Full stream for a minute or so, then purged lightly. Drops / mist outgoing.

Friday, November 08, 2019, 14:24: Line Pressure at 10-11 PSI, brought back up to 14 PSI.

2400 PSI bottle pressure. Water / mist outgoing still.

Friday, November 08, 2019, 14:31: No water appears on line with purge.

Approx 2350 PSI bottle pressure.

Line pressure increased to 40 PSI. No water appeared on the purge line.

Friday, November 08, 2019, 14:34: Purge complete. 14 PSI appears successful.

Entry  Friday, November 15, 2019, 10:35, Aaron Schmidt, , , , , , , , Pump down empty Chamber 

Friday, November 15, 2019, 09:35: Roughing.

Friday, November 15, 2019, 10:34: Turbo pumps on.


Wednesday, November 20, 2019, 09:19: Turbo pumps off. Ion gauge off.

Wednesday, November 20, 2019, 11:20: Roughing. U-Line removed from HS waterline. Blanks installed. Do not open HS waterline.

 

Entry  Friday, December 20, 2019, 07:59, Aaron Schmidt, , , , , , , , Holiday TS shut down 

Friday, December 20, 2019, 07:58: Turn off ion gauges. Shut off turbo pumps TP6, TP2, TP1A, & TP1B. Close backing valves.

Friday, December 20, 2019, 08:06: PV1 & PV2 off. RP1 & RP2 off.


Monday, January 06, 2020, 09:35: Restarting TS. RP1 & RP2 on. (BIAS PS upgraded / Note: https://elog.triumf.ca/TIS/Test-Stand/776 ). No HV as yet.

Monday, January 06, 2020, 09:37: Turbo pumps (TP6, TP2, TP1A, & TP1B) on.

Monday, January 06, 2020, 09:42: Ion gauges on (IG1 & IG6).


Monday, January 20, 2020, 08:17: Ion gauge. Turbos pumps off.

Monday, January 20, 2020, 10:26: Venting.

Entry  Tuesday, January 21, 2020, 09:38, Aaron Schmidt, SiC#40, LP-SIS, , , 43044-8, 43515-8, In progress, Conditioning SiC#40 HS SiC#40.docxSiC#40_-_HS_Out_gassing.docxTS-2020-01-21-11-10.rga

Was intended for UC#31 - Now used for SiC#40*

PEEK SEAL Test piece attached.

Tuesday, January 21, 2020, 09:34: BV1A open Roughing.

Tuesday, January 21, 2020, 09:38: BV1B open.

Tuesday, January 21, 2020, 10:05: Turbo pumps on.

Tuesday, January 21, 2020, 10:10: Ion gauge on.


Monday, January 27, 2020, 07:07: PS / Sources on. Waterlines already opened.

Monday, January 27, 2020, 07:10: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Tuesday, January 28, 2020, 14:45: Auto-Cooling @ 2 A per min.


Thursday, January 30, 2020, 11:31: PS / Source off.

Thursday, January 30, 2020, 11:33: IG1 off. Turbos off.

Thursday, January 30, 2020, 13:00: Venting.

Entry  Tuesday, January 21, 2020, 13:45, Aaron Schmidt, , , , , , , Problems/Solutions, RGA Communications error 

Tuesday, January 21, 2020, 13:42: The RGA was unable to connect. Typically connects on COM4, however it did not register. RGA Offline.

Brought in a separate RGA. Was able to connect & see the 2nd RGA ID on COM4. Removed 2nd RGA.

We likely need to replace / repair our communication chip again.


Wednesday, January 22, 2020, 13:21: The chip was replaced and the RGA reinstalled, however, the RGA is still no connecting on COM4.

Entry  Thursday, January 30, 2020, 15:25, Aaron Schmidt, C(#1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C(#1) HS C#1_-_Short.docx

Was for UC# 32* - Schedule change, now for C#1

Thursday, January 30, 2020, 15:13: Roughing.

Thursday, January 30, 2020, 15:46: Turbo pumps on.

 Thursday, January 30, 2020, 15:50: IG1 on.


Friday, January 31, 2020, 08:14: Waterlines opened. No Vacuum response. Vacuum ok @ 6.10e-07T.

Friday, January 31, 2020, 08:16: Power / sources on

Friday, January 31, 2020, 08:18: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.


Monday, February 03, 2020, 12:56: Auto-cooling @ 2 A per min. 


Wednesday, February 05, 2020, 09:07: Power / sources off. Waterlines purged. IG1 & turbo pumps off.


Friday, February 07, 2020, 11:45:

Short was found on the HS Lid from the TGHT on the left. Milled out 1/8" off both HS lid / TGHT gaps. Lots of clearance now. Reheat req'd.

