Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS
|
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open
Friday, December 01, 2017, 14:47: Turbo pumps on.
Friday, December 01, 2017, 14:53: Ion gauge on (Vacuum @ 1.44 e-04T)
Friday, December 01, 2017, 14:57: Turbos @ speed. RGA on.
Monday, December 04, 2017, 09:27: System rebooted after weekend power outage.
Tuesday, December 05, 2017, 08:10: RGA on.
Tuesday, December 05, 2017, 08:17: Waterlines opened. Vacuum ok @ 1.56e-06T
Tuesday, December 05, 2017, 08:20: Power on. (Power supplies in off position) Turn power off
Open back. switch power supplies to on.
Tuesday, December 05, 2017, 08:35: Power on
Tuesday, December 05, 2017, 08:37: Auto ramping TGHT / TBHT to 150 / 75 A @ 2A per min.
Tuesday, December 05, 2017, 09:55: Auto ramping TGHT / TBHT to 200 / 75 A @ 2A per min.
Tuesday, December 05, 2017, 10:28: Auto ramping TGHT / TBHT to 400 / 150 A @ 2A per min. Vacuum @ 1.56e-06T.
Tuesday, December 05, 2017, 12:50: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 3.03e-06T.
Tuesday, December 05, 2017, 12:58: Auto ramping halted. Vacuum @ 3.12e-06T. Allow vacuum to improve.
Wednesday, December 06, 2017, 08:03: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.65e-06T. Added note*** The Silver bolts are NOT vented ***.
Wednesday, December 06, 2017, 08:30: TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.03e-06T and holding. Auto-ramping continued. No halt.
Wednesday, December 06, 2017, 10:45: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.36e-06T and holding. Auto-ramping on wait.
Wednesday, December 06, 2017, 14:37: Check. TGHT / TBHT @ 449 / 199 A. Vacuum @ 3.21e-06T and holding. Auto-ramping halted. Allow Vacuum to improve.
Thursday, December 07, 2017, 07:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min. Vacuum @ 2.33e-06T.
Thursday, December 07, 2017, 09:00: Check. TGHT / TBHT @ 571 / 200 A. Vacuum @ 3.19e-06T. Auto-ramping halted. Allow Vacuum to improve.
Friday, December 08, 2017, 07:52: Auto ramping TGHT to 580 A from 571 A @ 2A per min. Vacuum @ 2.04e-06T.
Monday, December 11, 2017, 08:00: Auto cooling @ 2A per min.
Monday, December 11, 2017, 13:45: Sources/power off. Water cooling off.
Tuesday, December 12, 2017, 06:35: RGA, Ion gauge, turbo pumps off.
Tuesday, December 12, 2017, 07:45: Venting.
Tuesday, December 12, 2017, 08:23: Doors open. |
Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off
|
Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week. |
Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON
|
Turned the source back ON. Heaters are ramping up. |
Thursday, September 27, 2012, 12:27, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training
|
The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source. |
Wednesday, June 23, 2021, 12:24, Aaron Schmidt, SiC#40, HP-SIS, ITE, TM4, 42218-8, 43515-8, In progress, SiC#40 Conditioning-2
|
Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22: TP1B on.
TP1B tripped.
Wednesday, June 23, 2021, 15:05: TP1B was restarted.
Wednesday, June 23, 2021, 15:15: TP1B on.
Wednesday, June 23, 2021, 16:21: TP1A started.
Wednesday, June 23, 2021, 16:30: IG1 on.
Wednesday, June 23, 2021, 17:53: FS#5 opened. Vacuum @ 7.52e-06T
Wednesday, June 23, 2021, 17:56: Vacuum Stable. Power on. TGHT / TBHT on.
Thursday, June 24, 2021, 05:40: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.
