ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown Text Attachments
  615   Friday, December 01, 2017, 14:31 Aaron Schmidt LP-SIS  (Blank)42752-3In progressSilver plated bolts test / Outgas TSChamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT.
 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga 
  217   Friday, September 28, 2012, 09:59 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator training - Source OffChecked with ISAC Ops this morning and
they are not available for FEBIAD training.
Turned off the source until next week.
  
  218   Monday, October 01, 2012, 10:41 Aurelia Laxdal HP-FEBIAD    In progressSiC-HP-FEBIAD for operator training - Source ON Turned the source back ON. Heaters are
ramping up.
  
  216   Thursday, September 27, 2012, 12:27 Aurelia Laxdal      In progressSiC-HP-FEBIAD for operator trainingThe source was used yesterday for operator
training.
Today, I found the source off: the
  
  881   Wednesday, June 23, 2021, 12:24 Aaron SchmidtSiC#40HP-SISITETM442218-843515-8In progressSiC#40 Conditioning-2Wednesday, June 23, 2021, 12:22: Roughing.
Wednesday, June 23, 2021, 13:22:
TP1B on.
 SiC#40_Conditioning_-_2.docxER-580-230-30kV-m7_-_2.txt 
  446   Monday, May 25, 2015, 14:40 Anders MjosSiC#31HP-SISITWTM438817-7 In progressSiC#31 ConditioningMonday, May 25, 2015, 14:35: Rouging
Monday, May 25, 2015, 15:05: Turbos
started.
 SiC#31.docxER30kV580-200.txtER30kV580-230.txt 
  381   Wednesday, May 21, 2014, 17:05 Aurelia LaxdalSiC#30HP-FEBIADITETM3  In progressSiC#30 HV and Heaters conditiongAs per Friedhelm the conditioning settings
are:


  
  382   Monday, May 26, 2014, 14:15 Aurelia LaxdalSiC#30HP-FEBIADITETM3  DoneSiC#30 HV and Heaters Conditioning HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line
 SiC#30_Conditioning_2nd_time.docx 
  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

    

       
            
  
  386   Tuesday, June 17, 2014, 15:22 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressSiC#30 HV and Heaters Conditioning

    

       
            
 SiC#30_Conditioning_3rd_time.docx 
  228   Friday, November 02, 2012, 15:40 Aurelia Laxdal LP-SISITWTM1  DoneSiC#3 cooldown startedStarted the cooldown for SiC#3.   
  84   Monday, May 14, 2012, 16:57 Aurelia Laxdal  ITETM4   SiC#27-HP-SIS installed in the Test StandRick and John installed the ITE-TM4-SiC#27-HP-SIS-May2012
in the Test Stand. Pumping down.
  
  94   Wednesday, May 16, 2012, 18:10 Aurelia Laxdal  ITETM4   SiC#27 cooling downToday: did a mass scan at 580A on TGHT
and 230A on TBHT at 30kV. Found some A/q
units discrepancies on the mass scan page.
  
  835   Monday, December 21, 2020, 07:58 Aaron Schmidt       Shutdown TS Shutting down the ISAC TS for the planned
outage on Dec 22.
Monday, December 21, 2020, 07:50:
  
  141   Thursday, July 12, 2012, 09:05 Anders Mjos      Problems/SolutionsShut down TSGTP1A - bearing noiseShut down TSGTP1A due to noise (possibly
from bearings) after consulting Edi.
  
  172   Thursday, August 16, 2012, 16:54 Anders Mjos      Problems/SolutionsShort between gas line and heat shieldThere was a short between the gas line
and the heat shield - as the gas line insulator
was not tied to the heat shield. A Ta-wire
  
  997   Tuesday, February 20, 2024, 14:22 Aaron Schmidt       Set to Cathode BIAS ModeTuesday, February 20, 2024, 14:20: TS to
wired to Cathode BIAS mode as per ISK4563D.

Monday, March 11, 2024, 13:59:
  
  1001   Tuesday, April 09, 2024, 15:28 Aaron Schmidt       Set to Anode BIAS Mode & Old gas leak installed.Switched to Anode mode on March 28 including
polarity. The old calibrated leak was also
re-installed.
  
  867   Tuesday, March 30, 2021, 13:19 Carla Babcock       Second emittance meter testingEmittance meter number 2 ready for beam
shortly - installed and pumping down.
No beam found by Thursday evening,
 Carla_tune_tracking.docx 
  908   Tuesday, December 21, 2021, 13:34 Aaron Schmidt LP-SIS  44691-844378-6In progressSalts test HS & Holiday ShutdownLP-SIS modified w/ 2 holes on the center
block to accept a pair of Ta tubes that are
run to the coil PS.
  