Entry  Friday, February 07, 2020, 14:02, Aaron Schmidt, C#(1), LP-SIS, , , 43044-8, 43515-3, In progress, Conditioning C#(1) HS C#1_-_2.docx

Was for UC# 32* - Schedule change, now for C#1* - Last HS conditioning revealed a TGHT to HS lid short. Milled the lid back 1/8" - Aaron S.

Friday, February 07, 2020, 14:00: Roughing.

Friday, February 07, 2020, 14:33: Turbo pumps on.

Friday, February 07, 2020, 14:38: IG1 on.


Monday, February 10, 2020, 07:39: HS waterlines opened. Vacuum ok @ 4.12e-07T.

Monday, February 10, 2020, 07:41: Power / sources on.

Monday, February 10, 2020, 07:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Monday, February 10, 2020, 13:01: Heating appears ok. No voltage abnormalities or short.

Monday, February 10, 2020, 13:02: Auto-Cooling @ 1 A per min.


Tuesday, February 11, 2020, 06:39: Power / Sources off.

Tuesday, February 11, 2020, 06:40: Waterlines purged. Nitrogen bottle @ 2100 PSI approx.

Tuesday, February 11, 2020, 06:42: IG1 off. Turbo pumps off.

Tuesday, February 11, 2020, 09:59: Venting.

 

Entry  Tuesday, February 11, 2020, 14:27, Aaron Schmidt, , , , , , , , Pump down empty Chamber 

Tuesday, February 11, 2020, 14:27: UC#32 HS removed.

Tuesday, February 11, 2020, 14:27: Roughing.


Wednesday, February 12, 2020, 09:05: Venting.

Entry  Wednesday, February 12, 2020, 11:04, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-1, In progress, Conditioning HS UC#31.docx

Using a broken LP-FEBIAD oven for out gassing. Tentative UC#31*

Wednesday, February 12, 2020, 10:57: Roughing.

Wednesday, February 12, 2020, 11:30: Turbo pumps on.


Thursday, February 13, 2020, 07:19: Waterlines opened. Vacuum ok @ 6.91e-07T.

Thursday, February 13, 2020, 07:22: Power / Sources on. TGHT only.

Thursday, February 13, 2020, 07:25: Auto-ramping TGHT @ 2A per min to 580 A.


Friday, February 14, 2020, 14:03: Auto-cooling @ 1 A per min.


Thursday, February 20, 2020, 07:33: PS, sources off, locked out.

Thursday, February 20, 2020, 07:34: Turbo pumps & IG1 off.

Thursday, February 20, 2020, 07:35: Waterlines purged. Nitrogen Bottle around 2050 PSI.

Thursday, February 20, 2020, 09:22: Venting.

 

Entry  Thursday, February 20, 2020, 11:41, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing 20200221_134828.jpg20200221_134939.jpgTa#60_-_TS_Pre-condition_-_EE_test_-_1.docx

 Ta#60 (Unconditioned) - Salts in.

Thursday, February 20, 2020, 14:04: Roughing.

Thursday, February 20, 2020, 14:38: Turbo pumps on (Leak check in am).

Thursday, February 20, 2020, 14:43: IG1 on.


Friday, February 21, 2020, 06:36: Waterlines opened. No vacuum response. Vacuum ok @ 8.69e-07T.

Friday, February 21, 2020, 06:38: Turbo pumps off.

EE Thermocouples req'd.

Friday, February 21, 2020, 11:15: Vented.

9-pin removed. Thermocouples installed.

Friday, February 21, 2020, 13:52: Roughing.

Friday, February 21, 2020, 14:24: Turbo pumps on.


EE Waterline - On

Wednesday, February 26, 2020, 07:40: Waterlines re-opened. Vacuum ok. @ 3.51e-07T

Wednesday, February 26, 2020, 07:43: Power / sources on.

Wednesday, February 26, 2020, 07:45: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 150 A.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
 250 / 150 20.8 24.0
 350 / 200 22.5

29.7

 450 / 230 20.1 30.9
 580 / 230 14.5 28.8
580 / 230 @ 2:52 pm 6.2 21.6

Wednesday, February 26, 2020, 09:52: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Wednesday, February 26, 2020, 11:04: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Wednesday, February 26, 2020, 11:57: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Wednesday, February 26, 2020, 13:03: TGHT / TBHT @ 580 / 230 A.

Wednesday, February 26, 2020, 14:52: Temp check (thermocouple reversed on T1?)

Wednesday, February 26, 2020, 14:54: Auto-cooling @ 2A per min.


Thursday, February 27, 2020, 06:30: Power/sources off, locked out. FS#3 purged. Cage open.