Thursday, June 24, 2021, 09:00: IV4 Opened.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
4.02 |
TBHT |
24.2 |
3.21
|
COIL + EE |
23.4 |
5.08 |
TGHT |
24.4 |
5.69 |
Thursday, June 24, 2021, 09:02: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, June 24, 2021, 09:10: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Optics on & set
Thursday, June 24, 2021, 12:52: Mass / Wire scans complete
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
3.99 |
TBHT |
25.0 |
3.20
|
COIL + EE |
24.1 |
5.05 |
TGHT |
25.3 |
5.71 |
Thursday, June 24, 2021, 14:00: Auto-cooling @ 2 A per min.
Thursday, June 24, 2021, 14:08: Auto-cooling aborted. TGHT / TBHT back to 580 / 230 A. Checking the emittance rig.
Thursday, June 24, 2021, 22:20: Auto-Cooling & HV off. - CB
Friday, June 25, 2021, 05:32: Sources off. IV4 closed. IG1 & Turbo pumps off.
Friday, June 25, 2021, 07:09: IV4 reset. Power off. Venting. |
Monday, May 25, 2015, 14:40, Anders Mjos, SiC#31, HP-SIS, ITW, TM4, 38817-7, , In progress, SiC#31 Conditioning
|
Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos started.
Monday, May 25, 2015, 15:15: Turbos at speed. Vacuum at 2.4E-5 T
Tuesday, May 26, 2015, 07:45: Opened water circuit for HS line. Vacuum stable at 6.3E-7 T. No response on RGA
Tuesday, May 26, 2015, 07:50: Autoramping to 500/200 A at 2/1 A/min. Good vacuum 2E-6, bad vacuum 4E-6 T
Tuesday, May 26, 2015, 07:52: IV4 open
Tuesday, May 26, 2015, 13:15: Continue auto-ramping to 580 A
Tuesday, May 26, 2015, 13:48: BIAS/EZL/EE 30 / 15 / 1.5 kV
Tuesday, May 26, 2015, 17:29: ~6 sparks/hour
Wednesday, May 27, 2015, 08:14: A couple of sparks over night.
Wednesday, May 27, 2015, 09:23: Autoramping TBHT to 220 A
Wednesday, May 27, 2015, 09:41: Found FC0 and FC6 bias to be off
Wednesday, May 27, 2015, 09:42: Autoramping TBHT to 230 A
Wednesday, May 27, 2015, 10:30: EE to 2 kV
Wednesday, May 27, 2015, 10:37: Starting cool down at 4/2 A/min
Wednesday, May 27, 2015, 10:40: EE to 1.5 kV
Wednesday, May 27, 2015, 12:37 : BIAS/EZL/EE OFF
Wednesday, May 27, 2015, 12:37 : IV4 closed
Wednesday, May 27, 2015, 13:02: Stopped turbos
Wednesday, May 27, 2015, 13:41: Venting |
Wednesday, May 21, 2014, 17:05, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , In progress, SiC#30 HV and Heaters conditiong
|
As per Friedhelm the conditioning settings are:
TGHT 580A
TBHT 290A
COIL 80A
ANODE 200V
Ramped up completed:
TGHT 580A/5.683V
TBHT 242A/2.295V (EPICS settings) and 289A/2.29V at the PS
COIL 80A
Current on the Anode = 13.431mA
|
Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning
|
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation. |
Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning
|
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed |
Tuesday, June 17, 2014, 15:22, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, SiC#30 HV and Heaters Conditioning
|
Anders Mjos wrote: |
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed
|
The target assembly did not pass the megger test between anode and heat shield after the previous conditioning. The AlN insulators were found to have failed during the conditioning. The coil insulation was burnt. AlN insulators and anode ware replaced.
Tuesday, June 17, 2014, 15:22: Roughing
By R.M.
Tuesday, June 17, 2014, 15:52: Turbos Started
Tuesday, June 17, 2014, 15:54: TP1B at speed
Tuesday, June 17, 2014, 15:57: IG1 Turned on 1.92e-05T
Tuesday, June 17, 2014, 15:59: TP1A at speed
Tuesday, June 17, 2014, 15:59: IG1 1.31e-05T
By AM
Wednesday, June 18, 2014, 08:24: Opened HS water circuit. Vacuum stable at 2.2E-7 T.
