ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  56   Friday, November 18, 2011, 09:44 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3Electrical checkElectrical checks of TM#1 with UCx#3 have
been completed. They all appear to be with
in operational range. All megger checks were
 ITW_UC#3_Elec_check.PDF 
  57   Friday, November 18, 2011, 09:56 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 InstallationUCx#3 has been installed on TM1.
Leak check also complete.
Base Leak Rate 0.0 x 10-9
  
  58   Friday, November 18, 2011, 11:09 Travis CaveConditioning StationStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 has been moved from the
south hot cell to the conditioning station.
Move went well.
  
  59   Friday, November 18, 2011, 16:29 Bevan MossConditioning StationStandard OperationTM1N/AHigh Voltage (HV) testing TM1 was high voltage tested without
a target on November 16, 2011 with Don Jackson,
Pierre Bricault, and Bevan Moss. The module
 TM1_High_Voltage_Test_Nov_16_2011.JPG 
  60   Monday, November 21, 2011, 13:49 David WangConditioning StationStandard OperationTM1 TM1 full leak check in conditioning stationTM1 full leak check in conditioning station
has been fulfilled this morning.Both air
to vacuum leak check and waterlines helium
  
  61   Tuesday, November 22, 2011, 15:07 Bevan MossConditioning StationStandard OperationTM1UCx #3HV testing High Voltage (HV) testing was completed
on TM1 today. Vacuum was very good 1.9 x
10^-7 T in the service cap, 3.2 x 10^-7 in
 UCx_#3_HV_testing.JPG 
  62   Thursday, November 24, 2011, 10:39 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from conditioning
station to west target station. Move went
well.
  
  63   Thursday, November 24, 2011, 10:40 Travis CaveITWStandard OperationTM1UCx#3Module moveTM#1 with UCx#3 moved from the conditioning
station to the west target station.
  
  72   Wednesday, February 01, 2012, 09:54 David WangITWMaintenanceTM1 ITW and TM1 winter shut down vacuum leak checkITW and TM1 winter shut down vacuum leak
check had been finished yesterday.All ITW
primary vacuum vessel, secondary vacuum vessel,
  
  73   Monday, March 12, 2012, 09:19 Travis CaveSouth Hot-CellStandard OperationTM1UCx#3module moveTM#1 with UC#3 was moved from the west
maa to the south hot cell, move went well
  
  74   Monday, March 12, 2012, 10:03 chad fisherSouth Hot-CellStandard OperationTM1UC#3UC#3 RemovalUC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of
 IMG_0610.JPGIMG_0616.JPG 
  75   Monday, March 12, 2012, 11:54 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule movedTM#1 has been moved from the south hot
cell to the north east silo, move went well.
  
  76   Tuesday, March 13, 2012, 09:42 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 AutopsyAn autopsy was performed on UCx#3 yesterday
afternoon. This autopsy followed the plan
written by Anders. Indeed, both sides of
  
  77   Tuesday, March 13, 2012, 09:43 chad fisherSouth Hot-CellStandard OperationTM1UCx#3UCx#3 to spent vaultUCx#3 was packaged into a spent can, double
bagged and the bag and cans filled with argon
as much as possible. Lid was attached and
 Vault_Storage_March_13_2012.pdf 
  78   Tuesday, March 13, 2012, 12:24 Anders MjosSouth Hot-CellStandard OperationTM1UCx#3UCx#3 Autopsy

    

       
            
 Inspection_of_UCx#3_in_the_South_Hot_Cell.docx 
  82   Thursday, April 12, 2012, 09:38 Travis CaveConditioning StationStandard OperationTM1no targetMove ot TM#1TM#1 has been moved from the NE silo to
the Conditioning Station.
  
  83   Thursday, April 12, 2012, 14:40 David WangConditioning StationDevelopmentTM1 conditioning staion and TM1 is under TP1 and TP2 pumping now.TM1 moved to conditioning station to today.
After moving, I connected the vacuum system
which include all gauges ,vacuum lines ,
  
  84   Friday, April 13, 2012, 12:31 David WangConditioning StationDevelopmentTM1 TM1 and conditioning station leak check.
 

 Normal
  0

 
   
  
  85   Monday, April 16, 2012, 16:17 Bevan MossConditioning StationStandard OperationTM1No TargetHigh Voltage Test A high voltage test was completed
on a target free TM1 in the conditioning
station. Only the turbo pumps on the target
  
  86   Tuesday, April 17, 2012, 10:15 chad fisherSouth Hot-CellStandard OperationTM1Nb#6Target inserted into south hot cellNb#6 has been inserted into the south hot
cell in preparation for ionstallation onto
TM1. During the pre-insertion inspection
  