Thursday, February 27, 2020, 07:20: Line K (EE) disconnected from FS#3. Old fitting swapped for new one. See https://elog.triumf.ca/TIS/Test-Stand/786.

No water/cooling running into EE.

Thursday, February 27, 2020, 07:26: All waterlines open. Vacuum ok.

Thursday, February 27, 2020, 07:28: Power / Sources on.

 TGHT / TBHT Current (A) EE Temp (A - T1 - Upper left)
[C]
EE Temp (B - T4 - Lower right)
[C]
0 / 0 22.8 22.9
 50 / 25 22.6 22.7
100 / 50 22.6

22.6

150 / 100 22.2 23.3
200 / 150 22.0 24.9
200 / 150 7am Day 2 21.2 23.9
250 / 200 23.3 29.3
300 / 230 22.4 30.6
350 / 230 19.2 27.7
450 / 230 18.5 29.7
580 / 230 13.4 27.3

Thursday, February 27, 2020, 07:35: Auto ramping TGHT / TBHT @ 2 A per min to 50 / 25 A.

Thursday, February 27, 2020, 08:00: Auto ramping TGHT / TBHT @ 2 A per min to 100 / 50 A.

Thursday, February 27, 2020, 08:56: Auto ramping TGHT / TBHT @ 2 A per min to 150 / 100 A.

Thursday, February 27, 2020, 10:29: Auto ramping TGHT / TBHT @ 2 A per min to 200 / 150 A.


Friday, February 28, 2020, 06:56: Auto ramping TGHT / TBHT @ 2 A per min to 250 / 200 A.

Friday, February 28, 2020, 07:38: Auto ramping TGHT / TBHT @ 2 A per min to 300 / 230 A.

Friday, February 28, 2020, 09:54: Auto ramping TGHT / TBHT @ 2 A per min to 350 / 230 A.

Friday, February 28, 2020, 13:20: Auto ramping TGHT / TBHT @ 2 A per min to 450 / 230 A.

Friday, February 28, 2020, 14:15: Auto ramping TGHT / TBHT @ 2 A per min to 580 / 230 A.

Friday, February 28, 2020, 15:42: Last temperature measurement Taken. TGHT / TBHT @ 580 / 230 A.

Friday, February 28, 2020, 15:44: Auto-cooling @ 2A per min.


Monday, March 02, 2020, 07:37: Power / Sources off. Waterlines purged (A little over 2000 PSI left in the N Bottle)

Monday, March 02, 2020, 07:38: IG1 & Turbo pumps off.

Entry  Thursday, February 27, 2020, 07:20, Aaron Schmidt, , , , , , , , FS#3 - Fitting change out 

Thursday, February 27, 2020, 07:10: Swapped out an old brass fitting on the supply line going into FS#3 - Line K.

Replaced w/ SS fitting for interchangeability w/ other lines in case a bypass is needed.

Entry  Monday, March 02, 2020, 14:42, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Full TS testing w/ HV using Ta#60 

Monday, March 02, 2020, 14:36: Roughing.

Monday, March 02, 2020, 15:08: Turbo pumps on.


Remove HV cage (top). Reroute FS#3 back to cool EE

Tuesday, March 03, 2020, 08:11: Waterlines open. Vacuum ok @ 6.52e-07T.

HV cage top on. Data Logger removed. Wiring grounded.

Tuesday, March 03, 2020, 09:00: Power / sources / HV on.

Tuesday, March 03, 2020, 09:03: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.65 4.38
 TBHT 25.50

6.97

 COIL + EE 25.39 1.06
 TGHT 25.82 5.84

Tuesday, March 03, 2020, 09:08: BIAS / EE / EZL on.

Tuesday, March 03, 2020, 09:11: BIAS / EE / EZL @ 10 / 7.5 / -1 kV.

Tuesday, March 03, 2020, 09:15: BIAS / EE / EZL @ 20 / 12.5 / -1.5 kV. Read back on PS same / ok.

Tuesday, March 03, 2020, 09:17: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

Tuesday, March 03, 2020, 09:18: IV4 Opened.

Tuesday, March 03, 2020, 09:24: Optics on / set.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 11:32: Auto-ramping TGHT / TBHT to 500 / 200 A @ 4 A per min.

One spark noted. Reset optics.

Tuesday, March 03, 2020, 12:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

FM

Tuesday, March 03, 2020, 18:30: BIAS/EE/EZL @ 0 kV.

Tuesday, March 03, 2020, 18:31: TGHT / TBHT to 400 / 200 A @ 4 A per min.

Nothing observed on the emittance scan regardless of the tune


Wednesday, March 04, 2020, 09:09:  Auto-ramping TGHT / TBHT to 500 / 210 A @ 4 A per min. 