Wednesday, June 18, 2014, 08:40: Pumping on gas lines.
Wednesday, June 18, 2014, 08:49: Closed pump valve on gas lines.
Wednesday, June 18, 2014, 08:51: Opening TSH:SV5
Wednesday, June 18, 2014, 08:53: Opening TSH:SV2
Wednesday, June 18, 2014, 09:00: BIAS/ EZL / EE 30 / 13 / -1.5 kV
Wednesday, June 18, 2014, 09:04: Starting target heating to 500 / 240 A
Wednesday, June 18, 2014, 09:07: COIL to 50 A. ANODE to 200 V
Wednesday, June 18, 2014, 09:33: OPEN TPS:IV4
Wednesday, June 18, 2014, 14:05: TBHT at 240 A 2.6 V. TGHT still ramping (403 A)
Wednesday, June 18, 2014, 15:03: TGHT at 500 A 4.5 V
Thursday, June 19, 2014, 08:51: Ramping to 580 A / 265 A
Thursday, June 19, 2014, 09:37: Continue ramping TBHT to 290A
Thursday, June 19, 2014, 09:44: 8E-8 A on FC0
Thursday, June 19, 2014, 10:52: TBHT at 305A. Running mass scan.
Thursday, June 19, 2014, 11:36: Opening for He.
Thursday, June 19, 2014, 11:46: Opening for Ne.
Thursday, June 19, 2014, 11:54: Lowering TBHT to 300 A
Thursday, June 19, 2014, 13:01: Mass scan. ~1E-10 A Ne current on FC6 with Ne open.
Thursday, June 19, 2014, 15:06: Mass scan up.
Thursday, June 19, 2014, 16:00: Mass scan down.
Thursday, June 19, 2014, 16:49: Started cooling down target.
Friday, June 20, 2014, 08:53: Target de-biased. Turbos off.
Friday, June 20, 2014, 10:23: Venting. Purging water from HS circuit. |
Friday, November 02, 2012, 15:40, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, SiC#3 cooldown started
|
Started the cooldown for SiC#3. |
Monday, May 14, 2012, 16:57, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27-HP-SIS installed in the Test Stand
|
Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down. |
Wednesday, May 16, 2012, 18:10, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27 cooling down
|
Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem: under investigations.
Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575
Started the cool down. |
Monday, December 21, 2020, 07:58, Aaron Schmidt, , , , , , , , Shutdown TS
|
Shutting down the ISAC TS for the planned outage on Dec 22.
Monday, December 21, 2020, 07:50: Ion gauges & turbo pumps off.
Monday, December 21, 2020, 07:51: Confirm wire scanner shutoff.
Monday, December 21, 2020, 07:55: Waterlines purged.
Monday, December 21, 2020, 07:57: Backing valves TMS:BV6 & TMS:BV2 off. PV1 & PV2 off. Roughing pumps off. |
Thursday, July 12, 2012, 09:05, Anders Mjos, , , , , , , Problems/Solutions, Shut down TSGTP1A - bearing noise
|
Shut down TSGTP1A due to noise (possibly from bearings) after consulting Edi. |
Thursday, August 16, 2012, 16:54, Anders Mjos, , , , , , , Problems/Solutions, Short between gas line and heat shield
|
There was a short between the gas line and the heat shield - as the gas line insulator was not tied to the heat shield. A Ta-wire was used to tie the gas line and keep it from touching the heat shield. |
Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode
|
Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.
Monday, March 11, 2024, 13:59: Power supply polarity switched to negative. |
Tuesday, April 09, 2024, 15:28, Aaron Schmidt, , , , , , , , Set to Anode BIAS Mode & Old gas leak installed.
|
Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed. |
Tuesday, March 30, 2021, 13:19, Carla Babcock, , , , , , , , Second emittance meter testing
|
Emittance meter number 2 ready for beam shortly - installed and pumping down.
