Entry  Thursday, June 19, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, FC0 did not retract from beam line 
Upon inspection it was found that the bolt attaching the FC to the actuator had fallen off. The bolt was reattached and FC0 can be actuated in/out again.
Entry  Wednesday, June 18, 2014, 09:23, Anders Mjos, , , , , , , Problems/Solutions, TSH:MB1 Trip & MB1 June 10th water leak 
A water leak on MB1 was found and reported by operations on June 10th e fault 7429
MB1 can not be switched on due to an TSH:MB1 water flow trip. Paddle wheel is rotating.
Wednesday, June 18, 2014, 14:03: Paddle wheel replaced with a used one from beam lines. Model SST150. Signal recovered.
Entry  Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_2nd_time.docx
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
    Reply  Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready
       Reply  Tuesday, June 17, 2014, 15:22, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_3rd_time.docx


    
        
            Anders Mjos wrote:
        
        
            
            
            
              
Entry  Monday, June 16, 2014, 09:12, Anders Mjos, , , , , , , In progress, Empty chamber 
Monday, June 16, 2014, 09:12: Roughing

Tuesday, June 17, 2014, 14:38: Venting 
Entry  Friday, March 21, 2014, 14:12, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2 TMSCG2_2014-03-21.png
The performance of the roughing pump has gradually gone down. Notably after the system has been vented. See attached screenshot from the archiver.
E-fault 7258.
 
    Reply  Thursday, June 12, 2014, 09:28, Anders Mjos, , , , , , , Problems/Solutions, Elevated backing pressure on ISAC Test Stand TMS:RP2 


    
        
            Anders Mjos wrote:
        
        
            
            The performance of the roughing pump has gradually gone down. Notably after the system has been vented.
Entry  Wednesday, May 21, 2014, 17:05, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , In progress, SiC#30 HV and Heaters conditiong 
As per Friedhelm the conditioning settings are:







Normal
0


Entry  Tuesday, May 20, 2014, 12:39, Anders Mjos, , , , , , , Done, FEBIAD Cathode Negative BIAS configuration 
As per ISK4562 Rev 3 and ISK4563 Rev 3
By Ray D. and co.
Entry  Tuesday, May 20, 2014, 11:17, Anders Mjos, , , , , , , Problems/Solutions, Burnt off GND connection on Service Cap 
The ground connection between B and F (ISK4523D Rev 6) was found burnt off. It will be switched out as per CATHODE BIAS configuration (ISK4563D Rev 3)
by Ray D.
Entry  Thursday, May 15, 2014, 14:58, Anders Mjos, , , , , , , Problems/Solutions, IOC rebooted to recover from white-out. 
Restarted archivers.
Entry  Monday, May 12, 2014, 14:20, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, Conditioning SiC#30 SiC#30_Conditioning.docx
Monday, May 12, 2014, 14:14 : Roughing
Monday, May 12, 2014, 14:34: Starting turbos
Monday, May 12, 2014, 14:42 : Turbos at speed
Entry  Friday, May 09, 2014, 10:48, Anders Mjos, , , , , , , Problems/Solutions, EPICS white-out e-fault 7380 
Monday, May 12, 2014, 10:02: Jane R. power cycled the hardware. EPICS is back up. Sources archiver required a restart.
Entry  Thursday, May 08, 2014, 15:09, Anders Mjos, , , , , , , Problems/Solutions, SOURCES archiver reported stopped 
 Archiver restarted.
Entry  Monday, April 28, 2014, 10:23, Anders Mjos, , , , , , , In progress, Cu-strip cleaning test - sample #2, cleaned 
Monday, April 28, 2014, 10:23: Started roughing
Monday, April 28, 2014, 10:48: Started turbos. CG1 at ~0.3 T 
Monday, April 28, 2014, 10:56 : Turbos at speed
Entry  Wednesday, April 23, 2014, 14:16, Anders Mjos, , , , , , , Done, Cu-strip cleaning test - sample #1, not cleaned Front_2014-04-24_2_05_56_PM.jpgSide_2014-04-24_2_06_12_PM.jpg
Wednesday, April 23, 2014, 14:15: Roughing
Wednesday, April 23, 2014, 14:34 : Starting turbos
Wednesday, April 23, 2014, 14:42 : Turbos at speed
Entry  Wednesday, April 23, 2014, 09:37, Anders Mjos, , , , , , , Problems/Solutions, Started Sources archiver 
The archiver was not running
Entry  Friday, April 04, 2014, 17:01, Rick Maharaj, UC#9, LP-SIS, ITW, TM1, , 39230-3, Done, Conditioning Heatshield for UCx#9 
Friday, April 04, 2014, 16:26: Heatshield/Ionsource assembly for UC LP SIS  installed in test stand with Ta tube as heat load.
Friday, April 04, 2014, 16:29: Chamber roughing started
Friday, April 04, 2014, 16:51: Turbos started
Entry  Thursday, April 03, 2014, 16:46, Aurelia Laxdal, TiC#4, HP-SIS, ITE, TM3, , , Done, HV and Heaters Conditioning ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx
HV and Heaters Conditioning had finished. The target was cooled down and it's ready for the on-line installation.
    Reply  Friday, April 04, 2014, 08:24, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Venting 
 

    
        
            Aurelia Laxdal wrote:
        
        
            
Entry  Tuesday, April 01, 2014, 11:09, Aurelia Laxdal, TiC#4, HP-SIS, ITE, TM3, , , In progress, HV and Heaters Conditioning  ITE-TM3-TiC#4-HP-SIS_Test_Stand_Conditioning.docx
Started March 31, 2014: 
- did the HV conditioning up to 30kV.
April 1, 2014: 
Entry  Friday, March 28, 2014, 10:39, Anders Mjos, TiC#4, HP-SIS, ITE, TM3, , , In progress, Conditioning TiC#4 
NOTE:

TBHT Power Supply is 600A. EPICS thinks it is 500. Multiply current setting with 1.2 for actual current to the tube.
Entry  Friday, March 21, 2014, 13:55, Anders Mjos, , , , , , , In progress, Pumping down empty chamber 
Roughing
Friday, March 21, 2014, 13:59: Starting turbos
Friday, March 21, 2014, 14:08: Turbos at speed