Wednesday, March 04, 2020, 10:47:  Auto-ramping TGHT / TBHT to 580/ 230 A @ 4 A per min. 

*Got busy in the morning, starting later than expected

Wednesday, March 04, 2020, 13:47: BIAS / EE / EZL @ 30 / 12.5 / -1.5 kV.

*Seminar at 2:30 I'll continue later

Wednesday, March 04, 2020, 16:08: Emittance rig troubleshoot (see e-log 778)

Wednesday, March 04, 2020, 19:00: BIAS/EE/EZL @ 0 kV.

Wednesday, March 04, 2020, 19:09: TBHT to 200A to try preserver some salts for tomorrow tests


Friday, March 06, 2020, 17:50: Auto-cooling 4 A/min .


Monday, March 09, 2020, 12:08: IV4 closed

Monday, March 09, 2020, 12:08: IG1 Off.

Monday, March 09, 2020, 12:09: Turbos off

Monday, March 09, 2020, 16:19: Venting

Entry  Wednesday, March 11, 2020, 13:31, Aaron Schmidt, Ta#60, LP-SIS, , , 44139-13, 43515-5, In progress, Ta#60 w/ EE testing - 2 Ta#60_-_TS_Pre-condition_-_EE_Test_-_2.docx

Thermocouples installed on EE. Double checked continuity & used a heat gun.

Wednesday, March 11, 2020, 13:30: Roughing.

Wednesday, March 11, 2020, 15:03: Turbo pumps on, interlocks by-passed (No water at the moment) 

Wednesday, March 11, 2020, 15:10: IG1 on.


Thursday, March 12, 2020, 06:08: Vacuum @ 2.33e-06T. Opening waterlines.

 Thursday, March 12, 2020, 06:11: Waterlines all open. Vacuum Stable @ 2.31e-06T

Thursday, March 12, 2020, 06:13: Bypass on TP1A & B removed.

Thursday, March 12, 2020, 06:18: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 06:20: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 07:34: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 08:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:30: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 08:55: Ramping aborted. TGHT / TBHT @ 488 / 230 A. Vacuum limit reached at 3.30e-06T.

Thursday, March 12, 2020, 08:56: Vacuum limit increased to 5.0e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 09:27: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

W/ Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 17.7 17.8
250 / 150 26.4 28.1
350 / 200 34.1

39.0

450 / 230 41.4 48.0
580 / 230 43.1 49.0

Thursday, March 12, 2020, 09:31: Auto-cooling @ 6A per min.

Thursday, March 12, 2020, 11:09: PS off. Lock up. Remove HV cage for FS#3 EE route & water purge.

Thursday, March 12, 2020, 11:27: PS on. Locks off. FS#3 re-routed (K line - EE isolated). Water on. Vacuum ok @ 2.07e-06T

W/O Water cooling on EE

 TGHT / TBHT Current (A) EE Temp (A - T1 - Red/Black wire - 1,2)
[C]
EE Temp (B - T2 - White/Black wire 8,9)
[C]
0 / 0 15.5 15.6
250 / 150 26.6 27.6
350 / 200 35.0

38.9

450 / 230 42.6 48.1
580 / 230 46.3 51.9
580 / 230 @ 2:41 pm 43.3 49.3

Thursday, March 12, 2020, 11:28: Power / Sources on TGHT / TBHT @ 0 / 0 A.

Thursday, March 12, 2020, 11:29: Auto-ramping TGHT / TBHT to 250 / 150 A @ 4 A per min.

Thursday, March 12, 2020, 12:33: Auto-ramping TGHT / TBHT to 350 / 200 A @ 4 A per min.

Thursday, March 12, 2020, 13:02: Auto-ramping TGHT / TBHT to 450 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 13:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Thursday, March 12, 2020, 14:11: TGHT / TBHT @ 580 / 230 A. Temperatures recorded.

Thursday, March 12, 2020, 14:41: Auto-cooling @ 4A per min.


Tuesday, March 17, 2020, 05:26: IG1 & turbo pumps off. Water lines closed for FS#3 & HS.

Tuesday, March 17, 2020, 05:31: Waterlines FS#5 & FS#3 purged.

Tuesday, March 17, 2020, 07:08: Venting.

Entry  Tuesday, March 17, 2020, 11:40, Aaron Schmidt, SiC#40, HP-SIS, ITW, TM2, 42218-8, 43515-8, In progress, Conditioning SiC#40 SiC#40_-_Conditioning.docxER-580-230-30kV-m7.txtER-580-230-30kV-m23.txtER-580-230-30kV-m38.txtITW-TM2-SiC#40-HP-SIS_Test_Stand.docx

Tuesday, March 17, 2020, 11:37: Roughing.

