Message ID: 86     Entry time: Tuesday, April 17, 2012, 10:15
Author: chad fisher 
Category: South Hot-Cell 
Type: Standard Operation 
Module: TM1 
Target/Number: Nb#6 
Subject: Target inserted into south hot cell 

Nb#6 has been inserted into the south hot cell in preparation for ionstallation onto TM1. During the pre-insertion inspection I noticed that I could see the foil installed into the ionizer tube and that in did not seem to be seated or concentric to the tube itself. I had Anders and Friedhelm check this and they deemed that it was ok.