Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC  Not logged in ELOG logo
Message ID: 56     Entry time: Friday, November 18, 2011, 09:44
Author: Travis Cave 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: UCx#3 
Subject: Electrical check 

Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts. See attached file for details.

Attachment 1: ITW_UC#3_Elec_check.PDF  173 kB  | Show | Hide all
ELOG V2.9.2-2455