Message ID: 77     Entry time: Tuesday, March 13, 2012, 09:43
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx#3 
Subject: UCx#3 to spent vault 

UCx#3 was packaged into a spent can, double bagged and the bag and cans filled with argon as much as possible. Lid was attached and can moved to the storage vault. The target was placed in in Pail 93, and placed into slot 1C of the vault, it was 11.7mSv/hr when removed from the south hot cell. See attached file for latest vault details

Attachment 1: Vault_Storage_March_13_2012.pdf  51 kB  Uploaded Tuesday, March 13, 2012, 12:14  | Show | Hide all