Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 22 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  464   Thursday, September 17, 2015, 14:05 Anders MjosTest TargetLP-SIS    In progressNew centre block test 

    
        
  
  466   Wednesday, September 30, 2015, 16:28 Anders MjosTest Target wrapped with heat shieldsLP-SIS    In progressNew centre block test 

    
        
  
  468   Wednesday, October 07, 2015, 11:16 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09
Turbos started
 SiC#32.docx 
  469   Tuesday, October 13, 2015, 07:47 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Target was pumped down on Friday.

Tuesday, October 13, 2015,
07:47: Opened water for HS. No response on
 SiC#32-2.docx 
  471   Tuesday, October 13, 2015, 17:23 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07:
Started turbos.
 SiC#32-3.docxEmittance.zipNeEfficiecy.xlsx 
  474   Friday, October 16, 2015, 12:26 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14Friday, October 16, 2015, 12:20: Roughing.
Friday, October 16, 2015, 13:06:
Started turbos.
 2015-10-22_TS_Leak.docx 
  478   Tuesday, November 03, 2015, 09:00 Anders MjosTarget tube only    41120-4In progressConditioning HS for UC#14Tuesday, November 03, 2015, 08:59: Starting
TGHT ramping to 580 A at 1 A/min

Thursday, November 05, 2015,
  
  479   Monday, November 16, 2015, 14:52 Anders Mjos      In progressCurrent measurementInstalled Cu-shunts on TGHT and TBHT terminals.
HS water looped.
 Monday, November 16, 2015,
 2015-11-17_High_Current_Test.png2015-11-17_Current_vs_Voltage_TGHT_and_TBHT.xlsx 
  492   Friday, January 22, 2016, 11:07 Anders Mjos      In progressVenting Friday, January 22, 2016, 11:07:
Stopped turbos
  
  494   Friday, January 22, 2016, 15:34 Anders MjosSiCLP-SIS  41077-3 In progressEE coating testFriday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14:
 2016-02-14_EE_V_limit.png 
  497   Friday, March 04, 2016, 14:23 Anders MjosTarget tube onlyLP-SISITWTM239459-241120-10In progressConditiong Heat Shield for UC#15Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started
  
  498   Friday, March 11, 2016, 15:46 Anders Mjos      In progressTesting end cap leak tightnessTwo Ta-tubes sealed with 2 end caps each
placed in the vacuum chamber. 
Friday, March 11, 2016, 15:03: Rouging
  
  499   Wednesday, March 16, 2016, 09:59 Anders MjosTarget tube only  TM139459-240898-2In progressConditiong Heat Shield for UC#15Back up heat shield for UC#15
Wednesday, March 16, 2016, 09:58:
Roughing
  
  501   Wednesday, March 30, 2016, 16:32 Aaron SchmidtTa#47LP-SISITETM441790-141120-05In progressConditioning Ta#47Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM
 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx 
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  506   Thursday, April 21, 2016, 14:26 Aaron SchmidtTa#48HP-SISITWTM241369-541120-5In progressConditioning Ta#48Thursday, April 21, 2016, 14:25: Begin
pumping down.
Thursday, April 21, 2016, 15:02:
 TS-2016-04-21_Ta#48.rga 
  545   Tuesday, October 11, 2016, 14:55 Anders Mjos      In progressEmptyBreaker tripped during roughing. Removed
exhaust line during first 2 min.
Tuesday, October 11, 2016, 14:55:
  
  547   Tuesday, October 18, 2016, 13:29 Aaron SchmidtTa#50LP-SISITETM441790-541751-1In progressConditioning Ta#50Tuesday, October 18, 2016, 13:22: Roughing.
Tuesday, October 18, 2016, 13:46:
Turbo pumps started.
 9x 
  549   Thursday, October 27, 2016, 13:37 Aaron SchmidtUC#18LP-SISITWTM2 41751-3In progressConditioning Heat shield for UC#18Thursday, October 27, 2016, 13:36: Roughing.
Thursday, October 27, 2016, 14:27:
Turbo pumps started.
 UC#18_Heat_shield_conditioning.docxTS-2016-10-27-16-00.rga 
  554   Monday, November 28, 2016, 15:39 Aaron Schmidt      In progressPump down empty chamber/Check ExhaustMonday, November 28, 2016, 15:35: Begin
roughing. Monitor exhaust mesh cover. 
*Cover was found on the ground earlier
  
ELOG V2.9.2-2455