  673   Thursday, July 12, 2018, 08:24 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressPower outage / restart

Power outage (07/11/2018 @ approx 21:53) shut down the test stand.

 

Thursday, July 12, 2018, 08:17: Reset vacuum controls & IV4

Thursday, July 12, 2018, 08:19: Restart all the turbo pumps.

Thursday, July 12, 2018, 08:24: IG6 & IG1 restarted.

Thursday, July 12, 2018, 08:33: Power on.

Thursday, July 12, 2018, 08:36: Opened gas lines SV2 & SV5 for FEBIAD to pump down lines with the chamber.

Thursday, July 12, 2018, 08:56: Reset optics. Operation appears ok.

Thursday, July 12, 2018, 09:02: Sources except EE & BIAS are reset. BIAS requires EE and the EE won't restart / respond.

Thursday, July 12, 2018, 09:31: Cycle EE PS? No response.

Thursday, July 12, 2018, 10:08: Cycle PLC. EE is responsive / back. BIAS operates as well.

Thursday, July 12, 2018, 10:10: Opened IV4.

  674   Thursday, July 12, 2018, 10:11 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressCoil Test #5

 *** REVIEW Elog entry #673 Power outage & restart ***

Thursday, July 12, 2018, 10:10: Opened IV4

Thursday, July 12, 2018, 10:20: Attempt auto-ramp cancelled. Max increment values reached. Wait on Vacuum.

Thursday, July 12, 2018, 13:10: Auto-ramping TGHT / TBHT to 500 / 200 A @ 2A per min.

Thursday, July 12, 2018, 13:16: BIAS/EZL/EE @ 30/13/1.5 kV. 

Thursday, July 12, 2018, 13:19: Anode set to 200 V

Thursday, July 12, 2018, 13:23: Gas lines SV1, SV3, SV4 opened without issue.


Friday, July 13, 2018, 07:02: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.


FM:

Friday, July 13, 2018, 09:26 Ramping up to TBHT=335A to get at least 20 mA on the anode current.

Friday, July 13, 2018, 09:52 Ramp up finished: TBHT=335A, TBHT RB=349.6A, TBHT PS=341A. Anode current=20.757mA@200V. Vaccum ok@8.86e-7Torr

Friday, July 13, 2018, 09:56 Closing Neon valve in order to only deliver Argon.


Friday, July 13, 2018, 13:32   When anode voltage=0V, there are four peaks on the mass scan on masses  23,38,41,83 u. This indicate surface ionized particles. Most likely Sodium (23) and Potassium (38,41) and not sure about 83.

Friday, July 13, 2018, 16:58  Cooling it down for the weekend: TBHT=250A, TGHT=450

Friday, July 13, 2018, 17:01 wow! accidentally, changed to those values immediatly. I hope this does not compromise the cathode - Fernando


Monday, July 16, 2018, 06:57: Odd RGA values. Restarting RGA.

Monday, July 16, 2018, 07:14: RGA only displays Water, Nitrogen, and Oxygen. Investigate.

Monday, July 16, 2018, 09:57 Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min from 449 / 209 A.

Monday, July 16, 2018, 10:00: Restarted the RGA with an older file loaded. RGA still only displays lines for Water, Nitrogen, and Oxygen. A table of values is still given for the other masses.

Monday, July 16, 2018, 11:08: TGHT / TBHT to 580 / 320 A. Anode to 200V

Monday, July 16, 2018, 11:19: Neon valve carefully opened. Vacuum stable @ 6.56e-07T. Neon response also showed up on the RGA.

Monday, July 16, 2018, 11:25: TBHT @ 340.0A (332A on PS)


FM

Monday, July 16, 2018, 11:55  TBHT@340A @ 354.7A (RB)@346A PS

Monday, July 16, 2018, 15:02 TBHT@345A @ 359.8A (RB)@351A PS

Monday, July 16, 2018, 15:18 Investigation the possible location of the surface ionized ions by sweeping the voltage in lower values <10V

Monday, July 16, 2018, 15:29 Values swept: 10,8,6,4,2,1 V. the same peak was observed at all cases

Monday, July 16, 2018, 15:52 Closing Neon Valve for efficiency measurement.

Monday, July 16, 2018, 15:58 Steady  ion source current. closing Argon valve.

Monday, July 16, 2018, 17:00 Opening Argon Valve

Monday, July 16, 2018, 17:51 Argon valve closed. Neon Valve open. Measuring Mass=20

Monday, July 16, 2018, 18:13 Manually tapped TBHT down to 325A.


FM

Tuesday, July 17, 2018, 09:53  Ramping up TBHT to 345A

Tuesday, July 17, 2018, 10:13 Ramp up finish. TBHT@345A @ 359.7A (RB)@351A PS.  Vacuum ok @ 7.43e-7 T

Tuesday, July 17, 2018, 10:14 Restarting  quads that were off.

Tuesday, July 17, 2018, 10:18 Tuning

Tuesday, July 17, 2018, 11:01 Measurements will start for mass 20.

Tuesday, July 17, 2018, 11:59 Lunch break

Tuesday, July 17, 2018, 12:41 Coming back. TMSQ2 & TMSQ5 off. Turning them on.

Tuesday, July 17, 2018, 13:54 Retuning emittance scanner to default parameters. Cycle the emittance scanner PS.

Tuesday, July 17, 2018, 14:18 Increasing current limit for anode. From 51.282 mA to  51.400 mA

 Tuesday, July 17, 2018, 14:34 Increasing current limin on anode to 52.00 mA

Tuesday, July 17, 2018, 14:35 Closing Neon Valve

Tuesday, July 17, 2018, 15:02 FC6 stable

Tuesday, July 17, 2018, 15:02 Opening "Argon" bottle

Tuesday, July 17, 2018, 15:21 Fc6 stable. The present current lies between the on/off Neon Valve.

Tuesday, July 17, 2018, 15:30 Opening Neon Valve

Tuesday, July 17, 2018, 15:51 Re-tuning. Taking a mass scan.

Tuesday, July 17, 2018, 15:55 Checking the RGA, I noticed that the maximum reading for Neon was 7.05e-8T, and for Argon, 6.15e-7T

Tuesday, July 17, 2018, 16:45 Increasing Anode current limit to 100mA. Increasing TBHT to 347A, 361.8 RB, 353 PS. Vaccum ok@7.87e-7T

Tuesday, July 17, 2018, 16:54 Finish for today.


FM

Wednesday, July 18, 2018, 09:27  Starting new round of measurements.

Wednesday, July 18, 2018, 09:31 TBHT@350A@364.5A (RB) @ 356 (PS).  Vacuum ok at 6.71e-7T

Wednesday, July 18, 2018, 11:48 Finish mass scan sweeps. Leaving for lunch. Coming back at around 3pm due to science week

Wednesday, July 18, 2018, 15:29 Starting again.

Wednesday, July 18, 2018, 15:30 Mass scan at AB=0V

Wednesday, July 18, 2018, 15:56 Mass scan set to 38.5 (K).

Wednesday, July 18, 2018, 15:56 Measuring emittance.

Wednesday, July 18, 2018, 16:02 Closing Argon bottle.

Wednesday, July 18, 2018, 16:08 Closing Neon bottle.

Wednesday, July 18, 2018, 16:13 Measuring what it looks to be a potassium signal. Let's see if the signal decreases overnight.


Friday, July 20, 2018, 11:48: FC0 put in place & the gas lines closed. - Aaron S.

Friday, July 20, 2018, 11:50  : Auto cooling @ 2A per min.


Monday, July 23, 2018, 07:05: Sources off. Optics checked.

Monday, July 23, 2018, 07:13 : RGA error. Restart for proper shut off. IV4 closed.

Monday, July 23, 2018, 07:14 : Ion gauge, turbos off.

  687   Tuesday, October 02, 2018, 13:39 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps w/ stoppage

Silver bolts used on Coil, TGHT, & TBHT.

End caps in target

Tuesday, October 02, 2018, 13:36: Roughing.

Tuesday, October 02, 2018, 13:37: Doors sealed.

Tuesday, October 02, 2018, 14:10: Turbos on.


Due to potential power & cooling loss. Shutdown vac.

Wednesday, October 03, 2018, 07:34: Chamber Turbos off.

Wednesday, October 03, 2018, 10:58: Beam line Turbos off. Closed both PV1 & PV2 & turned off both roughing pumps.


Thursday, October 11, 2018, 10:37: RGA on. Strip tools re-opened.

Thursday, October 11, 2018, 10:43: Waterlines opened. No response on RGA. Vacuum stable @ 3.40e-07T.

Thursday, October 11, 2018, 10:48: Power on.

Thursday, October 11, 2018, 10:49: Opened manual valve in gas control to operate small pump. Vacuum spike into Xe-05T range.

Thursday, October 11, 2018, 10:51: Very gradual opening on source gas control. Pump ineffective.

Thursday, October 11, 2018, 10:52: SV5 not opened yet. Open SV2. Vacuum spike noted.

Thursday, October 11, 2018, 10:53: SV5 opened/closed very quickly. Allow stabilization. Alternate between SV5 & SV2 until stable.

Thursday, October 11, 2018, 10:58: SV5 closed. Open SV4. Vacuum spike noted up to 3.3e-05T.

Thursday, October 11, 2018, 11:30: All Gas lines opened.

Thursday, October 11, 2018, 11:36: Sources on.

Thursday, October 11, 2018, 11:43: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.

Thursday, October 11, 2018, 11:46: IV4 opened. Error / closed / red. Fix. IV4 re-opened.

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 21.9 3.96
 TBHT 21.7 3.09
 COIL + EE 22.0 5.15
 TGHT  22.2 5.83

 Thursday, October 11, 2018, 12:08: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min


Friday, October 12, 2018, 08:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Friday, October 12, 2018, 08:13: Optics reset.Can Diagnostics re-cfg.

Friday, October 12, 2018, 10:49: Anode @ 200 V.

Friday, October 12, 2018, 10:50: Coil @ 10 A. Vacuum @ 6.25e-07T

Friday, October 12, 2018, 10:53: Coil @ 20 A. Vacuum @ 6.27e-07T

Friday, October 12, 2018, 10:56: Coil @ 30 A. Vacuum @ 6.27e-07T

Friday, October 12, 2018, 10:58: Coil @ 40 A. Vacuum @ 6.34e-07T

Friday, October 12, 2018, 11:00: Coil @ 50 A. Vacuum @ 6.34e-07T

Friday, October 12, 2018, 11:01: Auto-ramping TBHT to 300 A @ 2A per min.

Friday, October 12, 2018, 11:06: TBHT @ 300 A.

Friday, October 12, 2018, 11:51: Nothing found on Mass or wire scans?

Friday, October 12, 2018, 11:52: Anode set to 0 V.

Friday, October 12, 2018, 11:54: Still nothing found on wire scans.


Fernando:

Friday, October 12, 2018, 12:56: Anode leakage current is 6.105 mA on the readback with AV@200V Coil@0A TGHT@580A TBHT@310

Friday, October 12, 2018, 12:59 : This is very low anode lakage current. It should be on the bulk of 100 mA.

Friday, October 12, 2018, 12:59: Ramping up TBHT to 320 A @ 2A per min while keeping the AV@200 V. STOP

 


Aaron: Anode / Cathode BIAS PS polarity requires a reversal. John Chow notified. To be reversed Monday after 11am.

Friday, October 12, 2018, 13:24: Continue auto-ramping TBHT to 320 A @ 2A per min.

Friday, October 12, 2018, 13:30: TBHT 320 A / Read back @ 313.1 A.