FS# 3 re-connected. All waterlines re-opened except FS#5 (HS cooling).

Tuesday, March 17, 2020, 12:08: Turbo pumps on.

Tuesday, March 17, 2020, 12:13: IG1 on.


Wednesday, March 18, 2020, 04:31: Waterlines open. Vacuum ok @ 8.45e-07T.

Wednesday, March 18, 2020, 04:37: HV rack / 9-pin grounded.

Wednesday, March 18, 2020, 04:40: Power / Sources on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 24.42 4.04
 TBHT 24.39

6.72

 COIL + EE 24.21 1.63
 TGHT  24.30 5.76

Wednesday, March 18, 2020, 04:43: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.

Wednesday, March 18, 2020, 04:51: BIAS / EE / EZL @ 30 / -1.5 / 12.5 kV.

Wednesday, March 18, 2020, 04:52: Optics on / set. IV4 open.

Wednesday, March 18, 2020, 07:45: Fluctuation noticed on BIAS. No audible sparks. Conditioning.

Wednesday, March 18, 2020, 07:47: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, March 18, 2020, 09:44: EZL Increased to 13 kV.

Wednesday, March 18, 2020, 09:51: Reset MB1 manually. Ok.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.76 5.00
 TBHT 25.49

7.61

 COIL + EE 25.35 2.04
 TGHT  25.32 6.14

Wednesday, March 18, 2020, 10:57: Mass, wire, & emittance scans complete.


Thursday, March 19, 2020, 11:41: Auto-cooling @ 1 A per min.

Thursday, March 19, 2020, 11:46: BIAS / EE / EZL @ 0 kV.


Monday, March 23, 2020, 05:15: IV4 closed / reset. 

Monday, March 23, 2020, 05:17: Power / sources off.

 

Entry  Friday, March 27, 2020, 11:30, Aaron Schmidt, , , , , , , , Vacuum loss / spike / Shutdown Mar_27_-_2020_-_Vacuum_Trip.docx

The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.

Check daily


Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.


Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip. 

Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)

Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.

Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.


Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.


Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T. 


Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.


Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.


Friday, April 03, 2020, 05:05: Vacuum @ 9.213T. 


Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T. 


Tuesday, April 28, 2020, 11:11: Venting. 

Entry  Tuesday, May 19, 2020, 06:01, Aaron Schmidt, , , , , , 42972-8, Problems/Solutions, Leak check / Troubleshoot May_19-20_Leak_check_-_FS#3.docxMess_inside_TS_-_1.jpgMess_inside_TS_-_2.jpgBlock_water_leak_visible.jpg

 https://elog.triumf.ca/TIS/Test-Stand/791

https://elog.triumf.ca/TIS/Test-Stand/792

Tuesday, May 19, 2020, 06:01: Venting. 

Troubleshoot / Leak Check ISAC TS.

Tuesday, May 19, 2020, 06:35: Quite a bit of condensation was found inside the TS. Most lines had water on them.

Tuesday, May 19, 2020, 07:09: Wiped out the interior. Running a fan inside to aid in the drying.

Tuesday, May 19, 2020, 08:20:

Opened lines FS#2,3,4. No visual leaks detected.

Installed previously used/outgassed HS (Ferran's tests). Replaced all the bolts.

Roughing.

Tuesday, May 19, 2020, 08:32: Multiple attempts made to rough. Doors not sealing?

Tuesday, May 19, 2020, 08:58: IT FINALLY SEALED!!! (Assistance was provided on the doors)

Tuesday, May 19, 2020, 09:02: BV1B Open.

Tuesday, May 19, 2020, 10:54: Vacuum @ 15.339 T.

Tuesday, May 19, 2020, 10:59: FS#2 opened.

Tuesday, May 19, 2020, 11:02: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:03: FS#3 opened.

Tuesday, May 19, 2020, 11:06; Vacuum @ 15.069 T

Tuesday, May 19, 2020, 11:07: FS#4 opened.

Tuesday, May 19, 2020, 11:10: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:11: FS#5 Opened.

Tuesday, May 19, 2020, 11:13: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:30: Close & purge cooling lines. Observe Vacuum.


Left open overnight. Ran the fan on it this morning.

All water lines into the TS closed. FS# 2,3,4,5, & 8.

Wednesday, May 20, 2020, 08:35: Roughing.

Wednesday, May 20, 2020, 08:50: BV1B open. Vacuum at 8 T and dropping.

Wednesday, May 20, 2020, 10:12: Vacuum at 2.635 T.

Wednesday, May 20, 2020, 10:14: FS#2 opened.

Wednesday, May 20, 2020, 10:17: Vacuum @  2.646 T.

Wednesday, May 20, 2020, 10:19: FS#3 opened.

