Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 73     Entry time: Monday, March 12, 2012, 09:19
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx#3 
Subject: module move 

TM#1 with UC#3 was moved from the west maa to the south hot cell, move went well

ELOG V2.9.2-2455