Friday, October 12, 2018, 13:34: Wire & mass scans

Friday, October 12, 2018, 13:54: Anode to 0 V. Coil to 50 A.


Monday, October 15, 2018, 07:14: Auto-cooling. Coil to 0 A.

Monday, October 15, 2018, 11:54: Sources/power off. IV4 closed

Attachment 1: FEBIAD_Coil_Test_6_-_POS_Cathode.docx
Attachment 2: TS-2018-10-11-10-37.rga
  688   Monday, October 15, 2018, 14:23 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps

Anode / Cathode BIAS PS polarity reversed by John Chow. PS: Negative

Monday, October 15, 2018, 14:12: Power/sources on

Monday, October 15, 2018, 14:17: RGA on.

Monday, October 15, 2018, 14:22: Gas-lines opened. Vacuum ok @ 4.38e-07T

Monday, October 15, 2018, 14:29: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.

Monday, October 15, 2018, 14:30: Optics on

Monday, October 15, 2018, 14:33: BIAS / EZL / EE @ 30 / 13 / 1.5 kV.

Monday, October 15, 2018, 14:35: Anode @ 200 V.

Monday, October 15, 2018, 14:36: IV4 Open.


Tuesday, October 16, 2018, 06:33: Auto-ramping TBHT to 320 A @ 2A per min. 

Tuesday, October 16, 2018, 07:15: Coil @ 50 A. 

Tuesday, October 16, 2018, 14:40: FC6 Auto range & Polarity set. Mass scans work now.


FM

Wednesday, October 17, 2018, 10:02 : Auto-ramping TBHT to 330 A @ 2A per min. 

Wednesday, October 17, 2018, 13:21: Auto-ramping TBHT to 340 A @ 2A per min.

Wednesday, October 17, 2018, 13:45: Increasing TBHT voltage from 3.001 to 3.5 to  avoid voltage limitation when increasing the current

 Wednesday, October 17, 2018, 13:48: Auto-ramping TBHT to 345 A @ 2A per min.

Wednesday, October 17, 2018, 13:54: FC0 start decreasing once the ramp up finished. Vacuum ok @ 5.17e-7T.

Wednesday, October 17, 2018, 17:16: FC0 stable. Probably outgassing. Vacuum ok @ 5.37e-T

Wednesday, October 17, 2018, 17:16: Auto-ramping TBHT to 350 A @ 2A per min.

Wednesday, October 17, 2018, 17:30: Ramping finished. FC0 decreasing again. Vacuum ok @5.57e-7T

Wednesday, October 17, 2018, 17:51: Potassium signal seems to be decreasing and now the Argon is slightly higher than Potassium.

Wednesday, October 17, 2018, 17:51: Mass optimized for 40Ar, which is shown in the mass scan as ~39.52. Dipole current=102.2736 A

Wednesday, October 17, 2018, 17:52: Starting steerers an einzel lense tuning to increase FC6 signal. Will continue tomorrow


FM

Thursday, October 18, 2018, 08:03: FC0 signal is stable now. Auto-ramping TBHT to 355 A @ 2A per min.

Thursday, October 18, 2018, 08:08 Ramping finished. Vacuum ok @5.26e-7T. Anode current=65 mA.

Thursday, October 18, 2018, 09:55: FC0 looks stable now. Manually tapping 2 A to have TBHT=357A.

 Thursday, October 18, 2018, 11:40: Vaccum ok @ 4.56e-7T

Thursday, October 18, 2018, 16:25: Vacuum ok @ 5.28e-7T

Thursday, October 18, 2018, 16:26: Manually tapping 2 A to have TBHT=359A.

Thursday, October 18, 2018, 17:29: Steerers, einzel lens and dipole tune to increase signal on FC6. Argon current=4 nA. Total source current=54 nA.

Thursday, October 18, 2018, 17:37: Coil to 50A.

Thursday, October 18, 2018, 17:47: Closing Neon valve.

Thursday, October 18, 2018, 17:57: Closing Argon valve.

Thursday, October 18, 2018, 19:51: Assuming 720 nA entering the source (from Brad). Efficiency  measurement = 0.44%

Thursday, October 18, 2018, 19:52: Opening valves.

Thursday, October 18, 2018, 19:54: Vaccum ok @ 5.46e-7T


 FM

Friday, October 19, 2018, 08:27: Manually tapping 1 A to have TBHT=360.

Friday, October 19, 2018, 08:39: FC6 is stable. Closing Neon Valve.

Friday, October 19, 2018, 08:44: FC6 is stable. Closing Argon Valve.

 Friday, October 19, 2018, 09:13: TBHT@360A, AV=150V. Efficiency measurement = 0.41%

Friday, October 19, 2018, 09:16: Opening the valves.

Friday, October 19, 2018, 09:40: FC6 stable. Carefully increasing AV (anode voltage) to 200V keeping an eye on the AC (anode current).

Attachment 1: FEBIAD_Coil_Test_6-2_-_Neg_Cathode.docx
Attachment 2: TS-2018-10-15-14-15.rga
  691   Monday, October 22, 2018, 11:07 Aaron Schmidt LP-FEBIAD  41790-942752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps

Restarted post power outage.

Water & Turbos on.

Monday, October 22, 2018, 10:55: Power / sources on. MB1?

Monday, October 22, 2018, 11:07: Open gas lines slowly.

Monday, October 22, 2018, 11:11: Gas lines all opened. Vacuum @ 2.37e-06T & decreasing.


Tuesday, October 23, 2018, 08:00: MB1 PS on.

Tuesday, October 23, 2018, 08:03: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.

Tuesday, October 23, 2018, 08:08: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.

Tuesday, October 23, 2018, 08:10: Epics lost. Communication error. Internet loss.

Tuesday, October 23, 2018, 08:21: Auto ramp found halted in communication loss. Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min restarted from 14.0A.

Tuesday, October 23, 2018, 08:23: Anode @ 200 V.

Tuesday, October 23, 2018, 08:28: Optics set. IV4 opened.

Tuesday, October 23, 2018, 13:03: Auto-ramping TBHT / 320 A @ 2A per min.

Tuesday, October 23, 2018, 14:00: Coil @ 50 A. TBHT @ 330 A.

Tuesday, October 23, 2018, 14:30: Mass scans ok. TBHT back @ 320.

Emittance rig not calibrating?


Wednesday, October 24, 2018, 08:17 : E-rig drive motor PS re-plugged in. Switched on. E-rig calibrated & ready.

 FM:

Wednesday, October 24, 2018, 12:40 :  Vacuum 6.52e-7T. Auto-ramping TBHT  to 320 A @ 2A per min.

Wednesday, October 24, 2018, 13:02 : Auto-ramping finished. Anode Current@8.54mA. Vaccum ok @ 6.86E-7T

Wednesday, October 24, 2018, 13:40 : Vacuum 6.58e-7T. Auto-ramping TBHT  to 340 A @ 2A per min.

Wednesday, October 24, 2018, 13:55 : Auto-ramping finished. Anode Current@19.53mA. Vaccum ok @ 6.67E-7T

Wednesday, October 24, 2018, 15:18 : Vacuum 6.68e-7T. Auto-ramping TBHT  to 350 A @ 2A per min.

Wednesday, October 24, 2018, 15:27: Auto-ramping finished. Anode Current@41.51mA. Vaccum ok @ 6.82E-7T


Thursday, October 25, 2018, 08:27: IG6 Tripped off around 3am this morning. Attempts to restart, unsuccessful.

Thursday, October 25, 2018, 08:29: IV4 Closed. Vacuum group notified..

Thursday, October 25, 2018, 08:40: Filament burnt out. Vac group switched on IG6 secondary filament.

Thursday, October 25, 2018, 08:44: IV4 re-opened. Optics reset.


 Friday, October 26, 2018, 13:49: Auto-ramping TBHT / 360 A @ 1A per min.

Friday, October 26, 2018, 14:08:

TBHT @ 359.0 A / 3.074 V.

Anode @ 200 V / 94.017 - 95.238 mA.

Friday, October 26, 2018, 14:34: Mass & wire scans complete w/ screen shots on the word doc (FEBIAD COIL TEST 6-3 Caps in).


Sunday, October 28, 2018, 13:19: Remotely connect to check the status. Something happened around midnight.  See attached screenshots.

 It seems there is no bias. EPICS control whiteout.  Not sure how to proceed. Leaving evreything as is. 

Attachment 1: epics-plot-whiteout-181028_1322.PNG
epics-plot-whiteout-181028_1322.PNG
Attachment 2: epics-whiteout-181028_1322.PNG
epics-whiteout-181028_1322.PNG
Attachment 3: FEBIAD_COIL_Test_6-3_Caps_in.docx
Attachment 4: TS-2018-10-22-09-47.rga
  692   Monday, October 29, 2018, 10:56 Aaron Schmidt LP-FEBIAD  41790-942752-5Problems/SolutionsTS communications issues.

Sometime around 00:30 Sunday, October 28, 2018, the ISAC test stand lost communication to the PLC and shut down abruptly.

Monday, October 29, 2018, 09:00: PLC communications issues.

Rod N. was contacted this morning& the issues fixed by controls group.

  693   Monday, October 29, 2018, 11:03 Aaron Schmidt LP-FEBIAD  41790-942752-5DoneTest FEBIAD w/ Silver bolts & sealed end caps

Restarting FEBIAD

Monday, October 29, 2018, 10:56: Restart roughing & Turbo pumps.

Monday, October 29, 2018, 11:03: Ion gauges on.

Monday, October 29, 2018, 11:10: Power on

Monday, October 29, 2018, 11:12: Gas lines opened to pump down with TS. Vacuum @ 1.20e-05T.

Monday, October 29, 2018, 11:20: RGA restarted.


Tuesday, October 30, 2018, 07:24: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V.

Tuesday, October 30, 2018, 07:26: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.

Tuesday, October 30, 2018, 07:31: Optics set.

Tuesday, October 30, 2018, 07:32 : IV4 Opened.

Tuesday, October 30, 2018, 08:50: Auto ramping aborted. While the source does increment, the actual power supply does not. It's not actually ramping.

Tuesday, October 30, 2018, 08:51: Unable to bump up the coil either. Tapping down the all the voltage to 0.

Tuesday, October 30, 2018, 08:55: IV4 closed. Gases closed.

Tuesday, October 30, 2018, 08:57: Power shut off & restarted.

Tuesday, October 30, 2018, 09:01: Gases re-opened.

Tuesday, October 30, 2018, 09:03: Sources switched on. Manually bumped up TGHT & TBHT. No response.

Tuesday, October 30, 2018, 09:04: Gases closed. Sources off.

Tuesday, October 30, 2018, 10:41: IV4 Opened.

Tuesday, October 30, 2018, 10:47: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. Voltage limits reset for the TGHT, TBHT, & Coil. Responses given

Tuesday, October 30, 2018, 10:49: Auto-ramping TGHT / TBHT to 580 / 320 A @ 2A per min.

Tuesday, October 30, 2018, 10:55: Optics reset.

Tuesday, October 30, 2018, 11:01: Gases reopened. Vacuum @ 4.52e-07T.


Wednesday, October 31, 2018, 06:59: Auto-ramping TBHT to 330 A @ 2A per min.

Wednesday, October 31, 2018, 07:00: Coil @ 50 A.

Wednesday, October 31, 2018, 10:57 : Mass & wire scans appear ok.


FM:

Wednesday, October 31, 2018, 12:10 : Auto-ramping TBHT to 340 A @ 1A per min.

Wednesday, October 31, 2018, 12:49 : Vacuum @ 5.90e-07T.