Wednesday, May 20, 2020, 10:24: Vacuum @ 2.764  T

Wednesday, May 20, 2020, 10:25: FS#4 opened.

Gradual increase is noted, but no obvious spike.

Wednesday, May 20, 2020, 10:28: Vacuum @  2.816 T.

Wednesday, May 20, 2020, 10:32: Vacuum @ 3.606 T.

Starting to spike.

Wednesday, May 20, 2020, 10:36: Closed supply / return. Purged. Closed the lines Vacuum @  4.173 T.

Wednesday, May 20, 2020, 10:54: Vacuum @ 3.984 T.

Wednesday, May 20, 2020, 10:58: FS#2 opened.

Wednesday, May 20, 2020, 11:10: Vacuum @ 3.858 T.

Wednesday, May 20, 2020, 11:11: FS#3 opened. Vacuum spiking 4.3T +

Wednesday, May 20, 2020, 11:15: Closed supply / return. Purged. Closed the lines Vacuum @  4.614 T.

Wednesday, May 20, 2020, 11:47: Venting.

Wednesday, May 20, 2020, 13:12: Significant leak discovered on FS#3. Pressurized the lines to full pressure with water and waited 15 minutes. Small drops seen pushing out from the water block.

Removed old O-ring (Appeared to have a warp/bulge, very faint) Replaced with Sn C-Seal "Small Package" MIL-DTL-117H-TII C-E S-I / MIL-PRF-131K C-II.

T= 0.095"

D= 0.424"

Wednesday, May 20, 2020, 14:02: Roughing.

Wednesday, May 20, 2020, 14:08: BV1B open.

Wednesday, May 20, 2020, 15:28: Vacuum @ 1.242 T

Wednesday, May 20, 2020, 15:29: Open FS#3.

Wednesday, May 20, 2020, 15:31: Close FS#3 supply / return. Purged. Closed the lines Vacuum @  2.462 T.

Wednesday, May 20, 2020, 15:42: Start venting to 200 T. 


Removed Right coil line on FS#3 and blanked it off (G) (H).

Monday, May 25, 2020, 14:00: Roughing.

Monday, May 25, 2020, 14:02: BV1B open.

Monday, May 25, 2020, 15:16: Turbo pumps on.

Monday, May 25, 2020, 15:25: Ion gauge on.


Wednesday, May 27, 2020, 10:28: Ion gauge & turbo pumps off. 

FS#(G)(H) right coil line -  Lower G water block replaced leak checked / cleaned.

Line re-installed.

Wednesday, May 27, 2020, 12:56: Roughing.

Wednesday, May 27, 2020, 13:39: Turbo pumps on.

Wednesday, May 27, 2020, 13:47: Ion gauge on.


Monday, June 01, 2020, 06:47: Vacuum @ 5.12e-06T

Monday, June 01, 2020, 06:50: FS#3 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 06:57: FS#2 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 07:01: FS#4 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 07:04: FS#5 opened. Vacuum @ 5.10e-06T.

Monday, June 01, 2020, 07:12: PS on

Monday, June 01, 2020, 07:15: FS#8 opened. Vacuum @ 5.03e-06T.

Monday, June 01, 2020, 07:16: Sources on.

Monday, June 01, 2020, 07:18: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min. Vacuum limits adjusted:

7.000e-06 Vacuum ok, increment when less than this value.

8.000e-06 Vacuum exceeds, the last increment on TGHT / TBHT is backed off.

Monday, June 01, 2020, 09:17: Halt, adjust. Continue Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min.Vacuum @5.19 e-06T

Monday, June 01, 2020, 10:37: Auto-ramping TGHT / TBHT to 400 / 200 A @ 2 A per min.Vacuum @ 6.29e-06T.

Monday, June 01, 2020, 11:05: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2 A per min.Vacuum @ 6.70e-06T.

Monday, June 01, 2020, 12:18: Tripped* restarted* Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.Vacuum @ 6.70e-06T.

Tripped as the TGHT / TBHT "good vac" interlock is at 7.30e-06T.

Monday, June 01, 2020, 17:10: Lowered TGHT to 325A to avoid a trip and continue outgassing. Vacuum @ 7.00e-06T.


Tuesday, June 02, 2020, 06:06: Manually tap TGHT up to 350 A.

Tuesday, June 02, 2020, 06:39: Manually tap TGHT up to 375 A.


Wednesday, June 03, 2020, 09:37: Manually tap TGHT up to 400 A. Vacuum, @ 6.68e-06T.

Wednesday, June 03, 2020, 09:44: Manually tap TGHT up to 400 A. Vacuum, @ 6.90e-06T.

