Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 21 of 53  Not logged in ELOG logo
Entry  Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open
Entry  Friday, September 28, 2012, 09:59, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training - Source Off 
Checked with ISAC Ops this morning and they are not available for FEBIAD training. Turned off the source until next week.
Entry  Monday, October 01, 2012, 10:41, Aurelia Laxdal, , HP-FEBIAD, , , , , In progress, SiC-HP-FEBIAD for operator training - Source ON  
Turned the source back ON. Heaters are ramping up.
Entry  Thursday, September 27, 2012, 12:27, Aurelia Laxdal, , , , , , , In progress, SiC-HP-FEBIAD for operator training 
The source was used yesterday for operator training.
Today, I found the source off: the ISAC PLC Status was stopped. Kazuya re-started the PLC. I will re-start the source.
Entry  Wednesday, June 23, 2021, 12:24, Aaron Schmidt, SiC#40, HP-SIS, ITE, TM4, 42218-8, 43515-8, In progress, SiC#40 Conditioning-2 SiC#40_Conditioning_-_2.docxER-580-230-30kV-m7_-_2.txt
Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22: TP1B on.
TP1B tripped.
Entry  Monday, May 25, 2015, 14:40, Anders Mjos, SiC#31, HP-SIS, ITW, TM4, 38817-7, , In progress, SiC#31 Conditioning SiC#31.docxER30kV580-200.txtER30kV580-230.txt
Monday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos started.
Monday, May 25, 2015, 15:15: Turbos at speed. Vacuum at 2.4E-5 T
Entry  Wednesday, May 21, 2014, 17:05, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , In progress, SiC#30 HV and Heaters conditiong 
As per Friedhelm the conditioning settings are:







Normal
0


Entry  Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_2nd_time.docx
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
    Reply  Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning  


    
        
            Aurelia Laxdal wrote:
        
        
            
            HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready
    Reply  Tuesday, June 17, 2014, 15:22, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, In progress, SiC#30 HV and Heaters Conditioning  SiC#30_Conditioning_3rd_time.docx


    
        
            Anders Mjos wrote:
        
        
            
            
            
              
Entry  Friday, November 02, 2012, 15:40, Aurelia Laxdal, , LP-SIS, ITW, TM1, , , Done, SiC#3 cooldown started 
Started the cooldown for SiC#3.
Entry  Monday, May 14, 2012, 16:57, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27-HP-SIS installed in the Test Stand 
Rick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012 in the Test Stand. Pumping down.
Entry  Wednesday, May 16, 2012, 18:10, Aurelia Laxdal, , , ITE, TM4, , , , SiC#27 cooling down 
Today: did a mass scan at 580A on TGHT and 230A on TBHT at 30kV. Found some A/q units discrepancies on the mass scan page. It may be a hall probe problem: 
under investigations.
Uploaded the testing file on Docushare: http://documents.triumf.ca/docushare/dsweb/View/Collection-8539/Document-56575
Entry  Monday, December 21, 2020, 07:58, Aaron Schmidt, , , , , , , , Shutdown TS  
Shutting down the ISAC TS for the planned outage on Dec 22.
Monday, December 21, 2020, 07:50: Ion gauges & turbo pumps off.
Monday, December 21, 2020, 07:51: Confirm wire scanner shutoff.
Entry  Thursday, July 12, 2012, 09:05, Anders Mjos, , , , , , , Problems/Solutions, Shut down TSGTP1A - bearing noise 
Shut down TSGTP1A due to noise (possibly from bearings) after consulting Edi.
Entry  Thursday, August 16, 2012, 16:54, Anders Mjos, , , , , , , Problems/Solutions, Short between gas line and heat shield 
There was a short between the gas line and the heat shield - as the gas line insulator was not tied to the heat shield. A Ta-wire was used to tie the
gas line and keep it from touching the heat shield.
Entry  Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode 
Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.

Monday, March 11, 2024, 13:59: Power supply polarity switched to negative.
Entry  Tuesday, April 09, 2024, 15:28, Aaron Schmidt, , , , , , , , Set to Anode BIAS Mode & Old gas leak installed. 
Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed.
Entry  Tuesday, March 30, 2021, 13:19, Carla Babcock, , , , , , , , Second emittance meter testing Carla_tune_tracking.docx
Emittance meter number 2 ready for beam shortly - installed and pumping down.
No beam found by Thursday evening, but beam seems to be coming out much differently than last time. Will check on emittance meter functionality
and try to re-tune later.
Entry  Tuesday, December 21, 2021, 13:34, Aaron Schmidt, , LP-SIS, , , 44691-8, 44378-6, In progress, Salts test HS & Holiday Shutdown 
LP-SIS modified w/ 2 holes on the center block to accept a pair of Ta tubes that are run to the coil PS.
*Note modified HS plates at the ion source to accommodate the LP-SIS (Has a slightly bent ionizer tube from the drilling)
-Plan to shut down the ISAC TS on 12/23/2021 for the holidays.
ELOG V2.9.2-2455