Wednesday, October 31, 2018, 12:54 : Auto-ramping TBHT to 350 A @ 1A per min.

Wednesday, October 31, 2018, 15:25 : Vacuum @ 6.03E-7T.

Wednesday, October 31, 2018, 15:28 : Auto-ramping TBHT to 360 A @ 1A per min.

Wednesday, October 31, 2018, 15:34 : Changing Gain in FC0 from 33 nA to 100 nA

Wednesday, October 31, 2018, 15:42 : Increasing Gain in FC0 from 100 nA to 1 uA.

Voltage drop from 200 to 196 V.  The anode is current limited. Increasing the current limit on the anode from 100 mA to 110 mA .

Voltage back to 200 V 


FM

Thursday, November 01, 2018, 11:35 : Optics set to the previous tune. Check entry 688.

Anode set to 150 V. FC6 stable

Thursday, November 01, 2018, 11:37 Closing Neon Valve

Thursday, November 01, 2018, 12:38 : FC6 stable. Closing Argon valve.

Thursday, November 01, 2018, 13:05 : Assuming 720 nA entering the source (from Brad). Efficiency  measurement = 0.96%. Almost a factor of two larger than previous measurement with the same conditions!

Thursday, November 01, 2018, 13:08 : Opening the valves

Thursday, November 01, 2018, 15:41 : FC6 stable 5.38e-9A. Closing neon valve.

Thursday, November 01, 2018, 16:50 : FC6 stable overall 5.33e-9A. Closing argon Valve

Thursday, November 01, 2018, 18:42 : FC6 stable 1.44e-10A. efficiency= 0.72%

Opening gas valves


FM

Friday, November 02, 2018, 09:39 : Increasing AV to 200V.

Friday, November 02, 2018, 09:47 : Increasing anode current to 150 mA.

Friday, November 02, 2018, 18:01 : Coil sweep from 0-80 A for AV=25,50 completed. Efficiencies of 0.035 % and 0.34% respectively.

Leaving the cathode hot to continue test tomorrow morning.


Saturday, November 03, 2018, 18:01: Coil sweep from 0-80 A for AV=75,100 completed. Efficiencies of 0.56 % and 0.77% respectively.


Sunday, November 04, 2018, 09:01 : Anode current increased from 56 to around 95 mA overnight under the same conditions. This could indicate a cleaner surface on the cathode and hence a better emission or, the anode cathode distance is reducing fue to the thermal expansion.

Cooling down manually  TBHT to 300 A @ 2A per min.


Monday, November 05, 2018, 09:00: Short on TBHT appeared around 8 am. Investigate.

Monday, November 05, 2018, 09:15: Auto-cooling TGHT / TBHT @ 2 A per min.

Monday, November 05, 2018, 14:22: Gas lines closed.

Monday, November 05, 2018, 14:32: Sources/power off.

Monday, November 05, 2018, 14:40: Short confirmed up top. RGA off.

Monday, November 05, 2018, 14:43: IV4 closed/reset, Ion gauge off, Turbos off.

  695   Thursday, November 08, 2018, 10:54 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTest FEBIAD w/ Silver bolts & sealed end caps

Silver bolts used on Coil, TGHT, & TBHT. Back panel opened for new gas bottles.

Thursday, November 08, 2018, 10:52: Roughing

Thursday, November 08, 2018, 10:53: Doors sealed.

Thursday, November 08, 2018, 14:10: Turbo pumps started.

Thursday, November 08, 2018, 14:15: Ion gauge on.

Thursday, November 08, 2018, 14:23: RGA on.


Friday, November 09, 2018, 07:38: Waterlines opened. No response on RGA. Vacuum ok @ 5.18e-07T

Friday, November 09, 2018, 07:44 : Slowly start opening gas lines. Opened / closed SV5 initially, no response. Note* Opened SV3 with SV5 closed. Massive spike seen in vacuum.

Friday, November 09, 2018, 07:55 : SV3 opened / closed in conjunction with SV5 until stable vacuum reached. Begin opening SV4 w/ SV5 closed.

Friday, November 09, 2018, 08:09 : SV3 & SV4 opened with SV5, Stable vacuum reached. Begin opening SV2/SV1 w/ SV5 closed.

Friday, November 09, 2018, 08:15: All gas lines opened. Sources on.

Friday, November 09, 2018, 08:22: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. Optics switched on.

Friday, November 09, 2018, 08:40: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min. Loop to max values, increase of 0A until vacuum gets below 1.0e-06T. Vacuum 1.12e-06T.

Friday, November 09, 2018, 10:45: The vacuum wouldn't drop below 1.12e-06T. Ramping halted and gas lines closed. Vacuum dropped to 7.48e-07T. Gas lines opened again. Vacuum stable around 1.12e-06T. Significant Argon noted on RGA.

Friday, November 09, 2018, 10:52: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2A per min. Vacuum increment limit increased to 2.0e-06T


Tuesday, November 13, 2018, 08:32: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.

Tuesday, November 13, 2018, 11:08: Mass scans ok. Auto-ramping TBHT to 330 A @ 2A per min.

FM

Tuesday, November 13, 2018, 16:44: The anode drain current has increased 17mA since 11:23 am, however FC0 is still decreasing. I will keep monitoring to see if the behaviour of the anode drain current continues once FC0 has stabilized. If the anode drain current keeps increasing maybe we will observe the same failure from the previous FEBIAD.


FM

Wednesday, November 14, 2018, 11:02 FC0 is stable but the anode drain current is still increasing and now is at 85 mA. It started at ~52mA. From the strip tool it seems to be a 2-hour period where the anode drain current is stable.

Wednesday, November 14, 2018, 16:14 : Magnet tune for 40Ar. TMS:MB1=101.56126 A

Coil=50 A. FC6=19.37 nA

Wednesday, November 14, 2018, 16:16 : Closing Neon valve.

Wednesday, November 14, 2018, 16:26 : FC6=13.77 nA.

Wednesday, November 14, 2018, 16:27: Closing Argon valve 

Wednesday, November 14, 2018, 17:10: 0.119 nA.

Wednesday, November 14, 2018, 17:15 Assuming the 720 nA from Brad (I will recompute this value based on the new bottles). Efficiency with both gasses open= 2.67375% . Efficiecy with Argon bottle only=1.84%. Anode drain current~87.5mA

 Wednesday, November 14, 2018, 17:53: When opening the Neon valve, the vacuum reached ~1e-5 T and the test stand tripped. Ion source off, high voltage and some of the optics as well. Leaving the test stand as is. 

Wednesday, November 14, 2018, 17:58: Note to myself: How am i gonna take an efficiency measurement if every time I turned the gas valves the vacuum will increase to 1e-5 T. 


Thursday, November 15, 2018, 08:33: Sources at zero. Bring values to 0 before restarting. Reset optics.

Thursday, November 15, 2018, 08:45: Power to sources off. Open the back & double check gas bottles. All are tight.

Thursday, November 15, 2018, 09:35: All gas bottles opened.

Thursday, November 15, 2018, 09:58: Power/sources reset/on.

Thursday, November 15, 2018, 10:04: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV. Anode @ 200 V. IV4 opened. 

Thursday, November 15, 2018, 10:05: Auto-ramping TGHT / TBHT to 580 / 300 A @ 2A per min.

Thursday, November 15, 2018, 10:07: Optics reset.

FM

 Thursday, November 15, 2018, 18:46: Coil to 50 A. 


Friday, November 16, 2018, 08:40: Emittance Rig reset & calibrated.

 FM

Friday, November 16, 2018, 11:30 : Auto-ramping  TBHT to 310 A @ 1A per min.

Friday, November 16, 2018, 16:28 Friday, November 16, 2018, 16:28 : Gain in FC0 seems off. Reading on FC0 was 2.8e-8A but reading on FC6 was 4.5e-8A. In the last mass scan, I add up the highest peaks above 1e-9A  and the values was roughly 7e-8A. Switching the gain to 94uA in FCO shows 8.32e-8 A. This seems a better reading than before.

Friday, November 16, 2018, 16:30 Changing gacin on FC0 from 1 uA to 94 uA.


FM

Monday, November 19, 2018, 09:34 : Scanning from 0-450 V and recording Anode drain current.

IG1 reading is 3.01e-6 T.

Monday, November 19, 2018, 10:01 : When Moving away FC0, the optics goes yellow. Not sure which interlock is activated.

AS

Optics tripped during FC0 removal. Vacuum spikes also detected on IG1 & IG6. No response on RGA.

Monday, November 19, 2018, 11:17: RGA providing no data. Stop, restart, multiple times. 

Monday, November 19, 2018, 11:25: RGA shut down. No response from and attempt to restart. 

Monday, November 19, 2018, 11:30: FC0 opened. Optics tripped. Vacuum increased on IG6 up to 7.9e-06T & IG1 increased to 4.4e-06T. Shut again to avoid tripping the entire system as the vacuum climbed.

Monday, November 19, 2018, 11:34: Auto-cooling @ 2A per min. Ramp down & trouble shoot after.

Monday, November 19, 2018, 14:11: Tap down HV on sources to 0V. Close & reset IV4. After closing IV4, spike in Vacuum on IG6 noted. Drop in vacuum on IG1 noted.

  700   Wednesday, December 12, 2018, 13:22 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressAnode leak current check.

Wednesday, December 12, 2018, 13:15: Power / Sources on.

Wednesday, December 12, 2018, 13:20: RGA on / set.

Wednesday, December 12, 2018, 13:29: BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.

Wednesday, December 12, 2018, 13:30: Auto-ramping TGHT / TBHT to 10A @ 2A per min.

Wednesday, December 12, 2018, 13:36: IV4 open.

Wednesday, December 12, 2018, 13:37: Begin Anode check

Anode: 10 V. Current: 0.000 mA

Anode: 25 V. Current: 0.000 mA

Anode: 50 V. Current: 0.000 mA

Anode: 75 V. Current: 0.000 mA

Anode: 100 V. Current: 0.000 mA

Anode: 125 V. Current: 0.000 mA

Anode: 150 V. Current: 0.000 mA

Anode: 200 V. Current: 0.000 mA

Anode: 250 V. Current: 0.000 mA

Wednesday, December 12, 2018, 13:42: Coil to 10A. Anode: 250 V. Current: 0.000 mA

Wednesday, December 12, 2018, 13:43: Coil to 25A. Anode: 250 V. Current: 0.000 mA

Wednesday, December 12, 2018, 13:56: Auto-ramping TGHT / TBHT to 150A @ 2A per min.

Wednesday, December 12, 2018, 14:09: Auto-ramping halted @ 35A. Anode to 0 V. Monitor activity on FC0. 5 minutes.

Wednesday, December 12, 2018, 14:13: No changes observed on FC0. Anode back to 250 V.

Wednesday, December 12, 2018, 14:14: Auto-ramping TGHT / TBHT to 150A @ 2A per min.

Wednesday, December 12, 2018, 14:31: Optics all reset. 


Thursday, December 13, 2018, 07:31: Auto-ramping TGHT / TBHT to 200A @ 2A per min.

Thursday, December 13, 2018, 10:04: Auto-ramping TGHT / TBHT to 250A @ 2A per min.

FM Thursday, December 13, 2018, 10:40 : Auto-ramping TGHT / TBHT to 270A @ 2A per min.

FM Thursday, December 13, 2018, 12:44: Auto-ramping TGHT / TBHT to 290A @ 2A per min. 