Wednesday, June 03, 2020, 10:45: Tripped* restarted* Auto-ramping TGHT / TBHT to 400 / 200 A @ 4 A per min.Vacuum @ 5.53e-06T.


Friday, June 05, 2020, 06:19: Manually tap TGHT up to 425 A. 


Tuesday, June 09, 2020, 19:57: Auto-Cooling from 475 A to 0 A @ 1 A per min. 


Wednesday, June 10, 2020, 06:32: PS off. Ion Gauge off. Turbo pumps off. 

Entry  Wednesday, June 10, 2020, 08:23, Aaron Schmidt, C#1, LP-SIS, ITW, TM2, 43044-8, 43515-3, In progress, Conditioning C#1 7x

Salts: 

Li - 10 uL

Na - 10 uL

K - 5 uL

Rb - 10 uL

Cs - 15 uL

Wednesday, June 10, 2020, 08:55: Roughing.

Wednesday, June 10, 2020, 09:30: Turbo pumps on.

Wednesday, June 10, 2020, 09:35: Ion gauge on.

Wednesday, June 10, 2020, 13:52: HS waterline opened. Vacuum ok @ 4.11e-06T.

Wednesday, June 10, 2020, 13:59: All main PS on. E-rig PS on. Optics on.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.21 5.81
 TBHT 27.04

8.83

 COIL + EE 26.93 2.76
 TGHT  27.04 6.58

Wednesday, June 10, 2020, 14:02: Sources on.


Thursday, June 11, 2020, 07:15: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Thursday, June 11, 2020, 07:29: IV4 opened. BIAS / EZL / EE @ 30 / 13 / -1.5 kV. 

Thursday, June 11, 2020, 09:56: BIAS reduced to 20 kV due to sparking / out gassing. MB1 having issues? 

Thursday, June 11, 2020, 14:24: Halted auto ramp due to the vacuum. TGHT @ 500 A. Vacuum @ 7.08e-06T.

Thursday, June 11, 2020, 14:26: TBHT reduced to 200 A. 

Thursday, June 11, 2020, 19:09: Auto-cooling @ 1 A per min. 


Friday, June 12, 2020, 10:43: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.  


Monday, June 15, 2020, 03:00: Vacuum @ 2.66e-06T. TGHT / TBHT @ 300 / 150 A. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Monday, June 15, 2020, 05:30: Tap up BIAS. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.  TGHT @ 512 A. Vacuum @ 6.11e-06T.

Monday, June 15, 2020, 06:46:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.40 7.51
 TBHT 26.08

10.15

 COIL + EE 25.88 3.53
 TGHT  26.06 7.31

Mass scans complete w/ TGHT / TBHT @ 512 / 230 A. 30 kV.

Mass, wire, & emittance scans taken on: M7, M23, M38, M86, M125.

Monday, June 15, 2020, 09:52: Auto-cooling @ 1 A per min.

Monday, June 15, 2020, 21:23: BIAS / EE / EZL @ 0 kV. 


Tuesday, June 16, 2020, 06:57: IV4 closed & reset.

Tuesday, June 16, 2020, 07:00: Sources / Power off. IG1 off. Turbo pumps off.

Tuesday, June 16, 2020, 08:06: Waterlines purged. N bottle @ 1450 PSI. Venting.

Entry  Tuesday, June 16, 2020, 11:03, Aaron Schmidt, Ta#60, LP-SIS, ITW, TM2, 44139-13, 43515-5, In progress, Conditioning Ta#60  Ta#60_Conditioning.docxITW-TM2-Ta#60-LP-SIS_Test_Stand.docxER-580-230-30kV-m8.txtER-580-230-30kV-m40.txt

Tuesday, June 16, 2020, 11:01: Turbo pumps on.


Wednesday, June 17, 2020, 07:49: HS waterlines opened. Vacuum stable @ 2.07e-06T.

Wednesday, June 17, 2020, 07:51: Power / Sources on.

Wednesday, June 17, 2020, 07:52: Opened IV4.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.89 6.17
 TBHT 27.73

8.71

 COIL + EE 27.66 2.82
 TGHT  27.74 6.68

Wednesday, June 17, 2020, 07:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 4 A per min. Optics on.

Wednesday, June 17, 2020, 08:03: BIAS / EE / EZL @ 30 /  -1.5 / 13 kV.

Wednesday, June 17, 2020, 09:43: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

12:50 Approx TRIP*. Vacuum spike?

Wednesday, June 17, 2020, 13:10: Sources back on. Auto-ramping TGHT / TBHT to 450 / 150 A @ 4 A per min. Optics switched back on.

Wednesday, June 17, 2020, 13:42: BIAS / EE / EZL @ 30 /  -1.5 / 13 kV.

