  333   Monday, September 16, 2013, 17:07 Anders MjosNiO#2HP-FEBIADITETM339530-639069-4DoneConditioning NiO#2 take 2The GE on the Source tray and EE on the
target was cleaned. The target will be conditioned
again to verify if sparking has been reduced.
  
  336   Wednesday, September 18, 2013, 16:18 Anders Mjos HP-FEBIAD  Tube only38307-9DoneTest Target - FEBIAD COILWednesday, September 18, 2013, 16:18: Starting
turbos
Wednesday, September 18, 2013, 16:26
  
  377   Monday, May 12, 2014, 14:20 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressConditioning SiC#30Monday, May 12, 2014, 14:14 : Roughing
Monday, May 12, 2014, 14:34: Starting
turbos
 SiC#30_Conditioning.docx 
  381   Wednesday, May 21, 2014, 17:05 Aurelia LaxdalSiC#30HP-FEBIADITETM3  In progressSiC#30 HV and Heaters conditiongAs per Friedhelm the conditioning settings
are:


  
  382   Monday, May 26, 2014, 14:15 Aurelia LaxdalSiC#30HP-FEBIADITETM3  DoneSiC#30 HV and Heaters Conditioning HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line
 SiC#30_Conditioning_2nd_time.docx 
  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

    

       
            
  
  386   Tuesday, June 17, 2014, 15:22 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5In progressSiC#30 HV and Heaters Conditioning

    

       
            
 SiC#30_Conditioning_3rd_time.docx 
  468   Wednesday, October 07, 2015, 11:16 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Wednesday, October 07, 2015, 11:15: roughing
Wednesday, October 07, 2015, 12:09
Turbos started
 SiC#32.docx 
  469   Tuesday, October 13, 2015, 07:47 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Target was pumped down on Friday.

Tuesday, October 13, 2015,
07:47: Opened water for HS. No response on
 SiC#32-2.docx 
  471   Tuesday, October 13, 2015, 17:23 Anders MjosSiC#32HP-FEBIADITWTM2  In progressConditioning SiC#32Tuesday, October 13, 2015, 17:22: Roughing
Tuesday, October 13, 2015, 18:07:
Started turbos.
 SiC#32-3.docxEmittance.zipNeEfficiecy.xlsx 
  543   Friday, September 30, 2016, 11:11 Aaron SchmidtSiC#35HP-FEBIADITWTM239530-941120-8DoneConditioning SiC#35Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01:
Roughing stopped. RP1 failure. Breaker tripped.
 6x 
  607   Friday, October 06, 2017, 12:14 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37NOTE* : The right coil terminal terminates
into the heat shield. DO NOT TURN ON COIL.
Friday, October 06, 2017, 12:12:
 9x 
  610   Friday, October 13, 2017, 15:53 Aaron SchmidtSiC#37HP-FEBIADITETM439530-1041751-4In progressConditioning SiC#37 (ii)Previous short fixed. Grid clamp removed.
Grid tack welded.
Friday, October 13, 2017, 15:49:
 10x 
  748   Sunday, July 28, 2019, 14:22 Luca EgoritiP2N - 1HP-FEBIADITETM2p2n - test1p2n - test1Problems/Solutionsp2n heating test 3Friday. July 26th 2019 
A new electrical configuration of
the test stand was decided and installed.
 20190728_-_p2n_heating_3.PNG 
  749   Tuesday, July 30, 2019, 12:19 Luca EgoritiP2N - 1HP-FEBIADITETM2  Problems/Solutionsp2n heating test - target inspectionThe p2n target was taken out of the test
stand for inspection. Comments and measurements
on the container below:
 IMG_20190730_110927.jpgIMG_20190730_113437.jpgIMG_20190730_105629.jpg 
  762   Friday, October 18, 2019, 15:01 Aaron SchmidtSiC#38HP-FEBIADITETM242464-442752-1In progressConditioning SiC#38 HP-FEBIADFriday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30:
Turbo pumps on.
 12x 
  796   Monday, June 22, 2020, 07:07 Aaron SchmidtTest FEBIADHP-FEBIAD  38295-842752-5In progressTest FEBIAD (Fernando)Reminder. Mini pump still linked to SV1.
DO NOT OPEN SV2!!!
Monday, June 22, 2020, 08:45: Roughing.
 FEBIAD_Testing_-_June_22_-_23.docxER-580-280-30kV-m28.txt 
  797   Thursday, June 25, 2020, 08:57 Fernando MaldonadoTest FEBIADHP-FEBIAD  38295-842752-5DoneFEBIAD development part 1/3 Reminder. Mini
pump still linked to SV1. DO NOT OPEN SV2!!!
  
  798   Tuesday, June 30, 2020, 21:59 Fernando MaldonadoTest FEBIADHP-FEBIAD  38295-8 42752-5 DoneFEBIAD development part 2/3 Reminder. Mini pump
still linked to SV1. DO NOT OPEN SV2!!!
  
  799   Monday, July 06, 2020, 05:28 Fernando MaldonadoTest FEBIAD HP-FEBIAD  38295-8 42752-5 DoneFEBIAD development part 3/3Reminder. Mini pump still linked
to SV1. DO NOT OPEN SV2!!!
  