FM Thursday, December 13, 2018, 12:56: FC0 gain set to 33nA

FM Thursday, December 13, 2018, 16:54: Anode drain current register at 310. Value was 1 mA. The resistor calculates is 30kOhm. Which is close to what was measured on the resistor on top 34kOhm.

With this new information. I will let the TBHT@290A and the TGHT@300A overnight.

Note to Aaron: Could you please heat up the target to 580A with the current settings we have.


Friday, December 14, 2018, 07:04:  Auto-ramping TGHT 580A @ 2A per min. TBHT remains @ 290 A. FC0 back in.

Friday, December 14, 2018, 14:15: Anode @ 250 V & 12.201 mA.

Friday, December 14, 2018, 14:22: BIAS /  EZL / EE to 0 V. Anode remains unchanged.

FM Friday, December 14, 2018, 18:04: TBHT down to 50. Anode drain current is still 12.21mA.

FM Friday, December 14, 2018, 18:05 Auto-cooling. i will keep monitoring the strip tools remotely.

  701   Monday, December 17, 2018, 12:03 Aaron Schmidt LP-FEBIAD  395530-342752-5 Anode leak current check.

Monday, December 17, 2018, 12:01: Connected Multimeter through feedthroughs J & L. Blue wire removed.

To run TGHT, TBHT, Anode ONLY. HV will remain locked with yellow tape over the keyhole. Currently locked out.


Tuesday, December 18, 2018, 08:37: Power / sources on

TGHT, TBHT, Anode, Coil on. NO HV.

Tuesday, December 18, 2018, 08:40: Turn off. Anode reading before PS on?

We found a steady climb on the Anode current via the epics controls, however no reading turned up on the multimeter. Disappears once the Anode PS is switched on.

Tuesday, December 18, 2018, 08:46: Power / sources on

TGHT, TBHT, Anode, Coil on. NO HV.

Tuesday, December 18, 2018, 08:49: Auto-ramping TGHT to 580 A @ 2 A per min.

Tuesday, December 18, 2018, 08:50: Anode set to 300 V.

 FM Tuesday, December 18, 2018, 13:42: TGHT @ 580 A Anode@300 V. Epics and the power supply shows ~20 mA. However the multimeter doesn't show any reading.

FM Tuesday, December 18, 2018, 14:25: Strange behavior noted on EE while doing the anode voltage scan. Screenshot added to the word document.

FM Tuesday, December 18, 2018, 14:25: Auto-ramping TBHT to 100 A @ 2 A per min

FM Tuesday, December 18, 2018, 15:40: Auto-ramping TBHT to 150 A @ 2 A per min

FM Tuesday, December 18, 2018, 16:26: Auto-ramping TBHT to 200 A @ 2 A per min

FM Tuesday, December 18, 2018, 17:08: Auto-ramping TBHT to 250 A @ 2 A per min

FM Tuesday, December 18, 2018, 17:38: Auto-ramping TBHT to 300 A @ 2 A per min

FM Tuesday, December 18, 2018, 17:20: Auto-ramping TBHT to 250 A @ 2 A per min

FM Tuesday, December 18, 2018, 18:37 : Nothing register on the multimeter, maybe we need to connect between A-B, or B-F. Cooling down to inspect the multimeter connection tomorrow.

FM Tuesday, December 18, 2018, 18:37: Auto-cooling TBHT/TGHT@ 2 A per min


FM Wednesday, December 19, 2018, 09:29: For the lasts 10 hours, the anode drain current has shown a steady value of 10.989 mA even though both the TBHT and the TGHT are off.

FM Wednesday, December 19, 2018, 10:47: Power supplies turned off in EPICS, Anode drain current still shows 4.839 on the readback.

Wednesday, December 19, 2018, 14:25: Power / Sources on. Anode to 300 V. - AS

Wednesday, December 19, 2018, 14:26: Auto-ramping TGHT to 300 A @ 2 A per min. - AS


Thursday, December 20, 2018, 06:42: Auto-ramping TGHT to 580 A @ 2 A per min. - AS

FM Thursday, December 20, 2018, 11:12 : Auto-ramping TBHT to 200 A @ 2 A/min

Thursday, December 20, 2018, 13:05 (Roughly) Power bump due to winds. Full TS shutdown.

  702   Thursday, December 20, 2018, 13:55 Aaron Schmidt LP-FEBIAD  395530-342752-5 Holiday shut down.

High winds caused a brief power outage that completely shutoff the ISAC test stand.

Locked out the power.

RGA checked & shutoff complete

Epics failure, computer restarted.

Thursday, December 20, 2018, 13:52: Shutting ISAC test stand down for the holidays. Checking Epics & operation first.

Thursday, December 20, 2018, 13:55: Roughing pump operating. Turbos left off. Backing valves opened. Epics whiteout on TS sources & optics.

TBHT, TGHT, Anode all brought to zero on epics, although still mostly white out.

Thursday, December 20, 2018, 14:14: Waterlines shut off at the main source & the TS is purged.

Note* Small leak directly on the fittings noticed on FS#5 right after the flow meter paddle wheel on the supply end.  All water flow was briefly halted during the power bump.

Epics still whited out.


Monday, January 07, 2019, 11:13: Fault report 11981 submitted.

  703   Tuesday, January 08, 2019, 08:11 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS restart

Tuesday, January 08, 2019, 08:00: Epics white out fixed. Ref: Fault report 11981.

Tuesday, January 08, 2019, 08:10: IV4 reset. Turbo Pumps on

TMS:IG6 & TSG:IG1 not responding. Timing out. Edi contacted

TMS:IG6 - Filament switched on controller.

TSG:IG1 - Filament switched over. Cable to ion gauge is burnt. Black wire inside the housing had melted along with the edges of the plastic. Replaced the entire cable & reconnected the ion gauge to the controller.

Tuesday, January 08, 2019, 08:48: IG6 & IG1 operation resumed. Vacuum pump down continued.

Tuesday, January 08, 2019, 08:55: FS5 waterline tightened for leak check. All lines closed.

Tuesday, January 08, 2019, 09:03: RGA restarted/on.

Tuesday, January 08, 2019, 09:05: Opening waterlines. vacuum at 2.66e-06T. Control room notified.

Tuesday, January 08, 2019, 09:10: Waterlines opened. Vacuum @ 2.57e-06T. No response on RGA.

Tuesday, January 08, 2019, 09:14: No leak noted on the FS#5 paddle wheel. Fixed with tightening.

Tuesday, January 08, 2019, 09:20: Control room noted 7.6L fill (1/4" drop approx) in DI water on this line. (Note this next year)

  709   Friday, February 22, 2019, 11:11 Aaron Schmidt LP-FEBIAD     Gas line backing pump tests

Backing "mini pump" testing.

-Open gas lines & auto ramp (If using HV, close up the back)

-HV on

-Close SV5, SV4, SV3 when ready. Wait until stable. Take measurement (1/2 hr approx)

-Turn down HV. Interlock, leave heaters on.

-Turn on mini pump.

-Open, SV4, SV3 carefully.

-Open MP valve. Wait 15 min. Close MP valve

-Carefully open SV5. Quick open & shut. Monitor vacuum 7.0e-06T trip limit.

-Monitor / record. Carefully open & close until stable.

-Close up TS w/ interlock

-HV on again & test.

 


Friday, February 22, 2019, 11:06: Auto-ramping TGHT / TBHT to 100 / 75 A. Gas lines open.

Friday, February 22, 2019, 11:31: HV on. BIAS / EZL / EE @ 5 / 1 / 0.1 kV. Anode @ 25 V - Low settings to check for trip and practice.

Friday, February 22, 2019, 11:43: HV unstable. Bump up. BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.

Friday, February 22, 2019, 12:36: SV3 closed (Neon)

Friday, February 22, 2019, 12:46: SV4 (Argon), SV5 closed.

Friday, February 22, 2019, 12:57: HV off.

Friday, February 22, 2019, 13:00: Interlock complete. Mini pump on.

Friday, February 22, 2019, 13:10: MP valve opened manually.

Friday, February 22, 2019, 13:16: SV3 open. SV4 open.

Friday, February 22, 2019, 13:19: MP valve closed. pump off. SV5 opened / closed fast & intermittent.

Friday, February 22, 2019, 13:22: SV5 open fully. Gas lines all open.

Friday, February 22, 2019, 13:24: HV on. Interlock out.

Friday, February 22, 2019, 13:27: BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.

Friday, February 22, 2019, 13:30: Setting reset, including optics. TGHT / TBHT did not trip.TEST 1 SUCCESS!.


Monday, February 25, 2019, 07:36: Auto-ramping TGHT / TBHT to 580 / 290 A. Gas lines open. 

Monday, February 25, 2019, 11:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200V

Monday, February 25, 2019, 13:38 : SV3 closed.

Monday, February 25, 2019, 14:25: SV5 closed.

Monday, February 25, 2019, 14:45: HV off. 

Monday, February 25, 2019, 14:50: Mini-pump on.

Monday, February 25, 2019, 14:53: Open MP valve

Monday, February 25, 2019, 14:57: Open SV3 & SV4

Monday, February 25, 2019, 14:59: Close MP valve.

Monday, February 25, 2019, 15:00: Open / Close SV5 intermittently until stable.

Monday, February 25, 2019, 15:01: SV5 Open.

Monday, February 25, 2019, 15:04: Locked up. Power back to HV. Optics switched on. FC0 closed. Ready for HV


Wednesday, February 27, 2019, 08:11: Auto-cooling @ 2 A per min 

Wednesday, February 27, 2019, 13:23: gas lines closed.


Friday, March 01, 2019, 10:35: IV4 reset

Friday, March 01, 2019, 10:42: Ion gauge 1 & the turbo pumps off.

  710   Friday, March 01, 2019, 14:51 Aaron Schmidt LP-FEBIAD     Gas lines test & Emissions measurement prep

Friday, March 01, 2019, 14:50:

SV5 replaced with a new valve.

SV1 disconnected from the He line and linked to the mini pump line.


Tuesday, March 05, 2019, 08:05: Roughing.

Tuesday, March 05, 2019, 08:36: Turbo pumps on.

Tuesday, March 05, 2019, 10:03: Vacuum at 1.30e-05T

Open SV3 & SV4. Vacuum remains unchanged. No response on the RGA.

Tuesday, March 05, 2019, 10:05: SV1 opened & closed. Responds well.

Tuesday, March 05, 2019, 10:06: Mini-pump on. MP manual valve closed.

Tuesday, March 05, 2019, 10:17: MP manual valve opened. No response on RGA. Vacuum stable / going down @ 1.13e-05T.

Tuesday, March 05, 2019, 10:25: SV1 open. No response on RGA. Vacuum stable / going down @ 1.02e-05T.

Tuesday, March 05, 2019, 10:35: SV1, SV3, SV4 closed. SV5 opened / closed. Minor response on RGA & Vacuum.

Tuesday, March 05, 2019, 10:40: SV5 opened fully to pump down.

Tuesday, March 05, 2019, 10:42: SV3 & SV4 opened fully to pump down.

Tuesday, March 05, 2019, 12:56: SV5 closed.

Tuesday, March 05, 2019, 12:57: SV3 & SV4 closed.

Tuesday, March 05, 2019, 12:59: SV1 to mini pump opened.

Tuesday, March 05, 2019, 13:06: SV3 & SV4 opened.

Tuesday, March 05, 2019, 13:27: SV1 closed. SV5 opened / closed in 'quick bursts'

Tuesday, March 05, 2019, 13:31: SV5 fully opened.

Tuesday, March 05, 2019, 13:43: Mini pump off.


Wednesday, March 06, 2019, 07:56: Mini-pump on. TS locked up. Power on. Gas lines open.