No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality and try to re-tune later.
Ramping things down for the next couple days.
Saturday, April 03, 2021, 10:41 :
Source heating ramped back up, everything back on. Will try to straighten out steering then see if I can get things back in the previous positions.
Saturday, April 03, 2021, 14:59 :
Nothing seems to be working, will vent the beamline and remove the slit.
Saturday, April 03, 2021, 15:36 :
Apparently closing the valve started a vacuum leak that tripped everything in the source. I noticed within the first minute and ramped everything back up, maybe too quickly....
Have now put everything in a holding state, will resume tomorrow.
Sunday, April 04, 2021, 14:17 :
Found everything off again this morning. Ramping back up in the hopes that I can get something done before the whole system trips again. The trips look like water leaks again.
Uninstalled the slit and left it in the bottom of the vacuum box. Swapped the window to the computer side for convenience. Seal on the other side on the CF flange is a bit weird, not sure if it is in properly...
Sunday, April 04, 2021, 18:43
Still no beam. TISA emittance FC won't come back on, so waiting for Mike Rowe to troubleshoot on Tuesday. Will ramp things down all the way, since I expect the vacuum to trip the source before I need it again.
Tuesday, April 06, 2021, 23:43
Found some beam, but looks really weird, like it is cut off. Good enough. Ramped everything down. |
Tuesday, December 21, 2021, 13:34, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-6, In progress, Salts test HS & Holiday Shutdown
|
LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.
*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)
-Plan to shut down the ISAC TS on 12/23/2021 for the holidays.
Thermocouples are installed.
Ref:
https://elog.triumf.ca/TIS/Test-Stand/679
Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders
Grounded |
|
|
X |
|
|
|
|
|
|
Source Tray Side (looking head on) |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
High Voltage Cage Side |
5 |
4 |
3 |
2 |
1 |
9 |
8 |
7 |
6 |
Twisted pairs |
TP1 |
TP1 |
- |
TP2 |
TP2 |
TP3 |
TP3 |
TP4 |
TP4 |
Tuesday, December 21, 2021, 13:55: Roughing.
Tuesday, December 21, 2021, 13:57: BV1A open.
Thursday, December 23, 2021, 07:42: TP2 & TP6 off.
Thursday, December 23, 2021, 09:00: PV1 & PV2 off. RP1 & RP2 off.
Clean up?? What happened here? (Water mess?)
Tuesday, January 04, 2022, 11:13: RP1 & RP2 on.
Tuesday, January 04, 2022, 11:14: Roughing.
Tuesday, January 04, 2022, 11:17: TP2 & TP6 on.
Tuesday, January 04, 2022, 11:21: IG6 on.
Tuesday, January 04, 2022, 13:00: TP1B on.
Carla:
Swapped top and bottom connector on target side multipin to match up with wires. Added kapton tape where things were touching. TC#3 (ROI) maybe won't work, was very twisted. Not sure if I got all the twists.
Data logger |
Location |
Source tray position |
HV rack position |
TC#1 |
MMO |
1 pos |
5 pos
|
|
|
6 neg |
9 neg |
TC#2 |
MMI |
4 pos |
2 pos |
|
|
5 neg |
1 neg |
TC#3 |
ROI |
8 pos |
7 pos |
|
|
9 neg |
6 neg |
Monday, January 10, 2022, 09:53: Roughing.
Monday, January 10, 2022, 15:55: TP1B on
Monday, January 10, 2022, 16:04: TP1A on.
Monday, January 10, 2022, 16:14: TP2 Tripped. Back on within 30 seconds.
Monday, January 10, 2022, 16:14: IG1 on.
Wednesday, January 12, 2022, 09:56 : Cage has been closed up and HS water lines are open. |
|