Wednesday, June 17, 2020, 15:25: Auto-ramping TGHT / TBHT to 500 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 15:48: Auto-ramping TGHT / TBHT to 525 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 16:14: Auto-ramping TGHT / TBHT to 580 / 230 A @ 4 A per min.

Wednesday, June 17, 2020, 17:03: Scans complete

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.28 8.11
 TBHT 27.92

10.78

 COIL + EE 27.75 3.76
 TGHT  27.92 7.57

Wednesday, June 17, 2020, 17:09: TGHT brought down to 550 A. BIAS /  EE / EZL @ 0 kV.

Wednesday, June 17, 2020, 17:10: IV4 closed

Wednesday, June 17, 2020, 17:13: TBHT to 200 A.

Wednesday, June 17, 2020, 22:25: TSG:CG1A & TSG:CG1B leveling off. Reducing ~ On the strip tool. 


Thursday, June 18, 2020, 05:32: From 550 A / 200 A. Vacuum @ 5.63e-06T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 1 A per min. Max loop reached (5.500e-06T). Allow to out gas.


Sunday, June 21, 2020, 11:07: Auto-cooling @ 0.5 A per min. vacuum @ 4.29e-06T. 


Monday, June 22, 2020, 04:51: Auto-cooling @ 4 A per min. vacuum @ 1.49e-06T. 

Monday, June 22, 2020, 05:10: Sources / power off.

Monday, June 22, 2020, 05:13: Ion gauge & Turbo pumps off.

Monday, June 22, 2020, 06:46: Venting. HS waterline purged.

Entry  Monday, June 22, 2020, 07:07, Aaron Schmidt, Test FEBIAD, HP-FEBIAD, , , 38295-8, 42752-5, In progress, Test FEBIAD (Fernando) FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt

Reminder. Mini pump still linked to SV1. DO NOT OPEN SV2!!!

Monday, June 22, 2020, 08:45: Roughing.

Monday, June 22, 2020, 09:17: Turbo pumps on.

Monday, June 22, 2020, 09:22: Ion gauge on.


Tuesday, June 23, 2020, 07:37: Waterlines opened. Vacuum ok @ 1.60e-06T. Power / Sources on.

Tuesday, June 23, 2020, 07:45: Turned on "mini-pump" Open SV1.

Tuesday, June 23, 2020, 08:01: Open SV3 & SV4. (NOTE* Do not Open SV2).

Tuesday, June 23, 2020, 08:14: Close SV1. Turn off "Mini pump". Slowly open and close SV5. Unplug mini-pump.

Open w/ SV3 & SV4.

Tuesday, June 23, 2020, 08:16: SV5 left open w/ SV3 & SV4. Vacuum Stabilizing @ 2.32e-06T & dropping.

Tuesday, June 23, 2020, 08:20: Auto-ramping TGHT / TBHT to 300 / 150 A @ 4 A per min. Coil @ 20 A. IV4 open

Tuesday, June 23, 2020, 08:28: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 50 V.

Tuesday, June 23, 2020, 08:29: Optics on.

Tuesday, June 23, 2020, 09:59: Auto-ramping TGHT / TBHT to 580 / 270 A @ 2 A per min.

Tuesday, June 23, 2020, 12:59: Coil @ 50 A. Anode @ 100 vV. Vacuum @ 3.71e-06T

Tuesday, June 23, 2020, 13:10: Auto-ramping TBHT to 280 A @ 2 A per min.

Tuesday, June 23, 2020, 13:36: Mass, wire, & Emittance scans taken.

 

 

 

Entry  Monday, July 13, 2020, 14:52, Aaron Schmidt, , LP-FEBIAD, , , 41790-9, 43515-2, , UCx HS conditioning.  

Broken LP-FEBIAD used to out gas.

Monday, July 13, 2020, 14:52: Roughing.

Monday, July 13, 2020, 15:29: Turbo pumps on. 

Monday, July 13, 2020, 15:34: Ion gauge on.


Tuesday, July 14, 2020, 06:44: Waterlines opened.

Tuesday, July 14, 2020, 06:47: Power / sources on.

Tuesday, July 14, 2020, 06:49: Auto-ramping TGHT to 580 A @ 2 A per min.

Tuesday, July 14, 2020, 14:15: Vacuum @ 2.59e-06T 


Friday, July 17, 2020, 10:54: Auto-cooling @ 1 A per min. 


Monday, July 20, 2020, 06:51: Power /  sources off.

Monday, July 20, 2020, 06:52: Ion gauge / Turbo pumps off.

Monday, July 20, 2020, 06:53: Re-attached N bottle / regulator for purging.

Monday, July 20, 2020, 06:57: Waterlines Purged. N bottle @ 1300 PSI.