Wednesday, March 06, 2019, 07:59: RGA reset.

Wednesday, March 06, 2019, 08:00: Sources & optics on.

Wednesday, March 06, 2019, 08:02: Auto-ramping TGHT / TBHT to 100 / 75 A @ 2A per min. 

Wednesday, March 06, 2019, 08:07: BIAS / EZL / EE @ 10 / 5 / 0.5 kV - Low settings stable.

Wednesday, March 06, 2019, 08:19: IV4 opened.

Wednesday, March 06, 2019, 11:05: SV3 closed.

Wednesday, March 06, 2019, 11:10: SV4 & SV5 closed.

Wednesday, March 06, 2019, 11:11: SV5 re-opened.

Wednesday, March 06, 2019, 11:15: SV5 closed.

Wednesday, March 06, 2019, 11:16: SV1 to mini pump (running) opened.

Wednesday, March 06, 2019, 11:22: Sv3 & SV4 opened. No response on vacuum or RGA. SV5 good.

Wednesday, March 06, 2019, 11:30: Closed SV1, SV3, & SV4. open / close SV5 until stable.

Wednesday, March 06, 2019, 11:33: SV3 & SV4 opened.

Wednesday, March 06, 2019, 11:36: SV5 fully opened. No trip.

Wednesday, March 06, 2019, 11:40: Auto-ramping TGHT / TBHT to 350 / 250 A @ 2A per min.


Thursday, March 07, 2019, 07:23: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Thursday, March 07, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode 200 V

Thursday, March 07, 2019, 07:38: Something in the BIAS went horribly wrong. The Test Stand was crackling like a fire cracker. Very loud.

BIAS / EZL / EE / Anode off. Begin auto cooling.

Optics tripped. TMS:TP6 tripped

Attachment 1: gas-lines-changes.jpg
gas-lines-changes.jpg
Attachment 2: Gas_line_backing_pump_test_2019.docx
Attachment 3: TS-2019-03-05-09-45.rga
Attachment 4: TS-2019-03-06-08-00.rga
  711   Thursday, March 07, 2019, 07:55 Aaron Schmidt LP-FEBIAD    Problems/SolutionsTS restart - Troubleshoot BIAS spark

Thursday, March 07, 2019, 07:48: IV4 reset, BV6 & TMS TP6 reset.

Turbo pump restarted.

Auto cooling @ 2A per min.

Thursday, March 07, 2019, 08:40: Speed up Auto-cooling to 4A per min.

Thursday, March 07, 2019, 11:06: Power cycled the control boxes for the turbo pumps one by one. Operation in back to normal.

Thursday, March 07, 2019, 11:09: Switched to filament 2 on IG6. Reset.

Sparks from BIAS to EZL noticed at 1 kV. A wire was moved away from insulator 'O'

Sparks from BIAS to EZL @ 3kV


Friday, March 08, 2019, 11:00: Power supplies checked with John Chow.

BIAS (V) ------------------- EZL (V)

Set@-Read-Actual-----Set@-Read-Actual

1000- 982- 816---------1000- 987- 996

1500-1480-1300-------1500-1475-1530

2000-1993-1600-------2000-1993-1997

2500-2491-2070-------10000-9993-9964

3000-2989-2500

3500-3487-2900

4000-3985-3360

5000-4982-4145

Note* Lower reading on BIAS. Check the scaling with controls group.

Friday, March 08, 2019, 11:14: RGA, Ion gauge, Turbo pumps off.

Friday, March 08, 2019, 13:01: Venting for visual inspection.

Visual & Multimeter checks appear ok.

Friday, March 08, 2019, 14:37: Roughing.

Friday, March 08, 2019, 15:00: Turbos on.


Monday, March 11, 2019, 09:00: Switch everything on & slowly increase EZL & BIAS together

Monday, March 11, 2019, 09:30: Spark at approx 12-13 kV on BIAS. TGHT to 600A? Readback.

TGHT PS readback issues. John C contacted.

Power down.

Prep for TGHT PS removal. Possible capacitive effect? Test TS w/o TGHT PS after.

Monday, March 11, 2019, 13:55: New TGHT PS installed.


Tuesday, March 12, 2019, 08:37: Power / sources on

Tuesday, March 12, 2019, 08:50: BIAS to over 3kV. EZL set to 1 kV, but charged to over 5.5 kV on its own.

Tuesday, March 12, 2019, 09:30: Electrical check in the HV cage revealed a light oxide coating on the EZL post 'O'. This appears to have insulated the nut & feed through. Will require venting & removal to clean.

Ion gauge, turbo pumps off.

Tuesday, March 12, 2019, 11:10: Venting.


Wednesday, March 13, 2019, 08:30: Roughing. The brass nut & spark cap were polished, cleaned and re-installed. Other connections & wires cleaned.

Wednesday, March 13, 2019, 09:10: Turbo pumps started. Wiring up top re-connected.


Update* EZL PS removed. Tested by John C & Tomislav. The HV enable circuit wouldn't activate. Upon further investigating into the control and voltage regulating circuits of the PS, they found that the control ICs are 40% under powered, only getting 10V instead of 15V from its voltage regulator.

EZL PS to be replaced.

Wednesday, March 20, 2019, 07:03: Turbo pumps off

Wednesday, March 20, 2019, 08:28: Venting

Attachment 1: BIAS_spark_out_issue_-_2019.docx
Attachment 2: TS-2019-03-07-07-51.rga
  716   Friday, April 05, 2019, 07:02 Aaron Schmidt LP-FEBIAD  395530-342752-5In progressTS operation test - LP FEBIAD

Due to previous issues, a full run / test should be performed on the ISAC Test Stand.

Friday, April 05, 2019, 07:00: RGA on.

Friday, April 05, 2019, 07:03: Begin opening / closing gas lines until they can be opened & stable.

Friday, April 05, 2019, 07:14: Gas lines open.

Friday, April 05, 2019, 07:16: Power / sources on. Vacuum down to 1.25e-06T

Friday, April 05, 2019, 07:18: Optics on & Set.

Friday, April 05, 2019, 07:19: IV4 Opened.

Friday, April 05, 2019, 07:21: Auto-ramping TGHT / TBHT to 300 / 200 A @ 2A per min

Friday, April 05, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200 V.

Friday, April 05, 2019, 09:40: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min 

Friday, April 05, 2019, 14:01: Beam on FC0 & wire scans. Mass scan provides no reading. (Max current after CONST2 has changed). Inquire why.

No sparks have occurred on this run. Operationally, appears the PS switches were effective.

Friday, April 05, 2019, 14:05: Begin auto-cooling @ 2A per min.

Friday, April 05, 2019, 14:56 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.


Monday, April 08, 2019, 06:57: RGA off. Gas lines closed. IV4 Closed.

Monday, April 08, 2019, 07:01: Power / Sources off.

Monday, April 08, 2019, 07:01: IG1 off. Turbo pumps off.

Monday, April 08, 2019, 08:11: Venting.

Attachment 1: TS_-_New_BIAS__EZL_Testing_-_2019.docx
Attachment 2: TS-2019-04-05-07-00.rga
  724   Saturday, May 25, 2019, 12:43 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressInstalled TM4 Source Tray

Silver bolts on TGHT & Coil Lines. Oxide steel bolts on TBHT. Filed target to suit / fit (Previously heated). Rubber O-rings used instead of C-seals on the water blocks.

Saturday, May 25, 2019, 12:38: Leak check ok. 0.0E-07 Torr-I/sec. He @ 30 PSI. Carla checked the multi-pin connection. OK.

Saturday, May 25, 2019, 12:46: Roughing.

Saturday, May 25, 2019, 14:30: Turbo pumps started.

Saturday, May 25, 2019, 14:34: Ion gauge on.


Monday, May 27, 2019, 07:09: RGA on.

He Leak TEST #1:

Vacuum Group Leak detector LD#4.

08:39: Vacuum @ 1.58e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.36e-006

He: -1.05e-009

LD:  3.4e-07 atm-cc/sec

Monday, May 27, 2019, 08:50: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:00: Vacuum @ 1.60e-06T . RGA status:

Water: 2.33e-006

He: -4.89e-010

LD: 3.4e-07 atm-cc/sec. Purge and close FS#2.

Monday, May 27, 2019, 09:05: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:15: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted)

Water: 2.29e-006

He: -4.19e-009

LD: 3.6e-07 atm-cc/sec. Purge and close FS#3.

Monday, May 27, 2019, 09:26: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:35: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted, continued from FS#3)

Water: 2.25e-006

He: -7.36e-009

LD: 4.0e-07 atm-cc/sec. Purge and close FS#4.

Monday, May 27, 2019, 09:45: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:55: Vacuum @ 1.58e-06T. RGA status:

Water: 2.21e-006

He: -3.16e-010

LD:   4.2atm-cc/sec. Purge and close FS#5

Monday, May 27, 2019, 10:00: Depressurize lines. Connect HPA & Purge all lines. 

After 5 minutes: Vacuum @ 1.58e-06T . RGA status:

Water: 2.20e-006

He: -5.73e-010

LD: 4.3e-07 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Note: He spikes ongoing after opening line FS#3. Likely due to the use of rubber o-rings.

Monday, May 27, 2019, 10:51: Begin gradually opening the waterlines.

Monday, May 27, 2019, 10:54: Open FS#2. Vacuum @ 1.56e-06T. No Response on RGA.

Monday, May 27, 2019, 10:56: Open FS#3. Vacuum @ 1.58e-06T. No Response on RGA.

Monday, May 27, 2019, 11:00: Keiko stopped by. Soft restart done on PLC.

Monday, May 27, 2019, 11:04: Open FS#4. Vacuum @ 1.58e-06T. No Response on RGA.

Monday, May 27, 2019, 11:06: Open FS#5. Vacuum @ 1.58e-06T. No Response on RGA.

Waterlines Ok.

Prep to open gas lines.

Monday, May 27, 2019, 11:24: SV1 open w/ mini pump. Vacuum @ 1.49e-06T. No Response on RGA.

Monday, May 27, 2019, 11:25: Open SV3 & SV4 w/ mini pump. Vacuum @ 1.58e-06T. No Response on RGA. Allow 10 min.

Monday, May 27, 2019, 11:35: Mini pump switched off. SV1 Closed.

Monday, May 27, 2019, 11:37: Begin quickly opening and closing gas lines until the a stable vacuum is reached.

Monday, May 27, 2019, 11:40: Gas lines: SV3, SV4, & SV5 open.

Monday, May 27, 2019, 13:29: Power / Sources on.

Monday, May 27, 2019, 13:30: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.

Monday, May 27, 2019, 13:44: Open IV4.


Tuesday, May 28, 2019, 07:10: Gradually bring up HV to BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV in increments of 500 / 100 / 250

Tuesday, May 28, 2019, 07:22: Halted and brought back down. BIAS / EE / EZL @ 10 / -0.2  / 8.5 kV. Unusual current noticed on the EE. Only went to -200 V and the current increased to 1300uA. Typically at -1500V the current sits at 515uA.

Tuesday, May 28, 2019, 09:21: 50V added top Anode. EE current increases to 310.134uA. Odd. EE voltage increases affect the Anode current as well.

Tuesday, May 28, 2019, 09:22: Auto-cooling @ 4A per min.

Tuesday, May 28, 2019, 11:15: Power off. Gas lines closed.

Tuesday, May 28, 2019, 11:36: Connection discovered between Anode & EE. (Inside Vacuum). RGA off. IV4 closed.

Tuesday, May 28, 2019, 11:38: IG1 off. Turbos off.

