Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 63     Entry time: Thursday, November 24, 2011, 10:40
Author: Travis Cave 
Category: ITW 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx#3 
Subject: Module move 

TM#1 with UCx#3 moved from the conditioning station to the west target station.

ELOG V2.9.2-2455