Tuesday, May 28, 2019, 12:40: Venting

Tuesday, May 28, 2019, 15:02:

Short found on EE to Anode. Wires touching inside chamber. Fixed. Tubes touched to coil. No longer touching. Electrical check of source tray complete. Target re-installed.

Roughing.

Attachment 1: TM4_Source_Tray_-_2019_-_Leak_Check.docx
Attachment 2: TM4_Source_Tray_-_2019.docx
Attachment 3: TS-2019-05-27-07-08.rga
  725   Tuesday, May 28, 2019, 15:05 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressTM4 Source Tray - Episode II

SEE ELOG 724

Tuesday, May 28, 2019, 15:02: Roughing

Tuesday, May 28, 2019, 15:32: Turbos on.


Wednesday, May 29, 2019, 07:08: RGA on.

Wednesday, May 29, 2019, 07:10: Waterlines opened on FS#5. No response on RGA. Vacuum ok @ 1.32e-06T.

Power on.

Wednesday, May 29, 2019, 07:13: Mini-pump & manual valve opened. Prep / rough gas lines.

Alternate SV1, SV3, & SV4.

Wednesday, May 29, 2019, 07:27: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.

Wednesday, May 29, 2019, 07:32: Gas lines fully opened.

Wednesday, May 29, 2019, 07:37: Sources on.

Wednesday, May 29, 2019, 07:39: Anode to 50 V. No response on EE. EE to -100 V. Current response normal @ 34.188 uA.

Wednesday, May 29, 2019, 07:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode to 100 V. Coil to 10 A. Small sparks heard around 23 kV.

Wednesday, May 29, 2019, 07:54: IV4 opened.

Wednesday, May 29, 2019, 07:57: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.

Wednesday, May 29, 2019, 07:57: Spark* Computer screens flickered. RGA knocked out.

Wednesday, May 29, 2019, 08:00: Shut off & unplug the RGA.

Wednesday, May 29, 2019, 08:04: Optics set.

Wednesday, May 29, 2019, 08:23: Small spark* Nothing affected.

Wednesday, May 29, 2019, 08:35: Small spark* TSG:CBC restarted. 

Wednesday, May 29, 2019, 10:26: Small spark* TSG:CBC boosted from 500 V to 2501 V. Reset to 500 V. TPS:Q1 boosted from 790 / 675 V to 1500 / 1230 V. Reset.

Wednesday, May 29, 2019, 12:04: Auto ramping TGHT / TBHT to 580 / 270 A @ 2A per min. Over 100 minutes spark free.

Wednesday, May 29, 2019, 12:14: Spark* Reset optics & TSG:CBC

Wednesday, May 29, 2019, 12:35: Note*: Gradual climb on EZL current noticed as ramping current climbs.  

Wednesday, May 29, 2019, 13:01: Spark* Reset optics & TSG:CBC 

Wednesday, May 29, 2019, 13:50: Spark* Reset optics & TSG:CBC. TSG:CBC was boosted from 500 V to 2501 V.

Wednesday, May 29, 2019, 13:54:  A small but notable out gassing event, without an audible spark occurred. Brief instability in BIAS voltage & current. Vacuum spike to over 3.0e-06T.

Wednesday, May 29, 2019, 14:01: Auto ramping TBHT to 290 A @ 2A per min. TGHT at 577 (580.4 A)

Wednesday, May 29, 2019, 14:15: Wire Scans taken. TMS:RPM0A (X Axis) revealed no beam / peak. TMS:RPM0B (Y Axis) revealed a beam peak. Will attempt to steer TMS:RPM0A (X Axis) until beam peak is revealed.

Wednesday, May 29, 2019, 14:49: Further tuning required. Optics (TPS) Q1, Q2, Q3, Q4 all adjusted. FEBIAD source side (TSG) CB1, VCB1, & CBC all adjusted. Small peak found on RPM0A (X Axis). TMS:RPM0B (Y Axis) revealed a beam peak

Mass scans have not been successful. Yet.

Wednesday, May 29, 2019, 15:00: BIAS / EE / EZL brought to 0 kV. Allow out gassing of the source tray & protect equipment overnight.


Thursday, May 30, 2019, 07:43: BIAS / EE / EZL @ 30 / -1.5 / 13 kV

Thursday, May 30, 2019, 07:55: Spark* Reset optics & TSG:CBC.

Thursday, May 30, 2019, 08:37: Spark* Tripped TMS:TP6 turbo pump. Closed IV4. Tripped & Boosted  TPS:Q1. Reset optics & TSG:CBC. Open IV4.

Thursday, May 30, 2019, 09:00: Spark* Visible inside TS on the back of the optics tray off one of the EZL wires. EZL current spiked 1440 uA. Voltage dropped and became unresponsive over 8.5 kV.

Thursday, May 30, 2019, 09:13: BIAS / EE / EZL brought to 0 kV. Anode to 0 V. Coil to 0 A.

EZL to 7000V - Current spikes to over 500 uA.

Thursday, May 30, 2019, 09:32: Auto-cooling @ 2 A per min.

Thursday, May 30, 2019, 09:41: Auto-cooling @ 3 A per min.

Thursday, May 30, 2019, 09:49: IV4 closed. Gas lines closed. All sources expect TGHT / TBHT off.


Thursday, May 30, 2019, 12:24: Halt auto-cooling. Sources on.

Thursday, May 30, 2019, 12:32: BIAS @ 20 kV.

Thursday, May 30, 2019, 12:34: BIAS @ 30 kV.

Thursday, May 30, 2019, 12:38: BIAS / EE @ 30 / -1.5 kV

Thursday, May 30, 2019, 12:42: BIAS / EE @ 39.5 / -2 kV. Two sparks* Shut off turbos

Thursday, May 30, 2019, 12:45: Turbo pumps TP6 & TP1B restarted. Optics reset.

Thursday, May 30, 2019, 12:51: BIAS / EE / EZL  @ 40 / -2 / 5.25 kV.  Spark* Shut off turbos / reset.

Thursday, May 30, 2019, 12:56: BIAS / EE / EZL  @ 41.5 / -2.5 / 7.5 kV.  Spark* Shut off turbos / Optics. Reset.

Thursday, May 30, 2019, 13:01: BIAS / EE / EZL  @ 45 / -2.5 / 7.5 kV.  Visible spark inside the vacuum* Shut off turbos / Optics. Reset.

Thursday, May 30, 2019, 13:26: BIAS / EE / EZL  @ 46.25 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, off multi-pin corner? * Shut off turbos / Optics. Reset. FC0 affected. Reset.

Thursday, May 30, 2019, 13:38: Go pro setup

Thursday, May 30, 2019, 13:41: BIAS / EE / EZL  @ 48 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.

*Spark seen by Carla on the back of multi-pin (Anode wire perhaps?).

Thursday, May 30, 2019, 13:52: BIAS / EE / EZL  @ 48.9 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Did the go pro catch it? * Shut off turbos / Optics. Reset. FC0 affected. Reset.

*Spark seen on the base of the EZL.

Thursday, May 30, 2019, 14:00: BIAS / EE / EZL  @ 50 / -2.5 / 7.5 kV.

Thursday, May 30, 2019, 14:07: Spark* No trips

Thursday, May 30, 2019, 14:15: BIAS / EE / EZL  @ 50 / -2.5 / 7.5 kV.  * Shut off turbos / Optics. Reset. FC0 affected. Reset.

Thursday, May 30, 2019, 14:24 BIAS / EE / EZL  @ 51.3 / -2.5 / 7.5 kV.  * Shut off TP6 / Optics. Reset. RPM6B affected, ran up & down on its own. Reset.

Thursday, May 30, 2019, 14:25: BIAS back to 50 kV.

Thursday, May 30, 2019, 14:31: BIAS / EE / EZL  @ 51.9 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, from source tray to the rear ground electrode plate * Shut off turbos / Optics. Reset. FC0 affected. Reset.

IG6 ion gauge & TMS TP6 tripped. Fix. Switched to filament 2.

Thursday, May 30, 2019, 14:43: BIAS / EE / EZL  @ 52.8 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Bottom corner of multi-pin bracket * Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.

Thursday, May 30, 2019, 14:54: BIAS / EE / EZL  @ 53.5 / -2.5 / 7.5 kV. Sparks*

Thursday, May 30, 2019, 14:59: BIAS / EE / EZL @ 54 / -2.5 / 7.5 kV.  Visible spark inside the vacuum, Source tray EE over insulators to ground (Matt got a video, really nice)* Shut off turbos / Optics. Reset. FC0 affected. Reset. RPM6B Reset.

Thursday, May 30, 2019, 15:06: BIAS / EE / EZL @ 54.7 / -2.5 / 7.5 kV. Spark. Reset a bunch.

Thursday, May 30, 2019, 15:15: BIAS @ 55 kV.

Thursday, May 30, 2019, 15:24: BIAS / EE / EZL @ 0 kV.

Thursday, May 30, 2019, 15:24: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.


 Friday, May 31, 2019, 07:22: BIAS @ 10 kV. IV4 opened.

Friday, May 31, 2019, 07:33: BIAS / EE / EZL  @ 30 / -1.5 / 7.5 kV. Anode @ 200 V. Coil @ 20 A. FC0? No response.

Friday, May 31, 2019, 07:48: Coil @ 50 A. FC0 BIAS off. Troubleshoot FC0.

Friday, May 31, 2019, 08:01: Nothing on wire scans. FC0 randomly gaining, but no BIAS response. Rod N contacted on FC0.

Friday, May 31, 2019, 09:56: FC0 Fixed by Rod. N. MB1 acting up. Fixed itself through power / Canbus cycling?. Wire scans: RPM0A (X) non-responsive, RPM0B (Y) responds. Turn down HV to prep for gases.

Friday, May 31, 2019, 10:14: BIAS / EE / EZL / Anode @ 0 kV.

Friday, May 31, 2019, 10:18: Mini pump on. Manual valve opened. Prep / rough gas lines.

Alternate SV1, SV3, & SV4.

Friday, May 31, 2019, 10:31: Shut off mini-pump, manual valve, & SV1. Open / close SV5, SV3, & SV4.

Friday, May 31, 2019, 10:36: Gas lines fully opened.

Friday, May 31, 2019, 10:48: Vacuum stable @ 1.25e-06T. HV sources back on.

Friday, May 31, 2019, 11:04: BIAS / EE / EZL  @ 30 / -1.5 / 8.25 kV. Anode @ 200 V. Coil @ 50 A.

Friday, May 31, 2019, 11:32: Spark knocked out Optics & Steering. Wire scanners to zero. Unable to pick up wire scan for X or Y.

Friday, May 31, 2019, 11:35: BIAS / EE / EZL  @ 30 / -2.0 / 7.5 kV.

Friday, May 31, 2019, 12:05: Tuning adjusted. RPM0A (X) no response. RPM0B (Y) Response (It's back!!!).

Friday, May 31, 2019, 12:13: But it sparked...* Reset Optics. Re-scan to recover. Wire scanners to zero. Unable to pick up wire scan for X.


Carla, Fernando, Matt K.

Friday, May 31, 2019, 12:33  Using Brad's tuning values we see a nice peak at the first set of wire scanners on the y axis but nothing on the x axis. Using CB2, went from 200V to 900V in steps of 100V and saw nothing on the x axis. This seems to indicate x axis scanner is broken. Proceeding without x axis readout. Also tried with CB1 steerers, same effect.

Friday, May 31, 2019, 13:30: Auto-ramping TBHT to 305 A @ 2 A per min.

Friday, May 31, 2019, 13:31: EZL @ 8 kV.

Friday, May 31, 2019, 13:36: Coil to 0 A.

Friday, May 31, 2019, 15:32: Successful wire scans across RPM0A & RPM0B (X,Y) and  RPM6B & RPM6A (Y,X).

Friday, May 31, 2019, 16:27 : Wire scanners after the magnet look ok, but not enough beam to do a good emittance scan. Raised the tube heater to 310 A set point, got about 0.5nA at FC6. Probably could be solved with tuning, to be done Monday. Turning everything off but leaving target heating on. See pasted screenshots for current tune on mass 28.


Monday, June 03, 2019, 07:35: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 10 A.

Monday, June 03, 2019, 07:38: Coil @ 30 A.

Monday, June 03, 2019, 07:41: IV4 opened.

Monday, June 03, 2019, 07:48: BIAS / EE / EZL @ 0 kV. A named Hossein Rafighi with IT began poking around the HV rack and running cable w/ permission reference to Dale Nagra. Locked it out. No work permit was issued. Main Control Room Contacted.

Monday, June 03, 2019, 08:03: Cable run complete. Lock off. Sources on again.

Monday, June 03, 2019, 08:23: BIAS / EE / EZL @ 30 / -1.5 / 7 kV. Anode @ 200 V. Coil @ 30 A.

Monday, June 03, 2019, 08:35: BIAS / EE / EZL @ 40 / -2 / 8 kV

Monday, June 03, 2019, 08:40: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 08:41: BIAS @ 45 kV.

Monday, June 03, 2019, 08:45: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. Mass Magnet MB1 left off.

Monday, June 03, 2019, 08:55: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 08:58: BIAS / EE / EZL @ 50 / -2 / 8 kV.

Monday, June 03, 2019, 09:07 : Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 09:21: 2 Sparks* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset.

Monday, June 03, 2019, 09:29: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset. BIAS @ 54 kV.

Monday, June 03, 2019, 09:31: BIAS / EE / EZL @ 55 / -2.5 / 8 kV.

Monday, June 03, 2019, 09:35: Spark* Optics tripped. Turbo pump TP6 tripped. Close / re-open IV4. Reset

Monday, June 03, 2019, 09:44: Spark* Optics tripped. Turbo pumps  TP6 & TP1A Tripped. Close / re-open IV4. Reset

Monday, June 03, 2019, 09:49: Near BIAS 57.5 kV. Multiple sparks. BIAS unable to hold. Optics tripped, wire scanners & FC0 began running independently. Turbo pumps tripped.

Monday, June 03, 2019, 09:51: BIAS down to 50 kV. Burnt plastic smell lingering. Wait*

Monday, June 03, 2019, 09:57: Spark* Reset Optics. Turn off Optics for now.

Monday, June 03, 2019, 10:19: Spark* Reset Optics & Wire scanners. Anode current dropped from 10.989 mA to 7.768 mA

Monday, June 03, 2019, 10:36: BIAS Near 55 kV, brought back down to 50 kV. Multiple sparks. Optics tripped, wire scanners & FC0 began running independently. Anode current dropped from 7.328 mA to 6.105 mA. Knocked out the TGHT

The target heater dropped from 580A to 3.1 A. Attempted reset. Non-responsive.

Monday, June 03, 2019, 10:46: TGHT Still non-responsive. Bump down HV to open the cage & cycle the PS.

Monday, June 03, 2019, 11:02: BIAS / EE / EZL / Anode @ 0 kV.

Monday, June 03, 2019, 11:36: TGHT PS determined to have failed. Run w/ TBHT and test up to 50 kV.

Monday, June 03, 2019, 11:41: Sources on.

Monday, June 03, 2019, 13:17: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.

Monday, June 03, 2019, 13:24: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.

Monday, June 03, 2019, 13:37: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Monday, June 03, 2019, 13:49: Odd sound from Turbo pump TP6?

Vacuum @ 1.13e-06T. Was in the 5e-07 range earlier. Strip tool revealing gradual increase.

Monday, June 03, 2019, 13:52: Spark* Optics tripped, wire scanners & FC0 running independently. Reset

Monday, June 03, 2019, 14:13: Spark* Optics tripped. Loud, outside vacuum chamber.

Monday, June 03, 2019, 14:55: BIAS / EE / EZL @ 0 kV. Anode to 0 V.


Tuesday, June 04, 2019, 08:40: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.

Tuesday, June 04, 2019, 08:54: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV.

Tuesday, June 04, 2019, 09:09: BIAS / EE / EZL @ 45 / -2.5 / 7.5 kV.

Tuesday, June 04, 2019, 09:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Tuesday, June 04, 2019, 10:21: Spark* Optics & Turbo pump TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.

Tuesday, June 04, 2019, 10:23: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Almost 1 hour of no sparks.

Tuesday, June 04, 2019, 10:29: Note* Minute fluctuations of Anode current have ended after the spark. Also slight 'Burnt' smell noticed around the test stand area.

Tuesday, June 04, 2019, 10:32: BIAS / EE / EZL @ 51 / -2.5 / 7.5 kV.

Tuesday, June 04, 2019, 10:39: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.

Tuesday, June 04, 2019, 11:02: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.

Tuesday, June 04, 2019, 11:07: Spark* Outside TS. IG6 tripped /  reset. BIAS current spike. EZL current dropped afterwards near 460 uA from 550 uA.

Tuesday, June 04, 2019, 11:22: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV.

Tuesday, June 04, 2019, 11:27: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.

Tuesday, June 04, 2019, 11:35: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber.

Tuesday, June 04, 2019, 11:39: Spark* Optics tripped. Loud*, outside the vacuum chamber, above TS. EZL current jumped back up to 550 uA

BIAS current gradually increasing. from 50 uA to 55 uA since 11:35 spark.

Tuesday, June 04, 2019, 12:01: Runaway sparks* Turbo pumps & ion gauges tripped. Optics tripped. Wire scanners running independently. Both quiet & loud sparks. 3 Consistent marks in the strip tool. Reset.

Brought BIAS down to 55 kV. EE to -2.5 kV. BIAS & EZL currents have a small drop.

Tuesday, June 04, 2019, 13:21: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV. Over 1 hr no sparks.

Tuesday, June 04, 2019, 13:34: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.

Tuesday, June 04, 2019, 13:40: BIAS / EE / EZL @ 53.5 / -2.8 / 7.5 kV.

Tuesday, June 04, 2019, 13:41: Spark* Optics & Turbo pump - TP6 tripped. Wire scanners and FC0 operated independently. Restarted. Quiet spark* Inside Vacuum chamber.

Tuesday, June 04, 2019, 13:46: Spark* Loud*, outside the vacuum chamber, above TS. EZL current jumped from 580 uA to 610 uA approx & is gradually increasing. BIAS current slowly decreasing.

Tuesday, June 04, 2019, 14:02: BIAS / EE / EZL @ 54.5 / -2.9 / 7.5 kV. Variation in EZL & BIAS currents noted.

Tuesday, June 04, 2019, 14:08: BIAS / EE / EZL @ 55 / -3.0 / 7.5 kV.

Tuesday, June 04, 2019, 14:28: 20 minutes. No Spark.

Tuesday, June 04, 2019, 14:47: BIAS / EE / EZL @ 0 kV. Anode to 0 V.


Wednesday, June 05, 2019, 08:34: BIAS / EE / EZL @ 30 / -1.5 / 7.5 kV. Anode @ 200 V.

Wednesday, June 05, 2019, 08:35: Coil down from 30 to 0 A.

Wednesday, June 05, 2019, 08:36: Open IV4.

Wednesday, June 05, 2019, 08:37: Optics on / reset.

Wednesday, June 05, 2019, 08:38: Anode to 400 V.

Wednesday, June 05, 2019, 08:44: Anode to 450 V. TBHT @ 305 A.

Wednesday, June 05, 2019, 11:15: BIAS / EE / EZL @ 40 / -2.0 / 7.5 kV. Anode @ 200 V.

Wednesday, June 05, 2019, 11:30: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Wednesday, June 05, 2019, 11:40: BIAS / EE / EZL @ 52.5 / -2.7 / 7.5 kV.

Wednesday, June 05, 2019, 11:53: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 12:04: Spark* Optics & Turbo pump - TP6 tripped. Restarted. Quiet spark* Inside Vacuum chamber. bias to 54.9 kV.

Wednesday, June 05, 2019, 12:04: IV4 closed.

Wednesday, June 05, 2019, 12:15: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 12:16: Spark* Loud*, outside the vacuum chamber, above TS. EZL current came down from 601 uA to 537uA . IG6 off. Restarted. Bias to 54.9 kV.

Wednesday, June 05, 2019, 12:24: BIAS / EE / EZL @ 55 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 12:35: Spark* inside vacuum chamber. Optics & turbo pumps tripped

Wednesday, June 05, 2019, 13:35: Note* 1 hour @ 55 kV no sparks.

Wednesday, June 05, 2019, 13:42: BIAS / EE / EZL @ 56 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 13:49: BIAS / EE / EZL @ 57 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 13:52: TSG:CB1 went red. Communication lost it.

Wednesday, June 05, 2019, 13:54: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.

Wednesday, June 05, 2019, 14:01: Spark* inside vacuum chamber. Optics & turbo pumps tripped. Appears to be on the Anode. The test stand phone also redialed the last number contacted on its own.

Wednesday, June 05, 2019, 14:25: BIAS / EE / EZL @ 0 kV. Anode to 0 V. Auto-cooling @ 2 A per min.


Thursday, June 06, 2019, 09:10: Gas lines closed. Sources off. Optics off.

Thursday, June 06, 2019, 09:13: EE / BIAS on.

Thursday, June 06, 2019, 09:20: BIAS @ 30 kV.

Thursday, June 06, 2019, 09:30: BIAS @ 40 kV.

Thursday, June 06, 2019, 09:40: BIAS @ 45 kV. EZL slowly charging (Not on) from 12 to 420 V. EE with -15 V.

Thursday, June 06, 2019, 09:48: BIAS @ 50 kV. EZL / EE @ 606 / -17 V.

Thursday, June 06, 2019, 10:06:  BIAS @ 52.2 back to 50 kV. Loud buzzing heard up top. Charge on EZL from 600 V to 1200 - 2000 V fluctuations. EZL & EE to be brought up before we break something.

Thursday, June 06, 2019, 10:16: BIAS / EE / EZL @ 50 / -2.5 / 7.5 kV.

Thursday, June 06, 2019, 10:27: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV.

Thursday, June 06, 2019, 10:39: BIAS / EE / EZL @ 57.5 / -2.8 / 7.5 kV.

Thursday, June 06, 2019, 11:04: BIAS / EE / EZL @ 58 / -2.9 / 7.5 kV.

Thursday, June 06, 2019, 11:06: Buzzing / crackling up top in the cage again. Unstable voltage drops. BIAS to 57 kV.

Thursday, June 06, 2019, 11:11: BIAS / EE / EZL @ 58 / -2.9 / 8.25 kV.

Thursday, June 06, 2019, 11:27: BIAS was up to 58.5 & EZL to 9 kV. Buzzing / crackling. Unstable voltage drops / Current increase. BIAS / EZL to 57.5 / 8.5 kV.

Thursday, June 06, 2019, 11:36: BIAS was up to 58.0 & EZL to 9 kV. Buzzing / crackling. More unstable voltage drops / Current increases. BIAS dropped on it's own to 56.1 kV. BIAS / EZL to 56 / 7.5 kV.

Thursday, June 06, 2019, 11:36: Spark*. Inside chamber. Turbo pumps tripped. Buzzing stopped.

Thursday, June 06, 2019, 11:51: Unable to surpass 57 kV before voltage breakdown. Buzzing comes back. Breakdown dropped to 51 kV on BIAS.

Thursday, June 06, 2019, 11:53: BIAS @ 50 kV. EZL to 0, PS off, in attempt to relieve EZL current.

Thursday, June 06, 2019, 11:56: BIAS @ 50 kV. EZL to 7.5 kV w/ 1245 uA. Typically at 550-600 uA on EZL. Unable to relieve the current.

Thursday, June 06, 2019, 12:18: BIAS / EE / EZL @ 55 / -2.7 / 7.5 kV. Current: BIAS / EZL @ 65 / 1306 uA.

Thursday, June 06, 2019, 13:14: BIAS / EE / EZL @ 56 / -2.7 / 7.25 kV. Current: BIAS / EZL @ 70 / 1450 uA.

Thursday, June 06, 2019, 13:15: Voltage breakdown. Buzzing / crackling back. Breakdown dropped to 56.2 kV on BIAS. BIAS set to 56.1 kV to stabilize.

Thursday, June 06, 2019, 13:19: EZL current limit increased.

Thursday, June 06, 2019, 13:30: BIAS / EE / EZL  @ 56.5 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1856 uA.

Thursday, June 06, 2019, 13:31: Passed to BIAS 56.6 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.6 kV on BIAS. BIAS set to 55.5 kV to stabilize.

Thursday, June 06, 2019, 13:51: BIAS / EE / EZL  @ 56.2 / -2.7 / 7.00 kV. Current: BIAS / EZL @ 70 / 1950 uA.

Thursday, June 06, 2019, 13:52:  BIAS 56.3 kV. Voltage breakdown. Buzzing / crackling. Breakdown dropped to 55.1 kV on BIAS. BIAS set to 55.0 kV to stabilize. Unable to regain HV. Decreases each time we go up.

Thursday, June 06, 2019, 14:00: Limited via the test stand voltage breakdown up in the cage. Source tray held @ 58 kV.

Bring it down.

Thursday, June 06, 2019, 14:31: BIAS / EE / EZL @ 0 kV.


Friday, June 07, 2019, 06:41: Power / Sources off.

Friday, June 07, 2019, 06:43: IG1 & Turbo pumps off.

 

 

 

Attachment 1: TM4_Source_Tray_-_2019_-_2.docx
Attachment 2: TS-2019-05-29-07-08.rga
Attachment 3: TM4_Source_Tray_-_2019_-_3_-_HV_-_1.docx
Attachment 4: TM4_Source_Tray_-_2019_-_4_-_HV_-_2_-_Heat_on.docx
Attachment 5: TM4_Source_Tray_-_2019_-_5_-_HV_over_50_-Heat_on.docx
  731   Tuesday, June 11, 2019, 14:33 Aaron SchmidtTest FEBIADLP-FEBIAD  395530-342752-5In progressISAC Source tray re-installed w/ optics tray.

Tuesday, June 11, 2019, 14:33: Roughing.


Wednesday, June 12, 2019, 08:18: Venting to install FEBIAD.

Wednesday, June 12, 2019, 09:13: LP-FEBIAD installed. Roughing.

Wednesday, June 12, 2019, 11:13: Turbo pumps on.

Wednesday, June 12, 2019, 11:21: Ion gauge on. 

Wednesday, June 12, 2019, 11:48: RGA re-connected & switched on.


Thursday, June 13, 2019, 10:27:

He Leak TEST:

Vacuum Group Leak detector LD#4.

Thursday, June 13, 2019, 10:28: Vacuum @ 1.60e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35: LD baseline after opening valve to turbo pumps: 1.2e-09 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.20e-006

He: 4.55e-010

LD:  1.2e-09 atm-cc/sec

Thursday, June 13, 2019, 10:35:

Open line FS#2 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:40 Vacuum @ 1.54e-06T . RGA status:

Water: 2.20e-006

He: 4.20e-010

LD: 0.1e-09 atm-cc/sec. Purge and close FS#2.

Thursday, June 13, 2019, 10:45: Open line FS#3 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:50: Vacuum @ 1.52e-06T. RGA status:

Water: 2.18e-006

He: 3.68e-010

LD: 0.7e-09 atm-cc/sec. Purge and close FS#3.

Thursday, June 13, 2019, 10:50: Open line FS#4 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 10:55: Vacuum @ 1.54e-06T. RGA status:

Water: 2.16e-006

He: 9.24e-011

*LD: 3.7e-09 atm-cc/sec. Run for another 5 minutes.

Thursday, June 13, 2019, 11:00: Vacuum @ 1.52e-06T. RGA status:

Water: 2.15e-006

He: 2.06e-010

*LD: 0.7e-08 atm-cc/sec. Potential He escaping through o-rings*

Purge and close FS#4.

Thursday, June 13, 2019, 11:01: Open line FS#5 . Pressurize to 30 PSI. Record after 5 minutes

Thursday, June 13, 2019, 11:06: Vacuum @ 1.52e-06T. RGA status:

Water: 2.13e-006

He: 2.75e-010

LD: 1.7e-08 atm-cc/sec. Purge and close FS#5

Thursday, June 13, 2019, 11:07: Depressurize lines. Connect HPA & Purge all lines. 

Thursday, June 13, 2019, 11:12: Vacuum @ 1.54e-06T . RGA status:

Water: 2.12e-006

He: 6.21e-010

LD: 3.3e-08 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Thursday, June 13, 2019, 11:20: Vacuum @1.52e-06T :Begin gradually opening the waterlines.

Thursday, June 13, 2019, 11:22: Open FS#2. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#3. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:23: Open FS#4. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:24: Open FS#5. Vacuum @ 1.52e-06T. No Response on RGA.

Thursday, June 13, 2019, 11:28: Power sources: Tested. TGHT PS is still a no go. Power switched off, lock out.

Thursday, June 13, 2019, 14:03: New TGHT PS installed.

Thursday, June 13, 2019, 14:06: Power / sources on.

Thursday, June 13, 2019, 14:20: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. EZL current @ 61 uA. EZL appears to be fixed. :)

Thursday, June 13, 2019, 14:21: Spark*

Thursday, June 13, 2019, 14:29: Sources to 0 kV. FS#8 needs re-connection.

Thursday, June 13, 2019, 14:43: FS#8 connected. Vacuum ok @ 1.52e-06T. No response on RGA.

Thursday, June 13, 2019, 14:45: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min.


Friday, June 14, 2019, 06:52: Restart RGA.

Friday, June 14, 2019, 08:37: Run mini pump to prep gas-lines.

Friday, June 14, 2019, 08:44: Close SV1, manual valve & turn off mini pump. Gradually open gas lines.

Friday, June 14, 2019, 08:48: Gas lines fully opened.

Friday, June 14, 2019, 08:49: Auto-ramping TGHT / TBHT to 570 / 270 A @ 2 A per min.

Friday, June 14, 2019, 08:52: HV sources ready.

FM

Friday, June 14, 2019, 11:11: Anode current @ 0V 7.326mA. Setting Anode to 150 V.

AS

Friday, June 14, 2019, 11:16: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.

Friday, June 14, 2019, 11:18: Optics set.

Friday, June 14, 2019, 11:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.

Friday, June 14, 2019, 14:39: Multiple wire scans attempted since 1pm. Controls & Diagnostics contacted. Ongoing troubleshooting.


Monday, June 17, 2019, 08:34: TMS:MB1 - Reset. 

Monday, June 17, 2019, 09:18: Auto-ramping TBHT to 310 A @ 2 A per min.

FM

Monday, June 17, 2019, 10:30: TBHT manually tapped to 320 A  ~2A/min


Tuesday, June 18, 2019, 18:42 : BIAS / EZL / EE @ 0 kV. Anode @ 0 V.

Tuesday, June 18, 2019, 18:43: Begin auto-cooling @ 2A per min.


AS

Wednesday, June 19, 2019, 07:10: IV4 Closed.

Wednesday, June 19, 2019, 07:12: Gas lines & Sources / power off.

Wednesday, June 19, 2019, 07:15: RGA off.

Wednesday, June 19, 2019, 07:16: IG1 & Turbo pumps off.

Wednesday, June 19, 2019, 08:35: Purging / venting.

  753   Thursday, August 08, 2019, 09:12 Aaron Schmidt LP-FEBIAD   42752-7In progressP2N Setup - LP-FEBIAD target

Inserted a used (heating) LP-FEBIAD target with a basic heat shield assembly with no end plate foil on the window side to observe heating. The P2N Coil / TGHT connections were added.

Test whether the TS connections are affecting the P2N heating or if it's the P2N target itself.

-Heat the TGHT only, observe, then ramp down.

-Heat Coil only, observe, then ramp down.

-Heat TGHT w/ Coil, observe, then ramp down.

Note* Heating should be even across the target. Elog & take pictures.

NO HV ALLOWED!!!!

Thursday, August 08, 2019, 09:05: Roughing.

Thursday, August 08, 2019, 09:14: BV1A closed to allow pressure stabilization. Opened about within 2 seconds later with BV1B.

Thursday, August 08, 2019, 09:41: Turbo pumps on.

Thursday, August 08, 2019, 09:47: Ion gauge on.

Thursday, August 08, 2019, 10:37: RGA on.

TSG:CG1A & TSG:CG1B do not appear to be pumping down efficiently - May need to swap out TSG:RP1 after this test. Last done April 18, 2018. elog: 655.


Friday, August 09, 2019, 08:49: Power on.

Friday, August 09, 2019, 08:51: Waterlines opened. No response on RGA. Vacuum ok @ 3.03e-06T

Friday, August 09, 2019, 08:56: Auto-ramping TGHT  @ 4 @ per min to 150 A.

Friday, August 09, 2019, 10:10: Ramping the TGHT down from 150 A to 0A.

Friday, August 09, 2019, 10:39: Anode Current @ 200 mA w/ 19V? Anode PS on. Voltage & current dropped off.

Friday, August 09, 2019, 11:18: TGHT and TBHT power supplies ramped to 150A each, total of 300A in the target

Friday, August 09, 2019, 13:12:  Target glows symmetrically. TGHT and TBHT ramped from 150A to 200A each for a total of 400A on the target

Friday, August 09, 2019, 14:05: RGA error.

Friday, August 09, 2019, 14:08: RGA Restarted.

Friday, August 09, 2019, 14:08: Target heating evenly on total 400 A.

Friday, August 09, 2019, 15:57:  Auto-ramping TGHT/TBHT  @ 4 @ per min to 250/250 A.

Friday, August 09, 2019, 16:28: Vacuum limit reach at 241 and 238 A for TGHT and TBHT, respectively.

Friday, August 09, 2019, 16:28: Auto-cooling started at 4A/min


Monday, August 12, 2019, 09:22: Sources off. RGA off.

Monday, August 12, 2019, 10:04: Power off. Ion gauge off. Turbos off.

Attachment 1: 20190808_085752.jpg
20190808_085752.jpg
Attachment 2: 20190808_085758.jpg
20190808_085758.jpg
Attachment 3: 20190809_135736.jpg
20190809_135736.jpg
Attachment 4: 20190809_135747.jpg
20190809_135747.jpg
Attachment 5: 20190809_135820.jpg
20190809_135820.jpg
Attachment 6: Aug_2019_test_target_-_P2N_-_LP-FEBIAD_setup.docx
Attachment 7: TS-2019-08-08-10-37.rga
Attachment 8: TS-2019-08-09-14-07.rga